DataVolt Oxagon AI data centre campus (NEOM)
Under construction
Saudi Arabia · 1 project · Last reported
Summary
Saudi developer DataVolt plans a 1.5 GW AI data centre campus at Oxagon, NEOM's industrial city on the Red Sea coast, on land leased from Oxagon. Under the February 2025 agreement DataVolt committed an initial USD 5 billion to the first phase, which is meant to run on renewable power. In August 2026 DataVolt and HUMAIN broke ground on a jointly developed 100 MW block within a 360 MW first phase, with the first 100 MW expected in service in 2028. Semafor reported in September 2026 that the initial facility would cost about USD 1 billion, and DataVolt's chief executive said the compute would be sold to customers abroad.
Source record as of 2026-09-07 · Details and sources
DataVolt's 21 October 2026 release on the HUMAIN-DataVolt-Nebius framework for the Oxagon AI campus describes the initial 100 MW, part of the first phase's planned 360 MW, as currently under construction. The status stays under construction with a newer observation date. Nebius's up-to-50 MW offtake is a preliminary framework, and operation from Q4 2027 is a forecast; no completion or operation of any part of the campus is established, and the planned 1.5 GW total is not under construction. evidence
DataVolt · published 2026-10-21
Location
The interactive map needs JavaScript. Display anchor: 27.56790, 35.54600 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
DataVolt Oxagon AI data centre campus (NEOM)
Under construction last observed as of · Authoritative status update
This record reports under construction as of 2026-09-07. NEOM; DataVolt; Semafor
Location: Oxagon, NEOM, Tabuk Province, SA. Sources name Oxagon in NEOM but not a parcel. Coordinates are the OpenStreetMap Nominatim result for Oxagon (a construction land-use area in Duba governorate, Tabuk region). NEOM; NEOM; DataVolt
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,500 MW | Planned · Campus · Unspecified | 2026-08-31 | NEOM; NEOM; DataVolt; Semafor | |
| Power capacity | 360 MW | Planned · Phase · Unspecified · First phase | 2026-08-31 | NEOM; DataVolt; Hogan Lovells Cadwalader | |
| Power capacity | 100 MW | Under construction · Phase · Unspecified · Initial HUMAIN-DataVolt block | 2026-09-07 | NEOM; DataVolt; Semafor | |
| Investment | 5,000,000,000 USD | Announced · Phase · First phase | 2025-02-10 | Initial DataVolt investment announced to fund the first phase, before the first phase was sized at 360 MW. | NEOM |
| Investment | about 1,000,000,000 USD | Reported · Phase · Initial HUMAIN-DataVolt block | 2026-09-07 | Cost of the initial 100 MW facility as reported by Semafor; the article does not attribute the figure to DataVolt. | Semafor |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| DataVolt | Developer | Develops the campus under its 2025 agreement with NEOM and will also operate it. | NEOM; DataVolt |
| DataVolt | Operator | NEOM; DataVolt | |
| DataVolt | Investor | Committed an initial USD 5 billion for the first phase. | NEOM |
| HUMAIN | Developer | Co-develops the first 100 MW block with DataVolt and contributes its AI technology stack; advised by Hogan Lovells Cadwalader on the first phase. | NEOM; DataVolt; Hogan Lovells Cadwalader |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-02-10 | Announced | Actual | DataVolt and NEOM signed the campus agreement, including a land lease at Oxagon. | NEOM |
| 2026-08-31 | Construction started | Actual | Groundbreaking announced at LEAP for the 360 MW first phase, starting with the 100 MW block. | NEOM; DataVolt |
| 2028 | First operational | Planned | Ready-for-service target for the first 100 MW. Semafor reported in September 2026 that DataVolt plans to finish the first 100 MW facility within 13 months, which would be earlier than 2028. | NEOM; NEOM; DataVolt; Semafor; Hogan Lovells Cadwalader |
Power supply
| Type | Description | Sources |
|---|---|---|
| Other | The 2025 agreement says the campus is to run on renewable energy and operate at net zero, and the 2026 releases say it will integrate renewable sources; Oxagon is promoted as offering cost-competitive renewables and green hydrogen, but no specific supply has been named. | NEOM; NEOM; DataVolt |
Customer plans differ by source: DataVolt's release says the campus will serve international and domestic customers, while its chief executive told Semafor all capacity would be sold abroad. The August 2026 company releases disclose no investment figure for the 100 MW block; the only figure is Semafor's own estimate. DataVolt's chief executive also said project financing for the first facility was close to being secured.
Sources for these details
- DataVolt signs agreement with NEOM to design and develop the region's first truly sustainable, net-zero AI factory campus in Oxagon — NEOM; 2025-02-10
- HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM — NEOM; 2026-08-31
- HUMAIN Partners with DataVolt to Jointly Develop 100MW of a 360MW AI Data Center Project in NEOM — DataVolt; 2026-08-31
- Saudi Arabian data center firm races to export compute from NEOM — Semafor; 2026-09-07 · Archived source
- Hogan Lovells Cadwalader advises HUMAIN on AI data center development in Saudi Arabia — Hogan Lovells Cadwalader; 2026-09-07
- Companies
- Developer: DataVolt (unknown scope) evidence
- Developer: DataVolt (unknown scope) evidence
- Operator: DataVolt (unknown scope) evidence
- Operator: DataVolt (unknown scope) evidence
- Investor: DataVolt (unknown scope) evidence
- Developer: HUMAIN (unknown scope) evidence
- Developer: HUMAIN (unknown scope) evidence
- Developer: HUMAIN (unknown scope) evidence
Source and location review
- Status source
- HUMAIN and DataVolt Advance AI Infrastructure Framework with Nebius for planned Giga campus in NEOM's Oxagon (DataVolt breaking news, 21 October 2026) evidence row
DataVolt · published 2026-10-21 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 6 days before the data update on 2026-10-27
Location details
- Coordinates
- 27.56790, 35.54600
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources name Oxagon in NEOM but not a parcel. Coordinates are the OpenStreetMap Nominatim result for Oxagon (a construction land-use area in Duba governorate, Tabuk region).
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- ec1bd3eb
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| DataVolt signs agreement with NEOM to design and develop the region's first truly sustainable, net-zero AI factory campus in Oxagon Archived copy | NEOM Company disclosure | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Other, Role: Developer, Role: Investor, Operator claim | source-terms-not-recorded | NEOM | 76695e9e6632c12a34bc6cf46e70af1d3e334a9c8e5483eee9891103a12e598cFactual source record; not the publisher page | ||
| Hogan Lovells Cadwalader advises HUMAIN on AI data center development in Saudi Arabia Archived copy | Hogan Lovells Cadwalader Other | Imported: Record, Metric: Power Capacity, Milestone: First Operational, Role: Developer | source-terms-not-recorded | Hogan Lovells Cadwalader | 3989bbb84d86383e7219c53b0df10a5b86b091fb98b850143fc0ade5ee65aa1dFactual source record; not the publisher page | ||
| HUMAIN and DataVolt Advance AI Infrastructure Framework with Nebius for planned Giga campus in NEOM's Oxagon (DataVolt breaking news, 21 October 2026) Archived copy | DataVolt Company disclosure | Physical status | all-rights-reserved | DataVolt | fc32105f2a7559835a38e1fcaf2223ea264edb06e27b6360bbfe1e49e92f5fb3Retained source material; see source provenance | ||
| HUMAIN Partners with DataVolt to Jointly Develop 100MW of a 360MW AI Data Center Project in NEOM Archived copy | DataVolt Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Other, Role: Developer, Operator claim | source-terms-not-recorded | DataVolt | 0cacb05053fd46c9598fbc4b60a7260460e76751a278eaa078a866b4eb29c12fFactual source record; not the publisher page | ||
| HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM Archived copy | NEOM Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Other, Role: Developer | source-terms-not-recorded | NEOM | 9571fe0f86cd8013d9e0a1846b267dfa4f9aa2a0ba1a7579c2905417f8bf5b16Factual source record; not the publisher page | ||
| Saudi Arabian data center firm races to export compute from NEOM Archived copy | Semafor News | Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: First Operational | source-terms-not-recorded | Semafor | 0db919c0cbe7e010bdc73cbc73ee39fcf53f9903825c1daf80cba0ba8dd4e615Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). DataVolt Oxagon AI data centre campus (NEOM) [site vcc-site-a55b68896de9ae43657e]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a55b68896de9ae43657e/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction