DataVolt Oxagon AI data centre campus (NEOM)

Under construction

Saudi Arabia · 1 project · Last reported

Summary

Saudi developer DataVolt plans a 1.5 GW AI data centre campus at Oxagon, NEOM's industrial city on the Red Sea coast, on land leased from Oxagon. Under the February 2025 agreement DataVolt committed an initial USD 5 billion to the first phase, which is meant to run on renewable power. In August 2026 DataVolt and HUMAIN broke ground on a jointly developed 100 MW block within a 360 MW first phase, with the first 100 MW expected in service in 2028. Semafor reported in September 2026 that the initial facility would cost about USD 1 billion, and DataVolt's chief executive said the compute would be sold to customers abroad.

Source record as of 2026-09-07 · Details and sources

DataVolt's 21 October 2026 release on the HUMAIN-DataVolt-Nebius framework for the Oxagon AI campus describes the initial 100 MW, part of the first phase's planned 360 MW, as currently under construction. The status stays under construction with a newer observation date. Nebius's up-to-50 MW offtake is a preliminary framework, and operation from Q4 2027 is a forecast; no completion or operation of any part of the campus is established, and the planned 1.5 GW total is not under construction. evidence

DataVolt · published 2026-10-21

Location

The interactive map needs JavaScript. Display anchor: 27.56790, 35.54600 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

DataVolt Oxagon AI data centre campus (NEOM)

Under construction last observed as of · Authoritative status update

This record reports under construction as of 2026-09-07. NEOM; DataVolt; Semafor

Location: Oxagon, NEOM, Tabuk Province, SA. Sources name Oxagon in NEOM but not a parcel. Coordinates are the OpenStreetMap Nominatim result for Oxagon (a construction land-use area in Duba governorate, Tabuk region). NEOM; NEOM; DataVolt

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,500 MWPlanned · Campus · Unspecified2026-08-31NEOM; NEOM; DataVolt; Semafor
Power capacity360 MWPlanned · Phase · Unspecified · First phase2026-08-31NEOM; DataVolt; Hogan Lovells Cadwalader
Power capacity100 MWUnder construction · Phase · Unspecified · Initial HUMAIN-DataVolt block2026-09-07NEOM; DataVolt; Semafor
Investment5,000,000,000 USDAnnounced · Phase · First phase2025-02-10Initial DataVolt investment announced to fund the first phase, before the first phase was sized at 360 MW.NEOM
Investmentabout 1,000,000,000 USDReported · Phase · Initial HUMAIN-DataVolt block2026-09-07Cost of the initial 100 MW facility as reported by Semafor; the article does not attribute the figure to DataVolt.Semafor

Companies and organizations

NameRoleNotesSources
DataVoltDeveloperDevelops the campus under its 2025 agreement with NEOM and will also operate it.NEOM; DataVolt
DataVoltOperatorNEOM; DataVolt
DataVoltInvestorCommitted an initial USD 5 billion for the first phase.NEOM
HUMAINDeveloperCo-develops the first 100 MW block with DataVolt and contributes its AI technology stack; advised by Hogan Lovells Cadwalader on the first phase.NEOM; DataVolt; Hogan Lovells Cadwalader

Timeline

DateEventActual or plannedNotesSources
2025-02-10AnnouncedActualDataVolt and NEOM signed the campus agreement, including a land lease at Oxagon.NEOM
2026-08-31Construction startedActualGroundbreaking announced at LEAP for the 360 MW first phase, starting with the 100 MW block.NEOM; DataVolt
2028First operationalPlannedReady-for-service target for the first 100 MW. Semafor reported in September 2026 that DataVolt plans to finish the first 100 MW facility within 13 months, which would be earlier than 2028.NEOM; NEOM; DataVolt; Semafor; Hogan Lovells Cadwalader

Power supply

TypeDescriptionSources
OtherThe 2025 agreement says the campus is to run on renewable energy and operate at net zero, and the 2026 releases say it will integrate renewable sources; Oxagon is promoted as offering cost-competitive renewables and green hydrogen, but no specific supply has been named.NEOM; NEOM; DataVolt

Customer plans differ by source: DataVolt's release says the campus will serve international and domestic customers, while its chief executive told Semafor all capacity would be sold abroad. The August 2026 company releases disclose no investment figure for the 100 MW block; the only figure is Semafor's own estimate. DataVolt's chief executive also said project financing for the first facility was close to being secured.

Sources for these details
Companies
  • Developer: DataVolt (unknown scope) evidence
  • Developer: DataVolt (unknown scope) evidence
  • Operator: DataVolt (unknown scope) evidence
  • Operator: DataVolt (unknown scope) evidence
  • Investor: DataVolt (unknown scope) evidence
  • Developer: HUMAIN (unknown scope) evidence
  • Developer: HUMAIN (unknown scope) evidence
  • Developer: HUMAIN (unknown scope) evidence
Source and location review
Status source
HUMAIN and DataVolt Advance AI Infrastructure Framework with Nebius for planned Giga campus in NEOM's Oxagon (DataVolt breaking news, 21 October 2026) evidence row
DataVolt · published 2026-10-21 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 6 days before the data update on 2026-10-27

Location details
Coordinates
27.56790, 35.54600
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources name Oxagon in NEOM but not a parcel. Coordinates are the OpenStreetMap Nominatim result for Oxagon (a construction land-use area in Duba governorate, Tabuk region).
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
ec1bd3eb

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for DataVolt Oxagon AI data centre campus (NEOM)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
DataVolt signs agreement with NEOM to design and develop the region's first truly sustainable, net-zero AI factory campus in Oxagon
Archived copy
NEOM
Company disclosure
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Other, Role: Developer, Role: Investor, Operator claimsource-terms-not-recordedNEOM76695e9e6632c12a34bc6cf46e70af1d3e334a9c8e5483eee9891103a12e598c
Factual source record; not the publisher page
Hogan Lovells Cadwalader advises HUMAIN on AI data center development in Saudi Arabia
Archived copy
Hogan Lovells Cadwalader
Other
Imported: Record, Metric: Power Capacity, Milestone: First Operational, Role: Developersource-terms-not-recordedHogan Lovells Cadwalader3989bbb84d86383e7219c53b0df10a5b86b091fb98b850143fc0ade5ee65aa1d
Factual source record; not the publisher page
HUMAIN and DataVolt Advance AI Infrastructure Framework with Nebius for planned Giga campus in NEOM's Oxagon (DataVolt breaking news, 21 October 2026)
Archived copy
DataVolt
Company disclosure
Physical statusall-rights-reservedDataVoltfc32105f2a7559835a38e1fcaf2223ea264edb06e27b6360bbfe1e49e92f5fb3
Retained source material; see source provenance
HUMAIN Partners with DataVolt to Jointly Develop 100MW of a 360MW AI Data Center Project in NEOM
Archived copy
DataVolt
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Other, Role: Developer, Operator claimsource-terms-not-recordedDataVolt0cacb05053fd46c9598fbc4b60a7260460e76751a278eaa078a866b4eb29c12f
Factual source record; not the publisher page
HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM
Archived copy
NEOM
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Other, Role: Developersource-terms-not-recordedNEOM9571fe0f86cd8013d9e0a1846b267dfa4f9aa2a0ba1a7579c2905417f8bf5b16
Factual source record; not the publisher page
Saudi Arabian data center firm races to export compute from NEOM
Archived copy
Semafor
News
Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: First Operationalsource-terms-not-recordedSemafor0db919c0cbe7e010bdc73cbc73ee39fcf53f9903825c1daf80cba0ba8dd4e615
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). DataVolt Oxagon AI data centre campus (NEOM) [site vcc-site-a55b68896de9ae43657e]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a55b68896de9ae43657e/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction