Nordic data center operator atNorth announced in June 2026 its first Norwegian campus, NOR01, on a 36-hectare plot in Haugaland Business Park in Tysvær, western Norway. Initial phases are planned at 120 MW, ramping up to 350 MW, with power availability projected for 2028 once Statnett and regional grid company Fagne complete new substations. atNorth markets the site for high-density AI, machine learning, cloud and HPC workloads, including build-to-suit projects, and expects about 200 people to work there at full capacity. No investment figure or customers have been disclosed.
Source record as of 2026-06-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 59.31540, 5.42520 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Approximate site reference; the exact facility position is unverified.
Projects (1)
atNorth NOR01 Haugaland mega site
Announced last observed as of · Reported status
Location: Haugaland Business Park, Tysvær Municipality, Rogaland, NO. atNorth names Haugaland Business Park in Tysvær; the business park was geocoded with OpenStreetMap, but the specific plot within it was not identified. atNorth; atNorth
Use: Ai training, Ai inference, Cloud, Hpc, Colocation
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 350 MW | Planned · Campus · Unspecified | 2026-06-03 | atNorth; atNorth; RCRTech (RCR Wireless News) | |
| Power capacity | 120 MW | Planned · Phase · Unspecified · Initial phases | 2026-06-03 | atNorth; atNorth; RCRTech (RCR Wireless News) | |
| Land area | 36 hectares | Reported · Campus | 2026-06-03 | atNorth; atNorth | |
| Jobs permanent | about 200 count | Planned · Campus | 2026-06-03 | People expected on site once the campus reaches full capacity. | atNorth |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| atNorth | Developer | atNorth; atNorth; RCRTech (RCR Wireless News) | |
| Statnett | Utility | Transmission system operator building one of the substations serving the site. | atNorth; RCRTech (RCR Wireless News) |
| Fagne | Utility | Regional grid company building the other substation. | atNorth; RCRTech (RCR Wireless News) |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-06-03 | Announced | Actual | atNorth | |
| 2028 | Other | Planned | Power availability for the site is projected for 2028. | atNorth; RCRTech (RCR Wireless News) |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Grid supply via new substations being built by Statnett and Fagne; atNorth's site page says renewable supply will be backed by certificates of origin from the energy provider. | atNorth; atNorth; RCRTech (RCR Wireless News) |
| Diesel backup | Standby generators fuelled with hydrotreated vegetable oil (HVO), with fuel storage for at least 24 hours of operation. | atNorth |
Sources for these details
- atNorth expands to Norway with new mega site in Haugaland — atNorth; 2026-06-03
- Haugaland mega site (NOR01) — atNorth; publication date not stated · Archived source
- atNorth sees growing AI demand driving 350MW Norway DC campus — RCRTech (RCR Wireless News); 2026-06-09
- Companies
Source and location review
- Status source
- atNorth expands to Norway with new mega site in Haugaland evidence row
atNorth · published 2026-06-03 · Company disclosure - Locator
- Approximate site reference · Compiled location reference · approximate_site evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 140 days before the data update on 2026-10-27
Location details
- Coordinates
- 59.31540, 5.42520
- Geometry licence
- source-terms-not-recorded
- Use scope
- Approximate site reference
- Scope class
- approximate_site
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- atNorth names Haugaland Business Park in Tysvær; the business park was geocoded with OpenStreetMap, but the specific plot within it was not identified.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- a66d9703
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| atNorth expands to Norway with new mega site in Haugaland Archived copy | atNorth Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utility | source-terms-not-recorded | atNorth | 336783a884128625f97a795cf546cf524bf8ff9b05c85cf4dd9d9d18bfb3be06Factual source record; not the publisher page | ||
| atNorth sees growing AI demand driving 350MW Norway DC campus Archived copy | RCRTech (RCR Wireless News) Trade publication | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utility | source-terms-not-recorded | RCRTech (RCR Wireless News) | fbf91c334f9582e33c577694a920f3db5f61390faf7f340e1d38cf996d2a44d5Factual source record; not the publisher page | ||
| Haugaland mega site (NOR01) Archived copy | atNorth Company disclosure | Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Power Source: Diesel Backup, Power Source: Grid, Role: Developer | not stated | source-terms-not-recorded | atNorth | 17513f7efae5654aff78e46deb0f25c5ba43720d1e58e007e0451c2a0b09b0c6Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). atNorth NOR01 Haugaland mega site [site vcc-site-7b9b287883c887b86116]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b9b287883c887b86116/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction