Grenergy GR Data Alto Jahuel Campus Sur
Announced
Chile · 1 project · Last reported
Summary
GR Huiña SpA is seeking an environmental relevance ruling for "Data Center Alto Jahuel Campus Sur" in Alto Jahuel, Buin, south of Santiago. On September 29, 2026, it answered SEA's September 21 request for more information. The proposal covers a data-centre building, a step-down substation and a 0.6 km underground 220 kV line. SEA cited up to 48 backup generators of 2.8 MW each. Its layout shows an 8-hectare fenced site with a 2.76-hectare building area. Grenergy named the campus in May as part of its GR Data platform. No SEA ruling had been issued by October 16. evidence
Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Huiña SpA · published 2026-09-29
Location
The interactive map needs JavaScript. Display anchor: -33.70705, -70.69702 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Project locator; building footprints are not mapped.
Projects (1)
Data Center Alto Jahuel Campus Sur — initial data centre
Announced last observed as of · Project announcement
SEA's Metropolitan Regional Directorate acknowledges GR Huiña SpA's 29 May 2026 consultation for "Data Center Alto Jahuel Campus Sur" and requests further information before ruling. The questions cover the emergency generators (up to 48 units of 2.8 MW, a stated maximum installed total of 134.4 MW), the sewage-treatment plant, and the storage of hazardous substances and fuel. evidence
Servicio de Evaluación Ambiental, Dirección Regional Metropolitana · published 2026-09-21
Signed consultation of relevance for the new project "Data Center Alto Jahuel Campus Sur" by GR Huiña SpA, in Alto Jahuel, Buin, outside the urban limit. It covers a data-centre building and supporting electrical, cooling, fire, road and sanitary works, an underground 220 kV line of about 0.6 km and a step-down substation. The form declares a US$20 million investment and four labelled points. evidence
Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Huiña SpA · published 2026-05-29
SEA public case record PERTI-2026-7066 (folio 2026-13-130): proponent GR Huiña SpA, new project, comuna Buin, presented 29-05-2026, state "En análisis". Its documents include the 21 September SEA request for further information and the proponent's 29 September response; no resolution had been issued. evidence
Servicio de Evaluación Ambiental (SEA), Chile · publication date not stated
Grenergy's 27 May 2026 business-plan update presents GR Data, a new digital-infrastructure platform for data centres in Chile supported by its Oasis solar and storage platforms. It announces two cloud campuses near Santiago, Polpaico Campus Norte and Alto Jahuel Campus Sur, together totalling 600 MW IT and located close to the country's main connectivity hubs. Separately, it describes Atacama Data, an AI-training project of 400 MW IT that could scale to 1 GW. evidence
Grenergy Renovables · published 2026-05-27
- Companies
- Owner: Grenergy (intended) evidence
Source and location review
- Status source
- PERTI-2026-7066: proponent response letter no. 1, "Data Center Alto Jahuel Campus Sur" (GR Huiña SpA) evidence row
Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Huiña SpA · published 2026-09-29 · Regulatory filing - Locator
- Project locator · Compiled location reference · centroid_of_proponent_fenced_site_polygon_in_regulatory_filing evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 28 days before the data update on 2026-10-27
Location details
- Coordinates
- -33.70705, -70.69702
- Geometry licence
- all-rights-reserved
- Use scope
- Project locator
- Scope class
- centroid_of_proponent_fenced_site_polygon_in_regulatory_filing
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- geodesic_check_and_planar_centroid_of_proponent_kmz_cerco_perimetral_polygon_verified_inside
- Derivation
- direct_geometry
- Precision scope
- Centroid of the 8.01 ha "Cerco Perimetral" fence polygon in the proponent's KMZ, verified to lie inside it; it is not a surveyed footprint. The four points declared on the form are boundary-type points; principal point 1 lies outside the fence polygon, so it is not used.
- Horizontal uncertainty
- 232 m
- Geometry evidence
- d0c0b69a
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Grenergy increases its investment plan to €3.7 billion by 2028 (GR Data platform) Archived copy | Grenergy Renovables Company disclosure | Site and project identity, Owner claim | all-rights-reserved | Grenergy Renovables | 78a258b805e18677f0c77d62b5445093be348592766ea2791a224c6821e10ad8Retained source material; see source provenance | ||
| PERTI-2026-7066 annex: DC Alto Jahuel Campus Sur.kmz project layout Archived copy | Servicio de Evaluación Ambiental (SEA), Chile — annex filed by GR Huiña SpA Regulatory filing | Geometry | all-rights-reserved | Servicio de Evaluación Ambiental de Chile; GR Huiña SpA | c29b798141c88c60faa01eae993461758fc9d4e140394e4ac0c561e5203c0f79Retained source material; see source provenance | ||
| PERTI-2026-7066: proponent response letter no. 1, "Data Center Alto Jahuel Campus Sur" (GR Huiña SpA) Archived copy | Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Huiña SpA Regulatory filing | Project announcement | all-rights-reserved | Servicio de Evaluación Ambiental de Chile; GR Huiña SpA | 81da300b74e16e4e7b5da5ca8af8a5774e63fcdd880f0e3bc20f28bfdc85cdeaRetained source material; see source provenance | ||
| SEA e-Pertinencia consultation PERTI-2026-7066: "Data Center Alto Jahuel Campus Sur" (GR Huiña SpA) Archived copy | Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Huiña SpA Regulatory filing | Site and project identity | all-rights-reserved | Servicio de Evaluación Ambiental de Chile; GR Huiña SpA | b06f21712ecb6bbcc5cce6c84b1f6ef7b69507acd433a5658ab8e2d792451b55Retained source material; see source provenance | ||
| SEA e-Pertinencia public record PERTI-2026-7066 (Data Center Alto Jahuel Campus Sur) Archived copy | Servicio de Evaluación Ambiental (SEA), Chile Regulatory filing | Site and project identity | not stated | all-rights-reserved | Servicio de Evaluación Ambiental (SEA), Chile | 7102f62a1220e3ce1bda3a4b8af5d86b467bb465a5c9c3c70af0c28a10fb8fddRetained source material; see source provenance | |
| SEA Metropolitan Region letter requesting further information on the "Data Center Alto Jahuel Campus Sur" consultation Archived copy | Servicio de Evaluación Ambiental, Dirección Regional Metropolitana Government record | Site and project identity | all-rights-reserved | Servicio de Evaluación Ambiental, Dirección Regional Metropolitana | bcbb98532ad8d3c64abb7144c8bda203f9c1d13d0ed44fbfc514e820db884534Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). Grenergy GR Data Alto Jahuel Campus Sur [site vcc-site-91900fdcefed41cee4a5]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91900fdcefed41cee4a5/