China Mobile (Ningxia Zhongwei) Data Center B-Zone
Permitted
China · 1 project · Last reported
Summary
On 21 August 2026 the Zhongwei Natural Resources Bureau issued the construction-project planning permit (electronic supervision no. 6405022026GG0061667) to China Mobile's Ningxia branch for the B07 data centre and P07-1 to P07-6 diesel platforms of B-zone Phase 2 (167,359.35 m2 GFA), published on 2 September. No construction start, completion or operation of B07 is established. evidence
Zhongwei Natural Resources Bureau · published 2026-09-02
Location
The interactive map needs JavaScript. Display anchor: 37.63858, 105.32588 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
China Mobile (Ningxia Zhongwei) Data Center B-Zone Phase 2 — B07 Data Centre
Permitted last observed as of · Development consent
Second B-zone substation EIA (project code 2512-640502-07-01-864879). Centre E 105 deg 19 min 2.855 s, N 37 deg 38 min 19.203 s (743 m west of the first). States that the existing B-zone 110 kV substation received EIA approval 卫环函[2025]58号 on 31 July 2025 and was undergoing completion environmental acceptance. Context for the B-zone campus extent only. evidence
Zhongwei Ecology and Environment Bureau · published 2026-04-21
Pre-approval publicity of a local design adjustment to B-zone Phase 2 preceding the 21 August permit for B07. Context only. evidence
Zhongwei Natural Resources Bureau · published 2026-08-11
Georeferenced imagery extract used only to check that the official EIA substation coordinates in the Zhongwei cloud base read as WGS84 without a web-map offset. Qualitative registration check only: with the printed values read directly as WGS84 longitude/latitude, the six cloud-base EIA points (China Unicom No.1 and No.3, China Mobile B-zone No.1 and No.2, Zhonglian Cloud Base 330 kV, CIDC No.1) fall on the expected parcels of the road grid north and south of Fengyun Road in Esri World Imagery and EOX Sentinel-2 cloudless 2025 (the CIDC point on the built CIDC campus, the Unicom points inside the built Unicom block, the Fengyun switching-station point at the road edge); none shows the several-hundred-metre systematic offset a GCJ-02 web-map coordinate would produce. This is not a measured accuracy. evidence
Esri · publication date not stated
Sentinel-2 2025 mosaic extract (105.318-105.345E, 37.628-37.643N) showing the same road grid and campus blocks as the Esri export; used only for the registration check described there. Not a status observation. evidence
EOX IT Services GmbH · publication date not stated
- Companies
- Owner: China Mobile Communications Group Co., Ltd. Ningxia Branch (current) evidence
Source and location review
- Status source
- Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, China Mobile (Ningxia Zhongwei) Data Center B-zone Phase 2 (B07 data centre; P07-1 to P07-6 diesel platforms) evidence row
Zhongwei Natural Resources Bureau · published 2026-09-02 · Government record - Locator
- Campus locator · Official source · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 67 days before the data update on 2026-10-27
Location details
- Coordinates
- 37.63858, 105.32588
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription
- Derivation
- direct_geometry
- Precision scope
- EIA centre point of the B-zone 110 kV substation, which the report places inside China Mobile (Ningxia Zhongwei) Data Center B-zone. Locates the B-zone campus through on-campus support infrastructure; B07 lies on the adjoining Phase 2 land to the west and its footprint, a parcel centroid, entrance or construction extent are not located.
- Horizontal uncertainty
Not reported
No datum or positional accuracy is stated; the WGS84 reading is supported only by the qualitative imagery check. Offset from the substation to the B07 building on the Phase 2 land is unknown. Decimal places are transcription precision, not accuracy.
- Geometry evidence
- f70c61e4
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report form: China Mobile (Ningxia Zhongwei) Data Center B-zone 110 kV substation (published with Zhongwei EEB acceptance notice, July 2025) Archived copy | Zhongwei Ecology and Environment Bureau Government record | Geometry | all-rights-reserved | Zhongwei Ecology and Environment Bureau | 25736d5fae6e69e8eb1bc70384b40571659c31eb5d2d581d8d520737df562ef4Retained source material; see source provenance | ||
| Environmental impact report form: China Mobile (Ningxia Zhongwei) Data Center B-zone No.2 110 kV substation (Zhongwei EEB acceptance notice, 21 April 2026) Archived copy | Zhongwei Ecology and Environment Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Ecology and Environment Bureau | 51aab0b1c0b3ae41a51c54d8e88d20d51807028203693e2234ee2fe341767b20Retained source material; see source provenance | ||
| EOX Sentinel-2 cloudless 2025 mosaic: Zhongwei West Cloud Base data-centre belt (EPSG:4326 WMS extract) Archived copy | EOX IT Services GmbH Other | Site and project identity | not stated | CC-BY-NC-SA-4.0 | Sentinel-2 cloudless - https://s2maps.eu by EOX IT Services GmbH (Contains modified Copernicus Sentinel data 2025) | 0034487b707d4498169c677390e8fdfa5590d51574dd32c234c4894d6d89c1aeRetained source material; see source provenance | |
| Esri World Imagery export: Zhongwei West Cloud Base data-centre belt (EPSG:4326, 105.318-105.345E, 37.628-37.643N) Archived copy | Esri Other | Site and project identity | not stated | Esri World Imagery terms of use; not redistributed | Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery) | 14f2ab2fd2bc0c7c345673141859673ad820ddbcd104cd97511205ea91bcdc2aRetained source material; see source provenance | |
| Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, China Mobile (Ningxia Zhongwei) Data Center B-zone Phase 2 (B07 data centre; P07-1 to P07-6 diesel platforms) Archived copy | Zhongwei Natural Resources Bureau Government record | Development consent, Owner claim | all-rights-reserved | Zhongwei Natural Resources Bureau | 31c3970cfebfc71878be33dc2807cd4159cdb63ac83558a44d56d0d9bcb11325Retained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau pre-approval notice: local adjustment of China Mobile (Ningxia Zhongwei) Data Center B-zone Phase 2 site plan Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | 3cf00537f844da7a8d3fde2849d7f241ebe4ba865c6a2abf8ae568a98922ce6eRetained source material; see source provenance |