CloudHQ QRO Campus (Querétaro)
Announced
Mexico · 1 project · Last reported
Summary
CloudHQ, a US data centre developer, plans a six-building hyperscale campus on about 52 hectares next to Querétaro's international airport in central Mexico. Presented at the Mexican president's morning press conference in September 2025, it carries USD 4.8 billion of planned investment and up to 900 MW of critical IT load, with initial power secured for a first 200 MW. CloudHQ's own campus page lists a smaller 360 MW and readiness within 2027. Reports disagree on whether a tenant lease is signed and whether building work has begun, and no 2026 progress report was found.
Source record as of 2025-09-30 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 20.61983, -100.14740 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Approximate site reference; the exact facility position is unverified.
Projects (1)
CloudHQ QRO Campus (Querétaro)
Announced last observed as of · Reported status
Location: Querétaro (beside Querétaro Intercontinental Airport), Querétaro, MX. Coordinates are the point published on CloudHQ's campus page. News reports place the 52-hectare site on the west side of the airport; the published point was not checked against a parcel boundary. CloudHQ; Xataka México; Por Esto
Use: Cloud, Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | up to 900 MW | Planned · Campus · It load | 2025-09-25 | Described as critical IT load at full build-out across six buildings. | Xataka México; Telecom Review Americas; Por Esto |
| Power capacity | 360 MW | Planned · Campus · It load | 2026-10-09 | Total critical IT load on CloudHQ's undated campus page (read 2026-10-09; its footer shows 2023). The same page lists six buildings of 48 MW each, which totals 288 MW. | CloudHQ |
| Power capacity | 200 MW | Planned · Phase · Unspecified · First phase | 2025-09-26 | Reported as the initial power allocation CloudHQ has secured. | Xataka México; Por Esto |
| Investment | 4,800,000,000 USD | Announced · Campus | 2025-09-25 | Xataka México; Telecom Review Americas; heise online; Por Esto | |
| Land area | 52 hectares | Reported · Campus | 2025-09-25 | Xataka México; Telecom Review Americas; Por Esto | |
| Buildings | 6 count | Planned · Campus | 2025-09-26 | CloudHQ; Xataka México; Telecom Review Americas | |
| Jobs construction | about 7,200 count | Planned · Campus | 2025-09-26 | Xataka México; Telecom Review Americas; heise online | |
| Jobs permanent | about 900 count | Planned · Campus | 2025-09-26 | Por Esto instead reported about 600 direct operating jobs, while quoting a post that cited 900. | Xataka México; Telecom Review Americas; heise online |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| CloudHQ | Developer | CloudHQ; Xataka México; Telecom Review Americas; heise online | |
| Government of the State of Querétaro | Government | Reported as supporting CloudHQ with land acquisition and permits; CloudHQ has worked with the state since 2021. | Xataka México; Por Esto |
| Comisión Federal de Electricidad (CFE) | Utility | CloudHQ says it worked with CFE and the grid operator CENACE to secure the initial power supply. | Xataka México; Por Esto |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-09-25 | Announced | Actual | Presented at the president's morning press conference by Economy Secretary Marcelo Ebrard and CloudHQ executives. | Xataka México; Por Esto |
| 2027 | First operational | Planned | CloudHQ targets readiness for service within 2027; heise reported operation planned for the first half of 2027. | CloudHQ; Telecom Review Americas; heise online |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | CloudHQ's page describes an on-site substation fed by 400 kV transmission; the company says it worked with CFE and CENACE on the initial supply and plans a larger switching substation of about 2 GW. | CloudHQ; Xataka México; Por Esto |
Status rests on September 2025 announcement coverage; no 2026 construction or tenant update was found. Por Esto reported a lease already signed with an unnamed global technology tenant and works under way, Xataka reported that CloudHQ had invested USD 250 million so far and was still pursuing a long-term lease, while heise described construction as planned and Telecom Review Americas said CloudHQ was still finalising permits, site preparation and tenant contracts. CloudHQ's undated campus page lists 360 MW and six 48 MW buildings, figures that neither add up nor match the 900 MW announced in 2025.
Sources for these details
- QRO Campus — CloudHQ; publication date not stated · Archived source
- Inversión millonaria en Querétaro: CloudHQ construirá 6 centros de datos de hiperescala para potenciar la Inteligencia Artificial — Xataka México; 2025-09-26
- CloudHQ to Build Mexico's Largest Hyperscale Data Hub in Querétaro — Telecom Review Americas; 2025-09-30
- New data centres: CloudHQ invests USD 4.8 billion in Mexico — heise online; 2025-09-29
- CloudHQ invertirá 4,800 mdd en 6 centros de datos en Querétaro: 900 MW para IA dentro del Plan México — Por Esto; 2025-09-25 · Archived source
- Companies
- Developer: CloudHQ (unknown scope) evidence
- Developer: CloudHQ (unknown scope) evidence
- Developer: CloudHQ (unknown scope) evidence
- Developer: CloudHQ (unknown scope) evidence
- Government: Government of the State of Querétaro (unknown scope) evidence
- Government: Government of the State of Querétaro (unknown scope) evidence
- Utility: Comisión Federal de Electricidad (CFE) (unknown scope) evidence
- Utility: Comisión Federal de Electricidad (CFE) (unknown scope) evidence
Source and location review
- Status source
- CloudHQ to Build Mexico's Largest Hyperscale Data Hub in Querétaro evidence row
Telecom Review Americas · published 2025-09-30 · Trade publication - Locator
- Approximate site reference · Compiled location reference · approximate_site evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 392 days before the data update on 2026-10-27
Location details
- Coordinates
- 20.61983, -100.14740
- Geometry licence
- source-terms-not-recorded
- Use scope
- Approximate site reference
- Scope class
- approximate_site
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Coordinates are the point published on CloudHQ's campus page. News reports place the 52-hectare site on the west side of the airport; the published point was not checked against a parcel boundary.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- eb3a316f
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| CloudHQ invertirá 4,800 mdd en 6 centros de datos en Querétaro: 900 MW para IA dentro del Plan México Archived copy | Por Esto News | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Government, Role: Utility | source-terms-not-recorded | Por Esto | f54077f293349d4019945622b493bcf0f2d956bf940e7a3b5db42b9d1bf3eef5Factual source record; not the publisher page | ||
| CloudHQ to Build Mexico's Largest Hyperscale Data Hub in Querétaro Archived copy | Telecom Review Americas Trade publication | Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Role: Developer | source-terms-not-recorded | Telecom Review Americas | e61f9f53932f8cb683ec013ff8fff0a67d6b53ac57e489f429db681fde2f1c7bFactual source record; not the publisher page | ||
| Inversión millonaria en Querétaro: CloudHQ construirá 6 centros de datos de hiperescala para potenciar la Inteligencia Artificial Archived copy | Xataka México News | Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Government, Role: Utility | source-terms-not-recorded | Xataka México | b3a989c548cda88e8c190758cfd334461ff624aa9e70a9eff6fc572a89be1296Factual source record; not the publisher page | ||
| New data centres: CloudHQ invests USD 4.8 billion in Mexico Archived copy | heise online News | Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: First Operational, Role: Developer | source-terms-not-recorded | heise online | 6ba763960174235cd32a44599b773f910f73759fc6e01a90c22d90ad39d59f33Factual source record; not the publisher page | ||
| QRO Campus Archived copy | CloudHQ Company disclosure | Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Developer | not stated | source-terms-not-recorded | CloudHQ | 6181392e0fcdff86f23c6228c3c960f6a519d833a61acb3e4ce61dc0cdbd9491Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). CloudHQ QRO Campus (Querétaro) [site vcc-site-9209936dfd95900f78c3]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9209936dfd95900f78c3/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction