China Unicom Ningxia Zhongwei Cloud Data Center
Permitted
China · 1 project · Last reported
Summary
On 14 September 2026 the Zhongwei Natural Resources Bureau issued the construction-project planning permit (electronic supervision no. 6405022026GG0065673) to China Unicom's Ningxia branch for the DC9 new build (79,539.98 m2 GFA) in Park No. 2 of its Zhongwei Cloud Data Center, published as in effect on 21 September. No construction start, completion or operation of DC9 is established. evidence
Zhongwei Natural Resources Bureau · published 2026-09-21
Location
The interactive map needs JavaScript. Display anchor: 37.63545, 105.33363 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
China Unicom Ningxia Zhongwei Cloud Data Center — Park No. 2 Data Centre 9 (DC9)
Permitted last observed as of · Development consent
Approval-result announcement (批准结果信息) of the Zhongwei Ecology and Environment Bureau, generated 19 August 2026 and marked effective. It states that on 19 August 2026 the bureau decided on the EIA document of China United Network Communications Co., Ltd. Ningxia Branch for the '2025年中国联通宁夏中卫云数据中心3号变电站新建工程' (2025 China Unicom Ningxia Zhongwei Cloud Data Center No.3 substation new build), and lists the decision 'Letter agreeing to the EIA report form' 卫环函〔2026〕89号 dated 19 August 2026, attached as a PDF. evidence
Zhongwei Ecology and Environment Bureau · published 2026-08-19
Five-page approval letter dated 19 August 2026 and addressed to China United Network Communications Co., Ltd. Ningxia Branch. It records that the No.3 substation project in Zhongwei Industrial Park comprises one new 110 kV substation with 3 x 80 MVA of main transformers, two 110 kV incoming circuits and 48 10 kV outgoing circuits, and 3.1 km of new 110 kV line (0.05 km overhead, 3.05 km buried cable), with a total investment of CNY 101.30 million. Subject to the report form's measures, the bureau agrees that the company may build the project as described (nature, scale, route, location, protection measures). The letter sets construction- and operation-phase conditions, requires re-approval for major changes or if construction starts more than five years after approval, forbids operation before environmental acceptance, and assigns supervision to the bureau's Zhongwei Industrial Park branch. 3 x 80 MVA is transformer rating, not IT load or a grid-connection capacity of the data centre. evidence
Zhongwei Ecology and Environment Bureau · published 2026-08-19
Post-issuance publicity (index 640501011/2026-00736, electronic supervision no. 6405022026GG0067629, marked effective) of the construction-project planning permit issued on 14 September 2026 to China United Network Communications Co., Ltd. Ningxia Branch for the 2025 China Unicom Ningxia Zhongwei Cloud Data Center No.3 substation new build in Zhongwei Industrial Park: bounded east by the project land of China Unicom Cloud Data Co., Ltd. Ningxia Branch, south by Fengyun Road, west by the project land of Ningxia Tejiasen Technology and north by the CGN Yuntian photovoltaic project. Total GFA 3,353.1 m2 (2,356 m2 above ground, 997.1 m2 below). Real-estate units 640502102227GB00384W00000000 and 640502102227GB00371W00000000, the same two units and the same boundaries as the DC9 permit (6405022026GG0065673, issued the same day). evidence
Zhongwei Natural Resources Bureau · published 2026-09-21
Pre-approval publicity page (24 August to 1 September 2026) embedding the plan board for the China Unicom Ningxia branch application to adjust the Park No.2 general plan. evidence
Zhongwei Natural Resources Bureau · published 2026-08-24
Park No.2 lies in Zhongwei Industrial Park, bounded east by China Unicom Cloud Data Co. land, south by Fengyun Road, west by Ningxia Tejiasen Technology land and north by the CGN Yuntian photovoltaic site; 10.33 ha; applicant China United Network Communications Co., Ltd. Ningxia Branch. The adjustment raises the planned No.9 data centre from 70,460.00 to 79,539.98 m2 and the planned No.3 substation from 2,894.51 to 3,353.10 m2; total GFA after adjustment 181,933.83 m2. The built and proposed general plans label China Unicom to the east and Tejiasen to the west. evidence
Zhongwei Natural Resources Bureau · published 2026-08-24
Pre-approval publicity (17-24 September 2026) for the main China Unicom Ningxia Zhongwei Cloud Data Center plot (133,398 m2), bounded east by China Mobile Ningxia land, south by Fengyun Road, west by the Ningxia Zhongwei Data Center Park No.2 land and north by the CGN Yuntian photovoltaic site; adjusts the No.5 data-machine-room building. Context for the campus extent only. evidence
Zhongwei Natural Resources Bureau · published 2026-09-17
Georeferenced imagery extract used only to check that the official EIA substation coordinates in the Zhongwei cloud base read as WGS84 without a web-map offset. Qualitative registration check only: with the printed values read directly as WGS84 longitude/latitude, the six cloud-base EIA points (China Unicom No.1 and No.3, China Mobile B-zone No.1 and No.2, Zhonglian Cloud Base 330 kV, CIDC No.1) fall on the expected parcels of the road grid north and south of Fengyun Road in Esri World Imagery and EOX Sentinel-2 cloudless 2025 (the CIDC point on the built CIDC campus, the Unicom points inside the built Unicom block, the Fengyun switching-station point at the road edge); none shows the several-hundred-metre systematic offset a GCJ-02 web-map coordinate would produce. This is not a measured accuracy. evidence
Esri · publication date not stated
Sentinel-2 2025 mosaic extract (105.318-105.345E, 37.628-37.643N) showing the same road grid and campus blocks as the Esri export; used only for the registration check described there. Not a status observation. evidence
EOX IT Services GmbH · publication date not stated
- Companies
- Owner: China United Network Communications Co., Ltd. Ningxia Branch (current) evidence
Source and location review
- Status source
- Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, 2025 China Unicom Ningxia Zhongwei Cloud Data Center DC9 new build evidence row
Zhongwei Natural Resources Bureau · published 2026-09-21 · Government record - Locator
- Campus locator · Official source · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 43 days before the data update on 2026-10-27
Location details
- Coordinates
- 37.63545, 105.33363
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription
- Derivation
- direct_geometry
- Precision scope
- EIA station-centre point of the planned 110 kV No.3 substation, which the report places inside the China Unicom Zhongwei Cloud Data Center reserved land and the Park No. 2 board lists as part of Park No. 2. Locates the Unicom campus through on-campus support infrastructure; not the DC9 building footprint, a parcel centroid, entrance or construction extent.
- Horizontal uncertainty
Not reported
No datum or positional accuracy is stated; the WGS84 reading is supported only by the qualitative imagery check. Offset from the substation to DC9 is unknown (both lie in the 10.33 ha Park No. 2). Decimal places are transcription precision, not accuracy.
- Geometry evidence
- 66a7c62c
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report form (for approval): 2025 China Unicom Ningxia Zhongwei Cloud Data Center No.3 substation new build (published with Zhongwei EEB acceptance notice of 31 July 2026) Archived copy | Zhongwei Ecology and Environment Bureau Government record | Geometry | all-rights-reserved | Zhongwei Ecology and Environment Bureau | 248716cb5e624c9509ac60c80222afa989b1e645d9641a7dca6dcda5d05950b5Retained source material; see source provenance | ||
| EOX Sentinel-2 cloudless 2025 mosaic: Zhongwei West Cloud Base data-centre belt (EPSG:4326 WMS extract) Archived copy | EOX IT Services GmbH Other | Site and project identity | not stated | CC-BY-NC-SA-4.0 | Sentinel-2 cloudless - https://s2maps.eu by EOX IT Services GmbH (Contains modified Copernicus Sentinel data 2025) | 0034487b707d4498169c677390e8fdfa5590d51574dd32c234c4894d6d89c1aeRetained source material; see source provenance | |
| Esri World Imagery export: Zhongwei West Cloud Base data-centre belt (EPSG:4326, 105.318-105.345E, 37.628-37.643N) Archived copy | Esri Other | Site and project identity | not stated | Esri World Imagery terms of use; not redistributed | Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery) | 14f2ab2fd2bc0c7c345673141859673ad820ddbcd104cd97511205ea91bcdc2aRetained source material; see source provenance | |
| Plan board: Ningxia Zhongwei Data Center Park No.2 local optimisation (China Unicom Ningxia branch) Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | d90cf2a14e329b8fecd136a24ba7c1ed7219f9751a3598df93cf33c56deecf7dRetained source material; see source provenance | ||
| Zhongwei Ecology and Environment Bureau letter 卫环函〔2026〕89号: approval of the EIA report form for the 2025 China Unicom Ningxia Zhongwei Cloud Data Center No.3 substation new build Archived copy | Zhongwei Ecology and Environment Bureau Government record | Grid connection context | all-rights-reserved | Zhongwei Ecology and Environment Bureau | 0ae1558050c8fd140f32817af12054bc059aa62f5f8c64de99c9ff13e4c737dbRetained source material; see source provenance | ||
| Zhongwei Ecology and Environment Bureau: announcement of the EIA approval decision of 19 August 2026 for the 2025 China Unicom Ningxia Zhongwei Cloud Data Center No.3 substation new build (卫环函〔2026〕89号) Archived copy | Zhongwei Ecology and Environment Bureau Government record | Grid connection context | all-rights-reserved | Zhongwei Ecology and Environment Bureau | 74895dff8d7d1333d8a0537072992c3e34ea2b0c815fc7cb69e0294efda9bb1eRetained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, 2025 China Unicom Ningxia Zhongwei Cloud Data Center DC9 new build Archived copy | Zhongwei Natural Resources Bureau Government record | Development consent, Owner claim | all-rights-reserved | Zhongwei Natural Resources Bureau | 67786a8030f2c42d96923becc622dec7d6df7f63d1a0af3aeb3c6bdd195abe18Retained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, 2025 China Unicom Ningxia Zhongwei Cloud Data Center No.3 substation new build Archived copy | Zhongwei Natural Resources Bureau Government record | Grid connection context | all-rights-reserved | Zhongwei Natural Resources Bureau | 4f3a9b206d8aea50fa39a0d31c590e29d30924d3b6bb749141b517cb18f07171Retained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau pre-approval notice: local optimisation of the China Unicom Ningxia Zhongwei Cloud Data Center site plan Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | 1a1a41f3452035d4c812fa58a5b1b038e938c9ba78a1cafcb34279ad875f5ec2Retained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau pre-approval notice: local optimisation of the Ningxia Zhongwei Data Center Park No.2 site plan Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | 0fb87b1c11f61db298cdc1cdcda4a2da55bc1c2b548fcc0d8f426c006dee9fc5Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). China Unicom Ningxia Zhongwei Cloud Data Center [site vcc-site-91bd7dbaaff4a357e678]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91bd7dbaaff4a357e678/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction