National AI Computing Center, Solaseado (Haenam)

Under construction

Korea, Republic of · 1 project · Last reported

Summary

South Korea's government-backed National AI Computing Center is being built in the Solaseado data center park in Haenam County, South Jeolla. A consortium led by Samsung SDS was the only bidder in the 2025 tender and was confirmed as operator in 2026; a public-private joint venture, Korea AI Computing Center (KOACC), formed in June 2026 to build and run it. The project is budgeted at more than 2 trillion won through 2030 and targets at least 15,000 advanced GPUs by 2028 and about 50,000 by 2030. Ground was broken on 3 August 2026, with completion targeted for 2028.

Source record as of 2026-08-03 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 34.57420, 126.59750 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

National AI Computing Center, Solaseado (Haenam)

Under construction last observed as of · Reported status

Location: Sani-myeon (Solaseado), Haenam County, South Jeolla (Gwangju-Jeonnam), KR. Sources place the site in the Solaseado data center park in Sani-myeon, Haenam County, without coordinates; the point is the Haenam County coordinate from its Wikipedia article, so it marks the county, not the site. Samsung SDS; Edaily; Digital Today; Nocut News; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentmore than 2,000,000,000,000 KRWAnnounced · Campus2026-01-12Total budget for the national project from 2026 to 2030, funded by private and government investment and policy loans; the project centres on securing computing resources, so the figure is not the building cost alone.Samsung SDS; Edaily
Investment2,406,500,000,000 KRWReported · Campus2026-05-13Nocut News figure for the total to be injected by 2030, including 400 billion won of equity.Nocut News
Power capacity40 MWContracted · Campus · Grid connection2026-08-03Edaily reports a 40 MW supply confirmed by KEPCO and local governments after a grid review; it does not say whether this is IT or facility power.Edaily
Acceleratorsat least 15,000 countPlanned · Phase · 2028 target2026-01-12Advanced GPUs targeted by 2028 (Samsung SDS says more than 15,000). Edaily says the consortium's plan was based on Nvidia B200 but the chip choice may change.Samsung SDS; Edaily; Digital Today; Nocut News
Accelerators50,000 countPlanned · Campus2026-05-13GPU target for 2030, reached in stages.Nocut News

Companies and organizations

NameRoleNotesSources
Korea AI Computing Center Co., Ltd. (KOACC)DeveloperPublic-private special purpose company formed in June 2026 to build and operate the center.Edaily; Digital Today
Korea AI Computing Center Co., Ltd. (KOACC)OperatorEdaily; Digital Today
Samsung SDSDeveloperLeads the nine-member consortium selected as the private partner; consortium members include Naver Cloud, Samsung C&T, Kakao, Samsung Electronics, KT and Clush.Samsung SDS; Edaily; Digital Today; Nocut News
Ministry of Science and ICT (South Korea)GovernmentRuns the national project and co-founded the joint venture.Edaily; Digital Today; Nocut News
People's Growth FundInvestorPolicy fund under the Financial Services Commission that approved an investment and co-founded the joint venture.Digital Today
Jeollanam-do provincial governmentGovernmentConsortium member that prepared the site; the province has since become part of the Gwangju-Jeonnam integrated special city.Samsung SDS; Nocut News
Korea Electric Power Corporation (KEPCO)UtilityElectricity supplier to which the joint venture applied for service.Edaily; Digital Today

Timeline

DateEventActual or plannedNotesSources
2025-10OtherActualThe Samsung SDS consortium submitted the only bid in the government tender.Samsung SDS
2026-05-13OtherActualThe Samsung SDS consortium was confirmed as the final participant, with Solaseado as the site.Nocut News
2026-06OtherActualJoint venture Korea AI Computing Center (KOACC) incorporated to build and run the center.Edaily; Digital Today
2026-08-03Construction startedActualGroundbreaking ceremony held by the Ministry of Science and ICT and attended by the science minister. Edaily dates it to the 3rd; Digital Today, publishing the same day, says it took place on Sunday, which would be 2 August.Edaily; Digital Today
2028Fully operationalPlannedDigital Today says construction is to be completed by 2028 and Nocut News targets full-scale operation in the second half of 2028; Edaily's translated text refers to completion in 2027. Some computing resources are to be offered earlier from a Samsung SDS data center in 2027.Digital Today; Nocut News

Power supply

TypeDescriptionSources
GridPower from KEPCO, to which the joint venture applied for service.Edaily; Digital Today

Qualifies on investment: the budget of more than 2 trillion won exceeded USD 1 billion at the time. Reported totals vary between 2.0 and 2.5 trillion won across outlets. The site name is romanized several ways (Solaseado, SoLaSeaDo, Solasido). Wikipedia is cited only for the county coordinate. This is separate from the stalled OpenAI and SK data center plan, for which Haenam was one reported candidate site.

Sources for these details
Companies
  • Developer: Korea AI Computing Center Co., Ltd. (KOACC) (unknown scope) evidence
  • Developer: Korea AI Computing Center Co., Ltd. (KOACC) (unknown scope) evidence
  • Operator: Korea AI Computing Center Co., Ltd. (KOACC) (unknown scope) evidence
  • Operator: Korea AI Computing Center Co., Ltd. (KOACC) (unknown scope) evidence
  • Developer: Samsung SDS (unknown scope) evidence
  • Developer: Samsung SDS (unknown scope) evidence
  • Developer: Samsung SDS (unknown scope) evidence
  • Developer: Samsung SDS (unknown scope) evidence
  • Government: Ministry of Science and ICT (South Korea) (unknown scope) evidence
  • Government: Ministry of Science and ICT (South Korea) (unknown scope) evidence
  • Government: Ministry of Science and ICT (South Korea) (unknown scope) evidence
  • Investor: People's Growth Fund (unknown scope) evidence
  • Government: Jeollanam-do provincial government (unknown scope) evidence
  • Government: Jeollanam-do provincial government (unknown scope) evidence
  • Utility: Korea Electric Power Corporation (KEPCO) (unknown scope) evidence
  • Utility: Korea Electric Power Corporation (KEPCO) (unknown scope) evidence
Source and location review
Status source
South Korea Joins the Global GPU War: Building a 2 Trillion Won AI Outpost in Haenam, South Jeolla Province evidence row
Edaily · published 2026-08-03 · News
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 85 days before the data update on 2026-10-27

Location details
Coordinates
34.57420, 126.59750
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources place the site in the Solaseado data center park in Sani-myeon, Haenam County, without coordinates; the point is the Haenam County coordinate from its Wikipedia article, so it marks the county, not the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
4c353195

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for National AI Computing Center, Solaseado (Haenam)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Groundbreaking held for national AI computing center in Haenam, aims for 2028 completion
Archived copy
Digital Today
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Accelerators, Milestone: Construction Started, Milestone: Fully Operational, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Investor, Operator claim, Role: Utilitysource-terms-not-recordedDigital Today33650f044dc15da23196db346b9f5f76037fb662d2f29da6cb4c10aaae37696f
Factual source record; not the publisher page
Haenam County
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia213ae1484f6e8425b7dcfcabf362f0c4e112e6d786725c7747d11dc524a5cabc
Factual source record; not the publisher page
Jeonnam Province secures national AI Computing Center
Archived copy
Nocut News
News
Imported: Geometry, Imported: Record, Metric: Accelerators, Metric: Investment, Milestone: Fully Operational, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedNocut News1ef3f017a123f6fafc4daf1ef6bb52d56619bf26f8fc3a0a58cbf0cf182f9b6b
Factual source record; not the publisher page
Samsung SDS Consortium Takes Major Step Forward in National AI Computing Center Project with Its First Official Site Visit
Archived copy
Samsung SDS
Company disclosure
Imported: Geometry, Imported: Record, Metric: Accelerators, Metric: Investment, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedSamsung SDS2b95e8406c6faf6f5de66e25f02c0747a57b78c2d3ecd40d2cbd36663ff1e5ec
Factual source record; not the publisher page
South Korea Joins the Global GPU War: Building a 2 Trillion Won AI Outpost in Haenam, South Jeolla Province
Archived copy
Edaily
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Accelerators, Metric: Investment, Metric: Power Capacity, Milestone: Construction Started, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Operator claim, Role: Utilitysource-terms-not-recordedEdailyf0cba28d7a8cd53be2fb1dc56c5eb5d954a1d9553640cb037eced5af70669386
Factual source record; not the publisher page