atNorth NOR01 Haugaland mega site

Announced

Norway · 1 project · Last reported

Summary

Nordic data center operator atNorth announced in June 2026 its first Norwegian campus, NOR01, on a 36-hectare plot in Haugaland Business Park in Tysvær, western Norway. Initial phases are planned at 120 MW, ramping up to 350 MW, with power availability projected for 2028 once Statnett and regional grid company Fagne complete new substations. atNorth markets the site for high-density AI, machine learning, cloud and HPC workloads, including build-to-suit projects, and expects about 200 people to work there at full capacity. No investment figure or customers have been disclosed.

Source record as of 2026-06-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 59.31540, 5.42520 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

atNorth NOR01 Haugaland mega site

Announced last observed as of · Reported status

Location: Haugaland Business Park, Tysvær Municipality, Rogaland, NO. atNorth names Haugaland Business Park in Tysvær; the business park was geocoded with OpenStreetMap, but the specific plot within it was not identified. atNorth; atNorth

Use: Ai training, Ai inference, Cloud, Hpc, Colocation

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity350 MWPlanned · Campus · Unspecified2026-06-03atNorth; atNorth; RCRTech (RCR Wireless News)
Power capacity120 MWPlanned · Phase · Unspecified · Initial phases2026-06-03atNorth; atNorth; RCRTech (RCR Wireless News)
Land area36 hectaresReported · Campus2026-06-03atNorth; atNorth
Jobs permanentabout 200 countPlanned · Campus2026-06-03People expected on site once the campus reaches full capacity.atNorth

Companies and organizations

NameRoleNotesSources
atNorthDeveloperatNorth; atNorth; RCRTech (RCR Wireless News)
StatnettUtilityTransmission system operator building one of the substations serving the site.atNorth; RCRTech (RCR Wireless News)
FagneUtilityRegional grid company building the other substation.atNorth; RCRTech (RCR Wireless News)

Timeline

DateEventActual or plannedNotesSources
2026-06-03AnnouncedActualatNorth
2028OtherPlannedPower availability for the site is projected for 2028.atNorth; RCRTech (RCR Wireless News)

Power supply

TypeDescriptionSources
GridGrid supply via new substations being built by Statnett and Fagne; atNorth's site page says renewable supply will be backed by certificates of origin from the energy provider.atNorth; atNorth; RCRTech (RCR Wireless News)
Diesel backupStandby generators fuelled with hydrotreated vegetable oil (HVO), with fuel storage for at least 24 hours of operation.atNorth
Sources for these details
Companies
  • Developer: atNorth (unknown scope) evidence
  • Developer: atNorth (unknown scope) evidence
  • Developer: atNorth (unknown scope) evidence
  • Utility: Statnett (unknown scope) evidence
  • Utility: Statnett (unknown scope) evidence
  • Utility: Fagne (unknown scope) evidence
  • Utility: Fagne (unknown scope) evidence
Source and location review
Status source
atNorth expands to Norway with new mega site in Haugaland evidence row
atNorth · published 2026-06-03 · Company disclosure
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 140 days before the data update on 2026-10-27

Location details
Coordinates
59.31540, 5.42520
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
atNorth names Haugaland Business Park in Tysvær; the business park was geocoded with OpenStreetMap, but the specific plot within it was not identified.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
a66d9703

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for atNorth NOR01 Haugaland mega site
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
atNorth expands to Norway with new mega site in Haugaland
Archived copy
atNorth
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedatNorth336783a884128625f97a795cf546cf524bf8ff9b05c85cf4dd9d9d18bfb3be06
Factual source record; not the publisher page
atNorth sees growing AI demand driving 350MW Norway DC campus
Archived copy
RCRTech (RCR Wireless News)
Trade publication
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedRCRTech (RCR Wireless News)fbf91c334f9582e33c577694a920f3db5f61390faf7f340e1d38cf996d2a44d5
Factual source record; not the publisher page
Haugaland mega site (NOR01)
Archived copy
atNorth
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Power Source: Diesel Backup, Power Source: Grid, Role: Developernot statedsource-terms-not-recordedatNorth17513f7efae5654aff78e46deb0f25c5ba43720d1e58e007e0451c2a0b09b0c6
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). atNorth NOR01 Haugaland mega site [site vcc-site-7b9b287883c887b86116]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b9b287883c887b86116/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction