EdgeConneX Dublin campus, Newcastle Road (R120), Lucan, Co. Dublin

Announced Operational

Ireland · 2 projects · Last reported

Summary

EdgeConneX Dublin campus — existing DUB01 and DUB02 data centres east of the R120 (operating)

EdgeConneX's Dublin location page, headed 'DUB01 & DUB02 Dublin Data Centers', in its version modified on 27 August 2026 (bounded by Internet Archive copies of 2 August and 3 September 2026), says EdgeConneX holds a land-banked parcel in Dublin that currently houses two purpose-built data centers, that it is operational and power banked for over 170 MW, and that it supports two existing and up to five new data centers in the Grange Castle Business Park; it lists DUB01 at 18 MW N+1 and DUB02 at 7 MW N+1. This supports current operation of the two existing data centres east of the R120 as of 27 August 2026. The page marks a 7 MW DUB03 as planned, while the EPA's December 2025 report counts DUB03 in the existing campus; DUB03's state is not asserted. The licensed EDCDUB04/EDCDUB05 project west of the R120 is unchanged and no new building or capacity is added; the MW figures are N+1 facility ratings, not measured IT load. evidence

EdgeConneX Inc. · published 2026-08-27

EdgeConneX EDCDUB04 and EDCDUB05 data centres with ESSDUB97 energy centre (EPA IE licence P1204-01)

The EPA granted Edgeconnex Ireland Limited industrial emissions licence P1204-01 under seal on 3 September 2026 for the operation of an installation at Newcastle Road, Lucan, County Dublin that 'will include' energy centre ESSDUB97 (20 gas engines of 10.3 MWth) and two data centres, EDCDUB04 and EDCDUB05, with 48 back-up generators. This dated government record identifies the project, supporting announced status as of 3 September 2026. The EPA's Technical Committee states that the installation has planning permission from An Coimisiún Pleanála (South Dublin SD19A/0042 / ABP-305948-19 and SD21A/0042, among others), but those grants date from 2020 to 2023 and whether each remains in effect was not established, so permitted status is not asserted. The licence is not planning consent, and no site works, construction, completion or operation is claimed. evidence

Environmental Protection Agency (Ireland) · published 2026-09-03

Location

The interactive map needs JavaScript. Display anchor: 53.32778, -6.46018 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

EdgeConneX Dublin campus — existing DUB01 and DUB02 data centres east of the R120 (operating)

Operational last observed as of · Authoritative status update

Raw (id_) Internet Archive copy captured 3 September 2026 01:29 UTC. It carries dateModified 2026-08-27T09:35:44Z and the same statements as the live page: the Dublin parcel currently houses two purpose-built data centers, is operational and power banked for over 170 MW, with DUB01 18 MW N+1, DUB02 7 MW N+1 and DUB03 7 MW N+1 planned. evidence

EdgeConneX Inc. (archived by the Internet Archive) · publication date not stated

Raw (id_) Internet Archive copy captured 2 August 2026 16:27 UTC. It carries dateModified 2026-03-23T09:53:17Z and the same two-data-centre, 'operational' and DUB01-DUB03 power statements as the 27 August 2026 version. evidence

EdgeConneX Inc. (archived by the Internet Archive) · publication date not stated

The operator's data-center sitemap lists https://www.edgeconnex.com/locations/emea/dublin-ie/ with lastmod 2026-08-27, matching the page's structured dateModified. evidence

EdgeConneX Inc. · publication date not stated

The two-page data sheet, headed 'DBU01 & DBU02' (sic), says the Dublin EdgeConneX campus is a large land-banked parcel that currently houses two purpose-built data centers with potential for future expansion, and lists DUB01 18 MW N+1, DUB02 7 MW N+1, DUB03 7 MW N+1 and a power bank for an additional 100 MW. It gives no address or coordinates. evidence

EdgeConneX Inc. · publication date not stated

The EPA inspector's report on licence application P1204-01 says that the applicant, Edgeconnex Ireland Limited, also operates three data centres located to the east of the licensed installation, that the R120 divides the lands under the applicant's control with the installation west of the R120 and the existing data centre campus east of it, and (footnote 1) that the existing campus, which includes DUB01, DUB02 and DUB03, holds no IE licence because its total thermal input is below 50 MW while each back-up generator is on the Agency's Medium Combustion Plant register. evidence

Environmental Protection Agency (Ireland) · published 2025-12-17

Spatial query (applicant-name fields not requested). East of the R120, in the townlands of Ballymakaily and The Grange off Newcastle Road, SD16A/0214 (2016, single-storey data centre with six standby generators), SD16A/0345 (data hall extension), SD17A/0141 and SD17A/0392 (stand-alone data hall to the immediate east of the R120), SD18A/0298 (two further single-storey data halls) and SD20A/0031 (2020, relocation of a temporary gas generation plant 'within the Edgeconnex campus' to the immediate east of the data centre 'granted and built' under SD17A/0141 and SD17A/0392, with access from the Edgeconnex site and Grange Castle Business Park) lie 421-462 m east of the campus locator; SD19A/0042 and SD21A/0042 (EDCDUB04 and EDCDUB05, west of the R120) lie 30 m from it. evidence

Department of Housing, Planning and Local Government and Irish local authorities (merged planning registers) · publication date not stated

Companies
Source and location review
Status source
EdgeConneX: Dublin, Ireland - DUB01 & DUB02 Dublin Data Centers page (version modified 27 August 2026) evidence row
EdgeConneX Inc. · published 2026-08-27 · Company disclosure
Locator
Campus locator · Compiled location reference · official_regulator_register_installation_site_centre_grid_reference evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 61 days before the data update on 2026-10-27

EdgeConneX EDCDUB04 and EDCDUB05 data centres with ESSDUB97 energy centre (EPA IE licence P1204-01)

Announced last observed as of · Project announcement

The Technical Committee report describes 'the proposed data centre installation, composed of EDCDUB04 and EDCDUB05' as two buildings housing ICT infrastructure with 48 back-up generators, and the proposed energy centre ESSDUB97 with 20 gas engines; it amends the gas-engine operating conditions and records that 'The installation has been granted planning permission by An Coimisiún Pleanála'. evidence

Environmental Protection Agency (Ireland) · published 2026-09-03

The inspector describes a c. 22.1 ha installation site of partly greenfield and brownfield land west of the R120, bounded by the Grand Canal to the north, with the applicant's existing data-centre campus (DUB01, DUB02 and DUB03, not IE-licensed) east of the R120. EDCDUB04 and EDCDUB05 will each have two single-storey data halls and 24 back-up generators of 6.9 MWth; 'When constructed', their generator yards will hold the generators, and 'Upon completion of construction' the installation will operate around the clock. Table 3.1 lists the permissions: SD19A/0042 and ABP-305948-19 (granted 5 October 2020) and SD23A/0151 (2 October 2023) for EDCDUB04 and the GIS substation ESSDUB98 (operational, EirGrid-owned); SD21A/0042 and ABP-312749-22 (appeal withdrawn; granted March 2022) and SD22A/0289 (10 February 2023) for EDCDUB05 and ESSDUB97; ABP-314567-22 (28 November 2023) for substation transmission connections. EDCDUB06 (SD22A/0333, ABP-317802-23) is excluded from the licence. evidence

Environmental Protection Agency (Ireland) · published 2025-12-17

Section 3.2 of the applicant's form gives the Site Centre Point as 'Easting 231915' and 'Northing 302644' in fields labelled 'Irish Grid Reference - 6 digits'; the same two values appear swapped in the register. Read as easting 302644, northing 231915 they fall on the stated site west of Newcastle Road (R120), Lucan. evidence

Edgeconnex Ireland Limited, published by the Environmental Protection Agency (Ireland) · published 2023-09-01

Register records (applicant-name fields not requested): SD19A/0042, phased development of four single-storey data halls with generators, substation and temporary gas plant at Newcastle Road, Lucan (An Bord Pleanala ABP-305948-19 grant 5 October 2020); SD21A/0042, two single-storey data centres and three gas-powered generation plant buildings in the townland of Ballymakaily west of Newcastle Road (R120) on a 22.1 ha site (grant 24 March 2022; appeal ABP-312749-22 withdrawn); SD22A/0105, GIS substation amendments (grant 19 July 2022); SD22A/0289, amendment of the SD21A/0042 gas-plant condition (grant 10 February 2023); SD23A/0151, reduction of SD19A/0042 back-up generators from 32 to 24 (grant 2 October 2023); SD22A/0333, a further data centre (EDCDUB06), refused by South Dublin in 2023 with an appeal decision recorded as Grant Permission on 31 July 2025. The SD19A/0042 and SD21A/0042 points lie 30 m from the EPA site-centre point. evidence

Department of Housing, Planning and Local Government and Irish local authorities (merged planning registers) · publication date not stated

Licence metadata: Edgeconnex Ireland Limited, Newcastle Road, Lucan, County Dublin, K78 P3K1; application 24 August 2023; proposed determination 6 November 2025; licence issued 3 September 2026; status Authorisation Issued; EIA required; NACE 6190. evidence

Environmental Protection Agency (Ireland) · publication date not stated

Companies
  • Operator: Edgeconnex Ireland Limited (intended) evidence
Source and location review
Status source
EPA Industrial Emissions licence P1204-01, Edgeconnex Ireland Limited, Newcastle Road, Lucan, County Dublin (final determination, sealed 3 September 2026) evidence row
Environmental Protection Agency (Ireland) · published 2026-09-03 · Government record
Locator
Campus locator · Compiled location reference · official_regulator_register_installation_site_centre_grid_reference evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 54 days before the data update on 2026-10-27

Location details
Coordinates
53.32778, -6.46018
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_regulator_register_installation_site_centre_grid_reference
Authority
Compiled location reference
Source entity
Campus
Method
epa_register_national_grid_reference_irish_grid_tm75_to_wgs84_axis_order_corrected_pyproj_3_7_1
Derivation
coordinate_transform
Precision scope
Site-centre point of the EPA-licensed P1204-01 installation (EDCDUB04, EDCDUB05 and ESSDUB97) on the c. 22.1 ha site west of Newcastle Road (R120), from the register and application-form grid values 302644 and 231915 read as Irish Grid easting 302644, northing 231915 (both sources print them in swapped fields) and transformed from TM75 to WGS84. It locates the licensed installation part of EdgeConneX's Lucan campus, not either data centre, the energy centre, a footprint, an entrance or the boundary; the existing EdgeConneX buildings DUB01 to DUB03 lie east of the R120.
Horizontal uncertainty
Not reported

The register gives a single site-centre grid reference at 1 m resolution with no stated survey accuracy for a c. 22.1 ha site, and its two values are printed in swapped fields; the offset to either data centre is unknown. The TM75-to-WGS84 operation is rated at 1 m; the alternative operation moves the point 2.1 m. Decimal places are arithmetic precision.

Geometry evidence
55f4ed07

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for EdgeConneX Dublin campus, Newcastle Road (R120), Lucan, Co. Dublin
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
EdgeConneX data-center sitemap (www.edgeconnex.com/data-center-sitemap.xml)
Archived copy
EdgeConneX Inc.
Operator website
Site and project identitynot statedall-rights-reservedEdgeConneX91f19ce4b86c155645dca91551fe3cca876255a1ba8b1225d50f4a1a160e8b1e
Retained source material; see source provenance
EdgeConneX Dublin data sheet, 'Dublin-Data-Sheet-Q3-26-update' (PDF linked from the Dublin location page)
Archived copy
EdgeConneX Inc.
Operator website
Site and project identitynot statedall-rights-reservedEdgeConneX34ad1c72b13ec6a482a60a8d5f605a8bea3ce51fd93751edc4eca7481db03acf
Retained source material; see source provenance
EdgeConneX: Dublin, Ireland - DUB01 & DUB02 Dublin Data Centers page (version modified 27 August 2026)
Archived copy
EdgeConneX Inc.
Company disclosure
Physical status, Operator claimall-rights-reservedEdgeConneX8fb329fc3fb2069deaf03f866916bc631afa0cab8303bc8cef9f65d5b0a11a1c
Retained source material; see source provenance
EPA IE licence application form LA011009 (P1204-01), section 3.2 Site Geographical Location, Newcastle Road, Lucan
Archived copy
Edgeconnex Ireland Limited, published by the Environmental Protection Agency (Ireland)
Regulatory filing
Site and project identityall-rights-reservedEdgeconnex Ireland Limited via EPA LEAP48cba65ea94f6c35848e0a9affd8aa4113e4cbd676bc73cd80732b1d8b486981
Retained source material; see source provenance
EPA Industrial Emissions licence P1204-01, Edgeconnex Ireland Limited, Newcastle Road, Lucan, County Dublin (final determination, sealed 3 September 2026)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Project announcement, Operator claimall-rights-reservedEnvironmental Protection Agency (Ireland), LEAP068748caef8ea4a2ae9f48c0fe7ab5bbb918640aa98b1ebbfc79e8d3f497b912
Retained source material; see source provenance
EPA Inspector's Report on IE licence application P1204-01, Edgeconnex Ireland Limited, Newcastle Road, Lucan (17 December 2025)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Site and project identityall-rights-reservedEnvironmental Protection Agency (Ireland), LEAP26a0cabfd32a7fc028c2ab0c3daedf58dde99c44dfec357c1e9912a1d6c10d8b
Retained source material; see source provenance
EPA LEAP licence record P1204-01 (data.epa.ie LEAP API, Licence/fulllbyid)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Site and project identitynot statedall-rights-reservedEnvironmental Protection Agency (Ireland), LEAPaba235ba4a32ead8442e06b2a6fd2b1b7ae0bbf737a8732efb44aee2c9c70692
Retained source material; see source provenance
EPA Register of IE Licence Application No. P1204-01 (Edgeconnex Ireland Limited, Newcastle Road, Lucan)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Geometryall-rights-reservedEnvironmental Protection Agency (Ireland), LEAP8f641b2957d652d369aa0e38df9895f095edb4cd35e6ef490b0bdf4f7f92ca60
Retained source material; see source provenance
EPA Report of the Technical Committee on objections to the proposed determination, Edgeconnex Ireland Limited, IE licence P1204-01
Archived copy
Environmental Protection Agency (Ireland)
Government record
Site and project identityall-rights-reservedEnvironmental Protection Agency (Ireland), LEAP67bedc499cdc87f709a8f489f887fd98272c87f659326ebe7076b5e624589ee6
Retained source material; see source provenance
Internet Archive copy (2 August 2026) of the EdgeConneX Dublin, Ireland location page (version of 23 March 2026)
Archived copy
EdgeConneX Inc. (archived by the Internet Archive)
Company disclosure
Site and project identitynot statedall-rights-reservedEdgeConneX; Internet Archive6ac507c175198a96ff3829bad215ad4b4cda2c23e7e2291678e09171591aa7d4
Retained source material; see source provenance
Internet Archive copy (3 September 2026) of the EdgeConneX Dublin, Ireland location page
Archived copy
EdgeConneX Inc. (archived by the Internet Archive)
Company disclosure
Site and project identitynot statedall-rights-reservedEdgeConneX; Internet Archive7ce5e38493649740f7734425af2d20b46a358341cb96536de08c2602d3f56d8f
Retained source material; see source provenance
Irish national planning applications register (IrishPlanningApplications feature service): records within 1,200 m of the EdgeConneX P1204-01 site-centre point
Archived copy
Department of Housing, Planning and Local Government and Irish local authorities (merged planning registers)
Government record
Site and project identitynot statedCC-BY-4.0Department of Housing, Planning and Local Government; South Dublin County Council6a1486df9f00a7a7fada285593049678620128ebfef19408e23569b72cbf284d
Retained source material; see source provenance
Irish national planning applications register (IrishPlanningApplications feature service): South Dublin records SD19A/0042, SD21A/0042, SD22A/0105, SD22A/0289, SD22A/0333 and SD23A/0151 (Ballymakaily, Newcastle Road, Lucan)
Archived copy
Department of Housing, Planning and Local Government and Irish local authorities (merged planning registers)
Government record
Site and project identitynot statedCC-BY-4.0Department of Housing, Planning and Local Government; South Dublin County Councilbc84301b45eefbb75c67f1e91e105966b7ab1231a30ad696280fff228a953d66
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). EdgeConneX Dublin campus, Newcastle Road (R120), Lucan, Co. Dublin [site vcc-site-7edfcf8daddee73f2c4a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7edfcf8daddee73f2c4a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction