Red Admiral data centre campus, Rochfortbridge

Proposed

Ireland · 1 project · Last reported

Summary

Proposed six-unit data centre campus with a decentralised energy resource and a solar farm on a 600-acre site near Rochfortbridge, County Westmeath, Ireland. The applicant is Red Admiral DC Ltd, and the Westmeath Examiner says the development is part of the Lumcloon Energy Group's wider plans; it reports the project at EUR 1 billion. Westmeath County Council granted a ten-year permission with 32 conditions in early June 2026 despite more than 50 submissions. Third-party appeals were lodged with An Coimisiún Pleanála, with a decision due by 27 October 2026. The energy element needs an EPA industrial emissions licence.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 53.41600, -7.29600 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Red Admiral data centre campus, Rochfortbridge

Proposed last observed as of · Reported status

Location: Rochfortbridge, County Westmeath, IE. Rochfortbridge village centroid from its Wikipedia article. The application covers several townlands around Rochfortbridge (Gneevebane, Oldtown, Farthingstown, Castlelost and Kiltotan, and Collinstown), but no cited source gives site coordinates. An Coimisiún Pleanála; Westmeath Examiner; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment1,000,000,000 EURReported · Campus2026-07-03Reported as the value of the Rochfortbridge data centre development.Westmeath Examiner
Land area600 acresReported · Campus2026-07-03Site including the solar farm, across several townlands.Westmeath Examiner
Buildings6 countPlanned · Campus2026-07-03Six data centre units with data halls about 72 feet high.Westmeath Examiner
Jobs permanentabout 760 countPlanned · Campus2026-07-03Direct permanent jobs; about 1,000 indirect jobs were also cited for the five-year construction phase.Westmeath Examiner

Companies and organizations

NameRoleNotesSources
Red Admiral DC LimitedDeveloperPlanning applicant.An Coimisiún Pleanála; Westmeath Examiner
Lumcloon Energy GroupDeveloperThe Westmeath Examiner says the development forms part of the group's wider plans; the corporate link to Red Admiral DC Limited is not stated.Westmeath Examiner
Westmeath County CouncilGovernmentPlanning authority that granted permission in June 2026.An Coimisiún Pleanála; Westmeath Examiner
An Coimisiún PleanálaGovernmentDeciding third-party appeals against the permission.An Coimisiún Pleanála; Westmeath Examiner

Timeline

DateEventActual or plannedNotesSources
2026-06Permit approvedActualWestmeath County Council granted ten-year permission subject to 32 conditions (council reference 2560344).Westmeath Examiner; An Coimisiún Pleanála
2026-06-23OtherActualThird-party appeals lodged with An Coimisiún Pleanála (case PL25M.501596); the case page gives 23 June 2026 as the lodged date. The Westmeath Examiner reports that one appeal was ruled invalid over its fee on 17 June.An Coimisiún Pleanála; Westmeath Examiner
2026-10-27OtherPlannedDate by which An Coimisiún Pleanála is due to decide the appeals.An Coimisiún Pleanála; Westmeath Examiner

Power supply

TypeDescriptionSources
OtherThe application includes a decentralised energy resource whose operation requires an EPA industrial emissions licence; its fuel is not stated in the sources opened.An Coimisiún Pleanála; Westmeath Examiner
SolarA solar farm is part of the development.Westmeath Examiner

Status date is the access date: the appeal board's undated case page still showed the appeal as lodged and undecided on 2026-10-09. No MW figure was found in the sources opened. Objectors argued the campus would burden the national grid, questioned its climate impact and visual effect, and said no emissions statement was provided. Separately, Lumcloon plans to seek changes to an approved energy storage facility to add a reserve gas-fired generator; the Westmeath Examiner does not say whether that facility is part of this campus.

Sources for these details
Companies
  • Developer: Red Admiral DC Limited (unknown scope) evidence
  • Developer: Red Admiral DC Limited (unknown scope) evidence
  • Developer: Lumcloon Energy Group (unknown scope) evidence
  • Government: Westmeath County Council (unknown scope) evidence
  • Government: Westmeath County Council (unknown scope) evidence
  • Government: An Coimisiún Pleanála (unknown scope) evidence
  • Government: An Coimisiún Pleanála (unknown scope) evidence
Source and location review
Status source
Case reference PL25M.501596 evidence row
An Coimisiún Pleanála · publication date not stated · Regulatory filing
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
53.41600, -7.29600
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Rochfortbridge village centroid from its Wikipedia article. The application covers several townlands around Rochfortbridge (Gneevebane, Oldtown, Farthingstown, Castlelost and Kiltotan, and Collinstown), but no cited source gives site coordinates.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
8d2bc043

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Red Admiral data centre campus, Rochfortbridge
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Case reference PL25M.501596
Archived copy
An Coimisiún Pleanála
Regulatory filing
Imported: Geometry, Imported: Record, Imported: Status, Milestone: Other, Milestone: Permit Approved, Power Source: Other, Role: Developer, Role: Governmentnot statedsource-terms-not-recordedAn Coimisiún Pleanála9a16423669f156675da9bfc57c8a6d2f0932ee59c66e69a972f666c4f25f7ddd
Factual source record; not the publisher page
Data centre appeals to An Coimisiún Pleanála
Archived copy
Westmeath Examiner
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Milestone: Other, Milestone: Permit Approved, Power Source: Other, Power Source: Solar, Role: Developer, Role: Governmentsource-terms-not-recordedWestmeath Examiner250f774d62ba0ab55fa6163b9776ce979afe3f46460b9ea97c46b528ab4573f3
Factual source record; not the publisher page
Rochfortbridge
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia11a9e89e0de982c1e30f0267b93671ce244063d3e72519d7328343800a0d8673
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Red Admiral data centre campus, Rochfortbridge [site vcc-site-a2932dfc186e6f2538c8]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a2932dfc186e6f2538c8/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction