Cavour Hyperscale Campus (Trino)

Announced

Italy · 1 project · Last reported

Summary

Proposed data processing and AI campus on the site of the former Galileo Ferraris power station at Trino in the province of Vercelli, Piedmont, associated with the Italian engineering and construction group TechBau. On 24 July 2026 Italy's Council of Ministers declared it a programme of preeminent national strategic interest, citing about EUR 4 billion of investment and 300 to 400 MW of power. The site would reuse an existing 380 kV substation and an operating 87.5 MW solar plant, with 100 to 120 MW of battery storage. The timetable calls for the permitting conference to open by the end of 2026, a single authorisation in 2027 and a first lot in service in 2028.

Source record as of 2026-07-27 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 45.25206, 8.19393 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Cavour Hyperscale Campus (Trino)

Announced last observed as of · Reported status

Location: Trino, Vercelli, Piemonte, IT. Coordinates of the former Galileo Ferraris thermoelectric plant (frazione Leri Cavour, Trino) from its Italian Wikipedia article; the campus boundary has not been published. Regione Piemonte (Piemonteinforma); Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentabout 4,000,000,000 EURAnnounced · Campus2026-07-24Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni); ItaliaOggi
Power capacity300–400 MWPlanned · Campus · Unspecified2026-07-24CorCom (Corriere Comunicazioni); Punto Informatico; ItaliaOggi
Jobs constructionabout 1,200 countPlanned · Campus2026-07-24Average construction workforce, with peaks above 2,000.Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni); ItaliaOggi
Jobs permanent300–350 countPlanned · Campus2026-07-24Highly qualified operating jobs; sources add about 1,000 indirect jobs, and ItaliaOggi speaks of more than 2,000 jobs at full operation.Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni); ItaliaOggi

Companies and organizations

NameRoleNotesSources
TechBauDeveloperItaliaOggi names TechBau as the group behind the project; the regional government says it worked with TechBau on the investment.Regione Piemonte (Piemonteinforma); ItaliaOggi
Government of Italy (Council of Ministers)GovernmentDeclared the programme of preeminent national strategic interest on a proposal from the industry minister, allowing an extraordinary commissioner to coordinate the single authorisation.Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni)
Regione PiemonteGovernmentRegione Piemonte (Piemonteinforma)

Timeline

DateEventActual or plannedNotesSources
2026-07-24OtherActualCouncil of Ministers declared the programme of preeminent national strategic interest under article 13 of the Decreto Asset.Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni)
2026OtherPlannedServices conference for permitting to begin by the end of 2026.Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni)
2027Permit approvedPlannedTarget for the single authorisation (autorizzazione unica).Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni); ItaliaOggi
2028First operationalPlannedFirst lot to enter service.Regione Piemonte (Piemonteinforma); CorCom (Corriere Comunicazioni); ItaliaOggi

Power supply

TypeDescriptionSources
GridUse of an existing 380 kV substation at the former power station site.Punto Informatico
SolarAn 87.5 MW photovoltaic plant already in operation would be used.Punto Informatico
Battery storageElectrochemical storage of 100 to 120 MW and 200 to 240 MWh.Punto Informatico

The Council of Ministers decision covered two programmes totalling about EUR 8 billion; the other is an Equinix programme in Lombardy and is not part of this record. No Council of Ministers or ministry release was opened, and no later report on the permitting conference or the appointment of a commissioner was found. ItaliaOggi attributes the EUR 4 billion figure to La Stampa. The regional release describes the campus as a hub for data processing and artificial intelligence; none of the opened sources states cloud workloads. The Italian Wikipedia article on the former plant is used for coordinates only.

Sources for these details
Companies
  • Developer: TechBau (unknown scope) evidence
  • Developer: TechBau (unknown scope) evidence
  • Government: Government of Italy (Council of Ministers) (unknown scope) evidence
  • Government: Government of Italy (Council of Ministers) (unknown scope) evidence
  • Government: Regione Piemonte (unknown scope) evidence
Source and location review
Status source
Un data center nell'ex centrale di Trino evidence row
Regione Piemonte (Piemonteinforma) · published 2026-07-24 · Government record
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 92 days before the data update on 2026-10-27

Location details
Coordinates
45.25206, 8.19393
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates of the former Galileo Ferraris thermoelectric plant (frazione Leri Cavour, Trino) from its Italian Wikipedia article; the campus boundary has not been published.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
b6f06cee

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Cavour Hyperscale Campus (Trino)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Centrale termoelettrica "Galileo Ferraris"
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia6ec522dc14b8e8972af6ed0e13104642eafb6b0684ffcd3c360200484d6336bc
Factual source record; not the publisher page
Data center in Lombardia e Piemonte: via libera dal Cdm
Archived copy
Punto Informatico
Trade publication
Imported: Record, Metric: Power Capacity, Power Source: Battery Storage, Power Source: Grid, Power Source: Solarsource-terms-not-recordedPunto Informaticoc4f5b314ca1f5cd2b8b58f121bfe9684c8bb90d8f6c2a658943b79324dde0ca4
Factual source record; not the publisher page
Data center, dal Cdm ok a investimenti per 8 miliardi. Urso: "Italia hub europeo del digitale"
Archived copy
CorCom (Corriere Comunicazioni)
Trade publication
Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Milestone: Permit Approved, Role: Governmentsource-terms-not-recordedCorCom (Corriere Comunicazioni)7274554f32f51e5641a687bb3c8af5a258ea569bb33ee5326fef1b361c82e86e
Factual source record; not the publisher page
Piemonte, 4 miliardi per il nuovo Cavour Hyperscale Campus
Archived copy
ItaliaOggi
News
Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: First Operational, Milestone: Permit Approved, Role: Developersource-terms-not-recordedItaliaOggi50d5305821489e2724281ddf50b8bc97036e536804070a08a950a067560f9e02
Factual source record; not the publisher page
Un data center nell'ex centrale di Trino
Archived copy
Regione Piemonte (Piemonteinforma)
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: First Operational, Milestone: Other, Milestone: Permit Approved, Role: Developer, Role: Governmentsource-terms-not-recordedRegione Piemonte (Piemonteinforma)a53c8d6d5e0b8bc2be77880795551d4913b25e30a7b75ec5674d84be60a4b876
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Cavour Hyperscale Campus (Trino) [site vcc-site-a4bfb4274cc4e48492b6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a4bfb4274cc4e48492b6/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction