Bridge Data Centres Chonburi hyperscale campus

Announced

Thailand · 1 project · Last reported

Summary

Bridge Data Centres is developing a hyperscale campus on about 100 rai (16 hectares) in Khlong Tamru subdistrict, Mueang Chonburi District, Chonburi Province, Thailand. Bridge announced the project in April 2025 with about US$1.2 billion of investment over three years and up to 200 MW of power; by October 2025 Bridge and trade press described a first phase of about 200 MW and said the project had Board of Investment promotion. In October 2025 Bridge signed a 10-year industrial water supply deal with Eastwater Stecon Utilities, with supply from May 2026. No construction start or opening has been reported in the sources.

Source record as of 2025-10-21 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 13.36190, 100.97920 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

Bridge Data Centres Chonburi hyperscale campus

Announced last observed as of · Reported status

Location: Khlong Tamru, Mueang Chonburi District, Chonburi, TH. Bridge names Khlong Tamru subdistrict in Chonburi Province and W.Media adds Mueang District, without an address; the point is the district coordinate from the Mueang Chonburi district Wikipedia article, so it marks the district rather than the site. Bridge Data Centres; W.Media; Wikipedia

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 200 MWPlanned · Phase · Unspecified · Phase 12025-10-16Described as the power capacity of phase 1, without saying whether it is IT load.Bridge Data Centres; W.Media
Power capacityup to 200 MWPlanned · Campus · Unspecified2025-04-11The April 2025 Thai-language release gives a maximum power capacity of up to 200 MW for the facilities without naming phases.Bridge Data Centres
Investmentabout 1,200,000,000 USDAnnounced · Campus2025-04-11Investment over three years; the October 2025 sources call it about US$1.2 billion and tie it to the Khlong Tamru campus.Bridge Data Centres; Bridge Data Centres; W.Media
Land areaabout 16 hectaresReported · Campus2025-10-16About 100 rai.Bridge Data Centres; W.Media

Companies and organizations

NameRoleNotesSources
Bridge Data Centres (Thailand) Co., Ltd.DeveloperThai unit of Bain Capital-backed Bridge Data Centres.Bridge Data Centres; Bridge Data Centres; W.Media
Bain CapitalInvestorBacker of the Bridge Data Centres platform.Bridge Data Centres
Thailand Board of InvestmentGovernmentGranted investment promotion approval for the project.Bridge Data Centres; W.Media

Timeline

DateEventActual or plannedNotesSources
2025-04-11AnnouncedActualThai-language Bridge release announcing US$1.2 billion of investment in Chonburi, presented to the provincial governor; the page is dated 11 April 2025 while the release text carries a 15 April dateline.Bridge Data Centres
2025-10-16OtherActualTen-year industrial water purchase agreement signed with Eastwater Stecon Utilities, with supply from May 2026; W.Media reports a cap of 3.3 million cubic metres a year. Bridge is the utility's first data center client.Bridge Data Centres; W.Media

Status is kept at announced because no opened source reports a construction start or opening; the October 2025 sources call the campus upcoming, and water supply was scheduled from May 2026. Bridge's undated Thailand locations page lists facilities QHI01 and QHI02 at 193 MW of IT capacity in four buildings with a 115 kV intake, but it does not give their location, so those figures are not recorded for this campus. Wikipedia is cited only for the district coordinate.

Sources for these details
Companies
  • Developer: Bridge Data Centres (Thailand) Co., Ltd. (unknown scope) evidence
  • Developer: Bridge Data Centres (Thailand) Co., Ltd. (unknown scope) evidence
  • Developer: Bridge Data Centres (Thailand) Co., Ltd. (unknown scope) evidence
  • Investor: Bain Capital (unknown scope) evidence
  • Government: Thailand Board of Investment (unknown scope) evidence
  • Government: Thailand Board of Investment (unknown scope) evidence
Source and location review
Status source
Bridge Data Centres Becomes Eastwater-Stecon Utilities First Data Centre Client evidence row
Bridge Data Centres · published 2025-10-16 · Company disclosure
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 371 days before the data update on 2026-10-27

Location details
Coordinates
13.36190, 100.97920
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Bridge names Khlong Tamru subdistrict in Chonburi Province and W.Media adds Mueang District, without an address; the point is the district coordinate from the Mueang Chonburi district Wikipedia article, so it marks the district rather than the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
cdb912f3

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Bridge Data Centres Chonburi hyperscale campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Bridge Data Centres Becomes Eastwater-Stecon Utilities First Data Centre Client
Archived copy
Bridge Data Centres
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedBridge Data Centrese50e98004f0ddc6dbde2b42a18310f8b7c27b61bad077b82f436abf896d8f9d6
Factual source record; not the publisher page
Bridge Data Centres inks water deal for its data center in Thailand
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedW.Mediae4831d28c8d87e17bb28d6e12a5ffc67b36bc00cd1a2c9db67793e56bee3a3c8
Factual source record; not the publisher page
Bridge Data Centres to invest US$1.2 billion in Chonburi (Thai-language release)
Archived copy
Bridge Data Centres
Company disclosure
Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Investorsource-terms-not-recordedBridge Data Centres6feb0523bbe0ba7b24dcc1ba43387d7c88e19fa6ab80b78951d1f6e32f1e4c12
Factual source record; not the publisher page
Mueang Chonburi district
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia35ca15a173cc493ae9504883033cc4813e4315b3e96f4321fb0bce65b1b69584
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Bridge Data Centres Chonburi hyperscale campus [site vcc-site-8345f1f9d37238aa593f]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8345f1f9d37238aa593f/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction