On July 24, 2026 NAVER, Brookfield and NVIDIA announced an expansion of Korea's sovereign AI factory infrastructure at NAVER's GAK Sejong hyperscale data center in Sejong. The planned NVIDIA DSX AI factory grows from an initial 55 MW to 200 MW, financed as a USD 10 billion project (Brookfield up to USD 9 billion, NVIDIA USD 1 billion, NAVER the remainder). NAVER targets 55 MW of operations in the first half of 2027 and 200 MW by 2028; these are targets, and no construction start has been reported. evidence
NAVER Corp. · published 2026-07-25
Location
The interactive map needs JavaScript. Display anchor: 36.50782, 127.34072 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
NAVER GAK Sejong AI Factory (NVIDIA DSX, NAVER/Brookfield/NVIDIA)
Announced last observed as of · Project announcement
NAVER story dated July 24, 2026: NAVER signed a USD 9 billion preliminary agreement with Brookfield on July 22 and a USD 1 billion strategic investment agreement with NVIDIA on July 24. Centered on GAK Sejong, NAVER plans to begin AI-factory operations at 55 MW in the first half of 2027, expand to 200 MW by 2028 and scale toward gigawatt level over the long term. Brookfield will raise the funding through an SPV once the definitive agreement is signed. evidence
NAVER Corp. · published 2026-07-24
June 8, 2026 announcement of the NAVER-NVIDIA AI factory: initial 55 MW operations to begin in 2027, with expansion planned to at least four times the scale of GAK Sejong, which NAVER calls Korea's largest hyperscale data center. evidence
NAVER Corp. · published 2026-06-08
NAVER announced on 8 November 2023 that GAK Sejong, its second self-built data center in Sejong Special Self-Governing City, began full operation with an opening ceremony on 6 November 2023. The campus occupies a 294,000 m2 site, is designed for up to 270 MW of supply and up to 600,000 server units across six phases, and only about one sixth of the full scale was open at launch. evidence
NAVER Corp. · published 2023-11-08
Source and location review
- Status source
- NAVER Partners with Brookfield and NVIDIA to Expand Korea's National AI Factory Infrastructure Buildout evidence row
NAVER Corp. · published 2026-07-25 · Company disclosure - Locator
- Campus locator · Compiled location reference · operator_linked_named_campus_feature evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 95 days before the data update on 2026-10-27
Location details
- Coordinates
- 36.50782, 127.34072
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- operator_linked_named_campus_feature
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- direct_google_maps_named_facility_response_coordinates
- Derivation
- direct_geometry
- Precision scope
- Named-feature marker for NAVER's GAK Sejong campus (824 Haengbok-daero, Sejong), used to locate the campus that will host the AI factory. It is not a building footprint, AI-factory hall, parcel boundary or entrance; the feature is categorised as a corporate office and may sit on an administration building within the roughly 294,000 m2 site.
- Horizontal uncertainty
Not reported
The map feature does not publish surveyed horizontal accuracy, and the AI-factory buildings' positions within the campus are not published. The point rounds the named feature tuple (36.5078177, 127.3407162) to five decimal places, a change of under one metre.
- Geometry evidence
- ceef1f91
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Chairman Lee Hae-jin Announces Major Partnership with NVIDIA and Brookfield to Jointly Build an AI Factory Archived copy | NAVER Corp. Company disclosure | Site and project identity, Operator claim | all-rights-reserved | NAVER Corp. | c01a8997fed92b5a025defe71e37635f1960f70065a7830fe2b652b0d3d4a484Retained source material; see source provenance | ||
| Google Maps named NAVER Datacenter GAK Sejong feature Archived copy | Google Maps Map feature | Geometry | not stated | all-rights-reserved | Google Maps | f3fc08a4219435070776ef62d49215f6f16551fa980239072f74f4bca158753dRetained source material; see source provenance | |
| NAVER and NVIDIA Join Forces to Build Gigawatt-Scale AI Factory, Forming AI Infrastructure Alliance Spanning Asia, the Middle East and Europe Archived copy | NAVER Corp. Company disclosure | Site and project identity | all-rights-reserved | NAVER Corp. | 1bee0354061c9e1fc87e13c129448549ae7a95e56d11a4709ba408f89fc1bba3Retained source material; see source provenance | ||
| NAVER Partners with Brookfield and NVIDIA to Expand Korea's National AI Factory Infrastructure Buildout Archived copy | NAVER Corp. Company disclosure | Project announcement | all-rights-reserved | NAVER Corp. | 7133442ec0781b618517e1366e0e29bf9aede653c8e5f5849db2ec256213f69fRetained source material; see source provenance | ||
| NAVER's second IDC 'GAK Sejong' opens (Korean press release) Archived copy | NAVER Corp. Company disclosure | Site and project identity, Owner claim | all-rights-reserved | NAVER Corp. | 2f242360f8bac990efb08dc9d57b7c41bcb223fdf83be57fbc757803bad67747Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). NAVER GAK Sejong Data Center Campus [site vcc-site-8f745cecc590bf000773]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f745cecc590bf000773/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction