Art Data Centres Ennis campus

Announced

Ireland · 1 project · Last reported

Summary

Six-hall, 200 MW data center campus planned by Art Data Centres on about 145 acres beside the Tulla Road on the eastern edge of Ennis, County Clare, near junction 13 of the M18. The national planning board granted permission in April 2024, and in March 2026 the High Court dismissed the last judicial review challenges after years of litigation. Investment is now put at more than EUR 1.6 billion over three phases. Phase 1, with a substation and two data halls, is due for commissioning by the end of 2028; enabling works start with diverting overhead power lines.

Source record as of 2026-03-25 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 52.84630, -8.98070 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Art Data Centres Ennis campus

Announced last observed as of · Reported status

Location: Ennis, County Clare, IE. Ennis town centroid from its Wikipedia article. Clare FM places the site beside the Tulla Road on the town's eastern side near M18 junction 13, but no cited source gives coordinates. Clare FM; Industrial Info Resources; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity200 MWPlanned · Campus · Unspecified2026-03-13Industrial Info describes six data halls of slightly more than 33 MW each.Clare FM; Industrial Info Resources; BeBeez International (republishing DCD)
Investmentmore than 1,600,000,000 EURReported · Campus2026-03-13Across three phases.Clare FM; Industrial Info Resources
Investmentabout 1,200,000,000 EURReported · Campus2025-03-21Earlier reported figure, superseded by the 2026 estimate of more than EUR 1.6 billion.BeBeez International (republishing DCD)
Land areaabout 145 acresPlanned · Campus2026-03-13Clare FM; Industrial Info Resources; BeBeez International (republishing DCD)
Floor areaabout 200,000 sq_ftPlanned · Phase · Each of six data halls2025-03-21Per-hall figure from the 2025 report; not summed into a campus total.BeBeez International (republishing DCD)
Buildings6 countPlanned · Campus2026-03-13Six data halls built in three phases of two buildings each.Clare FM; Industrial Info Resources; BeBeez International (republishing DCD)
Jobs constructionup to 1,200 countPlanned · Campus2026-03-13Clare FM
Jobs permanentup to 1,000 countPlanned · Campus2026-03-13Developer figure reported by Clare FM.Clare FM

Companies and organizations

NameRoleNotesSources
Art Data CentresDeveloperClare FM; Industrial Info Resources; BeBeez International (republishing DCD)
An Bord Pleanála (now An Coimisiún Pleanála)GovernmentGranted planning permission in April 2024.Clare FM; Industrial Info Resources; BeBeez International (republishing DCD)
EirGridUtilityWorking with the developer on diverting overhead power lines as the first enabling works.Clare FM
ESB NetworksUtilityWorking with the developer on diverting overhead power lines as the first enabling works.Clare FM

Timeline

DateEventActual or plannedNotesSources
2024-04Permit approvedActualPlanning permission from An Bord Pleanála; the 2025 report says permission was first granted in 2022.Clare FM; Industrial Info Resources; BeBeez International (republishing DCD)
2025-03OtherActualThe court found the judicial review grounds, including those concerning Leisler's bat, lacked merit; the remaining grounds were to be relisted later.BeBeez International (republishing DCD); Clare FM
2026-03OtherActualHigh Court dismissed the remaining judicial review challenges, ending almost six years of legal challenges and clearing the way for enabling works.Clare FM; Industrial Info Resources
2028First operationalPlannedPhase 1 (substation, data halls 2 and 3 and site works) due for completion and commissioning by the end of 2028; the 2025 report had targeted the first halls by the end of 2027.Clare FM; Industrial Info Resources

Power supply

TypeDescriptionSources
GridAn 83 MVA connection to the Ennis substation, per Industrial Info.Industrial Info Resources
WindIndustrial Info says an off-grid substation would be supplied by wind, solar and biogas.Industrial Info Resources
SolarSolar is one of the sources Industrial Info lists for the off-grid substation.Industrial Info Resources
OtherBiogas is one of the sources Industrial Info lists for the off-grid substation.Industrial Info Resources

No construction start had been reported by the sources opened; Clare FM says enabling works can now begin. Investment figures have risen across reports (EUR 1.2 billion in 2025, more than EUR 1.6 billion in 2026). Clare FM and Industrial Info give the campus as 145 acres or 1.3 million sq ft, presenting the two as equivalent although 145 acres is about 6.3 million sq ft; because neither says what the 1.3 million sq ft measures, it is not recorded as floor area. Industrial Info's six halls of slightly more than 33 MW each are not summed. The judicial review was brought by Friends of the Irish Environment, Futureproof Clare and several individuals.

Sources for these details
Companies
  • Developer: Art Data Centres (unknown scope) evidence
  • Developer: Art Data Centres (unknown scope) evidence
  • Developer: Art Data Centres (unknown scope) evidence
  • Government: An Bord Pleanála (now An Coimisiún Pleanála) (unknown scope) evidence
  • Government: An Bord Pleanála (now An Coimisiún Pleanála) (unknown scope) evidence
  • Government: An Bord Pleanála (now An Coimisiún Pleanála) (unknown scope) evidence
  • Utility: EirGrid (unknown scope) evidence
  • Utility: ESB Networks (unknown scope) evidence
Source and location review
Status source
High Court Clears Way For Construction Of €1.6bn Ennis Data Centre Project evidence row
Clare FM · published 2026-03-13 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 216 days before the data update on 2026-10-27

Location details
Coordinates
52.84630, -8.98070
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Ennis town centroid from its Wikipedia article. Clare FM places the site beside the Tulla Road on the town's eastern side near M18 junction 13, but no cited source gives coordinates.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
80ea5db6

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Art Data Centres Ennis campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Art Data Centres Ennis campus judicial review gets dismissed
Archived copy
BeBeez International (republishing DCD)
Trade publication
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Milestone: Permit Approved, Role: Developer, Role: Governmentsource-terms-not-recordedBeBeez International (republishing DCD)a4d67f88673082b782653a5fd4158527187bd9cc5673cfcfaf407f0411c696fb
Factual source record; not the publisher page
Court Clears Way for Major Irish Data Center
Archived copy
Industrial Info Resources
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Milestone: Permit Approved, Power Source: Grid, Power Source: Other, Power Source: Solar, Power Source: Wind, Role: Developer, Role: Governmentsource-terms-not-recordedIndustrial Info Resources64d3066fc1a42230f1e19e9b526e938b31c29272653d7652c39cc64f28bbebcf
Factual source record; not the publisher page
Ennis
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediabd917b8d03b6a0c75d6c751f1a7ee1112e15f7be8bca684abadbe6fd61df3a84
Factual source record; not the publisher page
High Court Clears Way For Construction Of €1.6bn Ennis Data Centre Project
Archived copy
Clare FM
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Milestone: Permit Approved, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedClare FM56d6f8e3e69d3b346da291ad650d1b74fb2015503911a3bdbf0e71e1d4ceb59e
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Art Data Centres Ennis campus [site vcc-site-a94efdae4ca44082dd5e]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a94efdae4ca44082dd5e/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction