Synapse Data Center (Olds)

Proposed

Canada · 1 project · Last reported

Summary

Synapse Real Estate Corp. proposed a 1 GW AI data centre in the Town of Olds, Alberta, at the northeast corner of Highways 2A and 27, to be the sole user of a 1.4 GW on-site combined-cycle gas plant. The Alberta Utilities Commission rejected a first, deficient plant application in March 2026, and on 17 August 2026 it denied the application in proceeding 30732, finding the site unsuitable for the development. An environmental approval application with Alberta's environment ministry was still listed as in progress, and no development permit had been filed with the town.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 51.79278, -114.10667 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Synapse Data Center (Olds)

Proposed last observed as of · Reported status

Location: Olds (northeast corner of Highways 2A and 27), Alberta, CA. Town coordinates from the Olds Wikipedia page. The developer places the site in the town's industrial area at the northeast corner of Highways 2A and 27 (SW and NW quarters of Section 4-33-1-W5M). Synapse Real Estate Corp. (hosted by the Town of Olds); Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,000 MWPlanned · Campus · Unspecified2026-03-09Data centre size; the sources do not say whether this is IT or total facility load.Synapse Real Estate Corp. (hosted by the Town of Olds); The Logic
Power capacity1,400 MWPlanned · Campus · Onsite generation2026-01-27Proposed natural gas-fired plant using combined-cycle gas turbines on about 10% of the site.Synapse Real Estate Corp. (hosted by the Town of Olds)
Jobs construction2,000 countPlanned · Campus2026-01-27Synapse Real Estate Corp. (hosted by the Town of Olds)
Jobs permanentat least 1,000 countPlanned · Campus2026-01-27Synapse Real Estate Corp. (hosted by the Town of Olds)

Companies and organizations

NameRoleNotesSources
Synapse Real Estate Corp.DeveloperSynapse Real Estate Corp. (hosted by the Town of Olds); Town of Olds; The Logic
Town of OldsGovernmentRegistered as an intervener in the AUC proceeding, commissioned peer reviews of the air quality and noise studies and filed a statement of concern on the environmental application.Town of Olds

Timeline

DateEventActual or plannedNotesSources
2026-01AnnouncedActualSynapse began public engagement in late January 2026 with a project information package for neighbours.Synapse Real Estate Corp. (hosted by the Town of Olds)
2026-03OtherActualReported on 9 March 2026: the AUC rejected the first power plant application, citing inadequate consultation, an environmental report that looked unfinished and signs that not all planned generating equipment was included.The Logic
2026-08-17OtherActualAUC denied the power generation application in proceeding 30732, finding the site unsuitable for the proposed development.Town of Olds

Power supply

TypeDescriptionSources
Natural gas onsiteA proposed 1.4 GW combined-cycle gas plant on site, with the data centre as the sole consumer of its output; the AUC denied the plant application in August 2026.Synapse Real Estate Corp. (hosted by the Town of Olds); Town of Olds

Status stays proposed rather than paused: the August 2026 AUC denial covers the power plant application, and no source reports Synapse halting, withdrawing or appealing the project. It rests on the Town of Olds' undated engagement page, read 2026-10-09, which reports the AUC denial of 17 August 2026 and an Alberta environmental (EPEA) application still in progress. After the first rejection Synapse said it intended to reapply; no response to the August decision was found. The AUC regulates the power plant, not the data centre itself. The developer called it a multi-billion dollar investment without giving a figure.

Sources for these details
Companies
  • Developer: Synapse Real Estate Corp. (unknown scope) evidence
  • Developer: Synapse Real Estate Corp. (unknown scope) evidence
  • Developer: Synapse Real Estate Corp. (unknown scope) evidence
  • Government: Town of Olds (unknown scope) evidence
Source and location review
Status source
Current Data Centre Projects in Olds evidence row
Town of Olds · publication date not stated · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
51.79278, -114.10667
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Town coordinates from the Olds Wikipedia page. The developer places the site in the town's industrial area at the northeast corner of Highways 2A and 27 (SW and NW quarters of Section 4-33-1-W5M).
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
3bb1bb6d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Synapse Data Center (Olds)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Alberta regulator rejects proposal for massive data centre in Olds over deficient application
Archived copy
The Logic
News
Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Developersource-terms-not-recordedThe Logic64a4f72006a0e402ba98c72d169075b35b4da18596be24c1cb089f63a03bbd86
Factual source record; not the publisher page
Current Data Centre Projects in Olds
Archived copy
Town of Olds
Government record
Imported: Record, Imported: Status, Milestone: Other, Power Source: Natural Gas Onsite, Role: Developer, Role: Governmentnot statedsource-terms-not-recordedTown of Oldse83750a4428a6f193ba606c0f53436845549bad975747ff2a973ec42b1cf6fcb
Factual source record; not the publisher page
Olds, Alberta
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia854a6d89cf841bcc105c2a82f09a75fdb79c43fa40008ca69ccd85b0cb35251f
Factual source record; not the publisher page
Synapse Data Center Project Information Package
Archived copy
Synapse Real Estate Corp. (hosted by the Town of Olds)
Company disclosure
Imported: Geometry, Imported: Record, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedSynapse Real Estate Corp. (hosted by the Town of Olds)c385cacde5ba759dfc55e7ed5b997f8a12c2ba5091970db5617e952e13531c08
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Synapse Data Center (Olds) [site vcc-site-7a7046b12f3789bb93a5]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a7046b12f3789bb93a5/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction