CtrlS Chandanvelly AI-ready data center park

Announced

India · 1 project · Last reported

Summary

CtrlS Datacenters announced in January 2025 a 40-acre data center park at the planned Chandanvelly Industrial Park near Hyderabad, Telangana, designed for more than 600 MW of IT load at full build. CtrlS said 250 MW of power had been sanctioned for the first phase, served by a dedicated gas-insulated substation expandable to 900 MW, with buildings designed for up to 135 kW per rack and immersion cooling up to 300 kW per rack. No construction update was found.

Source record as of 2025-01-23 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 17.23270, 78.17130 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

CtrlS Chandanvelly AI-ready data center park

Announced last observed as of · Reported status

Location: Chandanvelly, Telangana, IN. Sources name the Chandanvelly Industrial Park near Hyderabad without an address; the point is the Chandanvelly village coordinate from its Wikipedia article, so it marks the village rather than the parcel. W.Media; W.Media; APAC News Network; Wikipedia

Use: Ai unspecified, Colocation

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacitymore than 600 MWPlanned · Campus · It load2025-01-22Potential IT load at full development.W.Media; APAC News Network
Power capacity250 MWContracted · Phase · Grid connection · Phase 12025-01-22Power capacity CtrlS said was sanctioned for the first phase.W.Media; APAC News Network
Power capacityup to 900 MWPlanned · Campus · Grid connection2025-01-22Expandable rating of the planned dedicated gas-insulated substation.W.Media; APAC News Network
Land area40 acresReported · Campus2025-01-22W.Media; APAC News Network

Companies and organizations

NameRoleNotesSources
CtrlS Datacenters LtdDeveloperW.Media; W.Media; APAC News Network

Timeline

DateEventActual or plannedNotesSources
2025-01-21AnnouncedActualW.Media; APAC News Network

Power supply

TypeDescriptionSources
GridDedicated gas-insulated substation expandable to 900 MW, with 250 MW sanctioned for phase 1.W.Media; APAC News Network
SolarSolar module facades planned on the western and southern elevations of the buildings.W.Media

Two days after the announcement, CtrlS signed an MoU with the Telangana government at the World Economic Forum in Davos for more than Rs 10,000 crore of investment in a cluster of AI-ready data centers in the state; the coverage does not tie that amount to Chandanvelly, so it is not recorded as a site investment. No 2025 or 2026 construction or status update was found; status reflects the January 2025 announcement. Wikipedia is cited only for the village coordinate.

Sources for these details
Companies
  • Developer: CtrlS Datacenters Ltd (unknown scope) evidence
  • Developer: CtrlS Datacenters Ltd (unknown scope) evidence
  • Developer: CtrlS Datacenters Ltd (unknown scope) evidence
Source and location review
Status source
CtrlS to build new AI-ready DC park near Hyderabad evidence row
W.Media · published 2025-01-22 · Trade publication
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 642 days before the data update on 2026-10-27

Location details
Coordinates
17.23270, 78.17130
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources name the Chandanvelly Industrial Park near Hyderabad without an address; the point is the Chandanvelly village coordinate from its Wikipedia article, so it marks the village rather than the parcel.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
bf0ce2e0

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for CtrlS Chandanvelly AI-ready data center park
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Chandanvelly
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia2e4d0b21c7a9b0aab01362671cdf1ab0f9900f171c2d46babe098b367e4baf3b
Factual source record; not the publisher page
CtrlS signs MoU with Telangana gov't: To invest Rs 10,000 crores into AI DC cluster
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Role: Developersource-terms-not-recordedW.Media0b2591be4141663759a9a797728d81f25058f083d81cfa11f2a1a595d68c303a
Factual source record; not the publisher page
CtrlS to build new AI-ready DC park near Hyderabad
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Power Source: Solar, Role: Developersource-terms-not-recordedW.Media76174019d27239b318cec17671bad4e9c1af33babe257566763d843077436b05
Factual source record; not the publisher page
CtrlS to establish new datacentre park near Hyderabad to enhance company's IT capabilities
Archived copy
APAC News Network
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developersource-terms-not-recordedAPAC News Networka332bcb0656cf2f0fc25191d8eaa8b9a98af8c423e6e0f5a2e2a6956ae666b1f
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). CtrlS Chandanvelly AI-ready data center park [site vcc-site-7a48afbd332e0560f535]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a48afbd332e0560f535/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction