Scala AI City (Eldorado do Sul)
Announced
Brazil · 1 project · Last reported
Summary
Scala Data Centers plans a data centre city in Eldorado do Sul, in the Porto Alegre metropolitan region of Rio Grande do Sul, Brazil. It signed an agreement with the state government in September 2024 for a first phase of 54 MW of IT capacity, about BRL 3 billion, with potential growth to 4,750 MW and total investment the company puts as high as BRL 500 billion. Eldorado do Sul passed a law in December 2024 adding the site to the urban perimeter, and in May 2025 Brazil's Ministry of Mines and Energy authorized a phased grid connection of up to 5 GW. No construction start had been reported in the sources reviewed.
Source record as of 2025-05-14 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: -30.08390, -51.61580 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Scala AI City (Eldorado do Sul)
Announced last observed as of · Reported status
Location: Eldorado do Sul, Rio Grande do Sul, BR. Municipal reference point for Eldorado do Sul (Wikipedia infobox); the releases name the municipality but not the parcel. Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 54 MW | Planned · Phase · It load · Phase 1 | 2025-05-14 | Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire | |
| Power capacity | up to 4,750 MW | Planned · Campus · Unspecified | 2025-05-14 | Described as potential capacity at full build-out; the releases do not say whether it is IT load. | Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire |
| Power capacity | up to 5,000 MW | Permitted · Campus · Grid connection | 2025-05-14 | Ramp-up connection to the national interconnected system authorized by the Ministry of Mines and Energy. | Scala Data Centers via PR Newswire |
| Investment | about 3,000,000,000 BRL | Announced · Phase · Phase 1 | 2024-12-18 | The September 2024 release gave the same phase as USD 500 million. | Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire |
| Investment | up to 500,000,000,000 BRL | Announced · Campus | 2025-05-14 | Potential total at full build-out. The releases also cite USD figures that differ (USD 90 billion in September 2024, USD 80 billion in December 2024). | Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire |
| Land area | more than 1,730 acres | Planned · Campus | 2024-09-11 | Later releases give the site as more than 7 million square metres (December 2024) and 10 million square metres (May 2025), so stated areas vary. | Scala Data Centers via PR Newswire |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Scala Data Centers | Developer | Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire | |
| Government of Rio Grande do Sul | Government | Signed a letter of intent with Scala through its economic development department. | Scala Data Centers via PR Newswire |
| Municipality of Eldorado do Sul | Government | Enacted Municipal Law 5.949/2024 expanding the urban perimeter to include the site. | Scala Data Centers via PR Newswire |
| Brazil Ministry of Mines and Energy | Government | Authorized a phased connection of up to 5 GW to the national grid. | Scala Data Centers via PR Newswire |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2024-09-11 | Announced | Actual | Letter of intent signed with the Rio Grande do Sul government. | Scala Data Centers via PR Newswire |
| 2024-12-18 | Zoning approved | Actual | Mayor signed Municipal Law 5.949/2024 bringing the site into the urban perimeter; date is the release date. | Scala Data Centers via PR Newswire |
| 2025-05-14 | Permit approved | Actual | Federal authorization for a phased grid connection of up to 5 GW; date is the release date. | Scala Data Centers via PR Newswire |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Connection to Brazil's national interconnected system; Scala says the campus will use 100% renewable, certified energy. | Scala Data Centers via PR Newswire; Scala Data Centers via PR Newswire |
Sources for these details
- With an initial investment of USD 500 million, Scala Data Centers and Rio Grande do Sul government sign agreement for largest digital infrastructure project in the state of southern Brazil — Scala Data Centers via PR Newswire; 2024-09-11
- Mayor of Eldorado do Sul, Brazil, Approves Law Enabling the Construction of Latin America's First Data Center City — Scala Data Centers via PR Newswire; 2024-12-18
- Scala AI City: Brazil's Ministry of Mines and Energy approves 5 GW power connection for data center city in Rio Grande do Sul — Scala Data Centers via PR Newswire; 2025-05-14
- Companies
- Developer: Scala Data Centers (unknown scope) evidence
- Developer: Scala Data Centers (unknown scope) evidence
- Developer: Scala Data Centers (unknown scope) evidence
- Government: Government of Rio Grande do Sul (unknown scope) evidence
- Government: Municipality of Eldorado do Sul (unknown scope) evidence
- Government: Brazil Ministry of Mines and Energy (unknown scope) evidence
Source and location review
- Status source
- Scala AI City: Brazil's Ministry of Mines and Energy approves 5 GW power connection for data center city in Rio Grande do Sul evidence row
Scala Data Centers via PR Newswire · published 2025-05-14 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 531 days before the data update on 2026-10-27
Location details
- Coordinates
- -30.08390, -51.61580
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Municipal reference point for Eldorado do Sul (Wikipedia infobox); the releases name the municipality but not the parcel.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- bb426ea9
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Mayor of Eldorado do Sul, Brazil, Approves Law Enabling the Construction of Latin America's First Data Center City Archived copy | Scala Data Centers via PR Newswire Company disclosure | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Zoning Approved, Role: Developer, Role: Government | source-terms-not-recorded | Scala Data Centers via PR Newswire | 75d5df460537cb61ee96fe3765dc7d8375d0a280c8fb177e07235db01813c8dcFactual source record; not the publisher page | ||
| Scala AI City: Brazil's Ministry of Mines and Energy approves 5 GW power connection for data center city in Rio Grande do Sul Archived copy | Scala Data Centers via PR Newswire Company disclosure | Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: Permit Approved, Power Source: Grid, Role: Developer, Role: Government | source-terms-not-recorded | Scala Data Centers via PR Newswire | 48151faad19cc638fab872a40d7c295118177a76f190e36725149a58c0b1953cFactual source record; not the publisher page | ||
| With an initial investment of USD 500 million, Scala Data Centers and Rio Grande do Sul government sign agreement for largest digital infrastructure project in the state of southern Brazil Archived copy | Scala Data Centers via PR Newswire Company disclosure | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Government | source-terms-not-recorded | Scala Data Centers via PR Newswire | d1484079e62e9246ddaf83f4a2d4d0b91d056dfad912af2a36dc47fecd2876f8Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Scala AI City (Eldorado do Sul) [site vcc-site-a1239f397b785f28fd31]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a1239f397b785f28fd31/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction