DayOne Data Centers, a Singapore-based operator, is building the Chonburi Tech Park hyperscale campus in the AMATA City area of Chonburi province, southeast of Bangkok. Groundbreaking was reported in March 2025 for a design of 180 MW of grid capacity in two phases, which trade press tied to a US$1 billion multi-year investment. In November 2025 DayOne added adjacent land that lifts the first site (CTP1) to 300 MW and signed an MoU with Amata for a second plot (CTP2) aimed at a 1 GW platform, plus a floating-solar supply deal. In April 2026 DayOne said more than 100 MW of IT capacity was expected to go live during 2026.
Source record as of 2026-04-26 · Details and sources
DayOne's F-1, filed October 5, 2026, reports its Thailand campuses at Chonburi Tech Park as of September 20, 2026. They had 120 MW of bookings: 73 MW of Capacity In Service (ready for service and fully fitted out) and 47 MW under construction. The campus is therefore partly in service; this does not establish completion of every phase or site. evidence
DayOne Data Centers Limited via SEC EDGAR · published 2026-10-05
Location
The interactive map needs JavaScript. Display anchor: 13.21700, 101.18300 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
State or region reference only; the facility position is not established.
Projects (1)
DayOne Chonburi Tech Park (CTP) data center campus
Operational last observed as of · Authoritative status update
This record reports under construction as of 2026-04-26. DayOne Data Centers (via AAP / Cision)
Location: AMATA City Chonburi industrial estate, Chonburi, TH. Sources place the campus in the AMATA City estate in Chonburi province but give no district or address. The point is the province coordinate from the Chonburi province Wikipedia article, so it marks the province, not the site. Intelligent CIO APAC; DayOne Data Centers; Wikipedia
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 180 MW | Planned · Campus · Grid connection | 2025-03-19 | Grid capacity of the campus as designed at groundbreaking, to be built in two phases; later raised for CTP1 (see the 300 MW figure). | Intelligent CIO APAC |
| Power capacity | 300 MW | Planned · Phase · Unspecified · CTP1 with November 2025 land expansion | 2025-11-10 | Site power capacity of the first plot after adding adjacent land; the sources do not say whether this is IT or grid capacity. | DayOne Data Centers; Bernama; DayOne Data Centers |
| Power capacity | 1,000 MW | Planned · Campus · Unspecified | 2025-11-10 | Target for a combined 1 GW power platform across CTP1 and the future CTP2 plot; CTP2 was covered only by an MoU. | DayOne Data Centers; Bernama |
| Power capacity | more than 100 MW | Planned · Phase · It load · Capacity due to go live in 2026 | 2026-04-26 | IT capacity DayOne expected to bring online during 2026 as part of a multi-phase rollout. | DayOne Data Centers (via AAP / Cision) |
| Investment | 1,000,000,000 USD | Announced · Campus | 2025-03-19 | Intelligent CIO ties a US$1 billion investment, committed over the next few years, to this campus. DayOne's April 2026 release (s4) instead describes US$1 billion as the commitment it made on entering Thailand, without tying it to the campus; the conflict is unresolved. | Intelligent CIO APAC |
| Land area | about 12.2 hectares | Reported · Campus | 2025-03-19 | Reported as 122,000 square metres for the campus at groundbreaking, before the November 2025 additions. | Intelligent CIO APAC |
| Land area | about 16.3 acres | Planned · Phase · CTP1 adjacent land added in November 2025 | 2025-11-10 | Reported as 41.3 rai of adjacent land. | DayOne Data Centers; Bernama |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| DayOne Data Centers | Developer | Singapore-headquartered developer and operator of the campus. | Intelligent CIO APAC; DayOne Data Centers; DayOne Data Centers (via AAP / Cision) |
| Amata B.Grimm Renewable Energy (AMBRE) | Power supplier | Signed a private power purchase agreement to supply floating-solar electricity to the campus. | DayOne Data Centers; Bernama |
| Provincial Electricity Authority (PEA) | Utility | Part of the three-way arrangement that delivers the solar power over its grid. | DayOne Data Centers |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2024-11 | Announced | Actual | DayOne announced its entry into Thailand. | DayOne Data Centers |
| 2025-03 | Construction started | Actual | Groundbreaking reported by Intelligent CIO on 2025-03-19 without a ceremony date; DayOne's April 2026 release gives only the year 2025. | Intelligent CIO APAC; DayOne Data Centers (via AAP / Cision) |
| 2025-11-10 | Expansion announced | Actual | MoU with Amata for CTP2 and adjacent CTP1 land, lifting CTP1 to 300 MW and targeting a 1 GW platform; solar PPA signed the same day. | DayOne Data Centers; Bernama |
| 2026 | First operational | Planned | More than 100 MW of IT capacity expected to go live in 2026; DayOne's market page lists a 2026 ready-for-service date. | DayOne Data Centers (via AAP / Cision); DayOne Data Centers |
| 2027 | Other | Planned | Expected commercial operation of the floating-solar plant and start of renewable integration. | DayOne Data Centers; DayOne Data Centers (via AAP / Cision) |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | The campus was designed around 180 MW of grid capacity; solar power is delivered through the Provincial Electricity Authority grid. | Intelligent CIO APAC; DayOne Data Centers |
| Solar | Private power purchase agreement with AMBRE for a 22 kV floating-solar plant in the AMATA City estate, initially 42.5 MWp, expected to start commercial operation in 2027. | DayOne Data Centers; Bernama |
Amata Corporation signed the November 2025 MoU covering CTP2 and the land added to CTP1 and is called a strategic partner, but no formal ownership or development role is stated, so it is not listed as a party. The US$1 billion rests on one trade-press report (s1); DayOne's April 2026 release frames it as a Thailand-entry commitment. That release describes the campus as under development with capacity due in 2026; no source confirms capacity was live by October 2026. Only Intelligent CIO places the campus in AMATA City; DayOne's pages name Chonburi province. Province coordinates come from Wikipedia (s5), used only for the map point.
Sources for these details
- DayOne breaks ground on hyperscale data center pioneering Thailand's digital future — Intelligent CIO APAC; 2025-03-19
- DayOne Strengthens Thailand's Digital Hub with Amata as Chonburi Campus Expands Toward the Country's First 1GW Power Platform — DayOne Data Centers; 2025-11-10 · Archived source
- DayOne, Amata In Deal To Build Thailand's First 1GW Power Platform — Bernama; 2025-11-11
- DayOne Launches Inaugural Tech & AI Career Expo in Thailand, Showcasing Commitment to Digital Infrastructure and Talent Development — DayOne Data Centers (via AAP / Cision); 2026-04-26
- Chonburi province — Wikipedia; publication date not stated
- Our markets: Greater Bangkok — DayOne Data Centers; publication date not stated · Archived source
- Companies
- Developer: DayOne Data Centers (unknown scope) evidence
- Developer: DayOne Data Centers (unknown scope) evidence
- Developer: DayOne Data Centers (unknown scope) evidence
- Power Supplier: Amata B.Grimm Renewable Energy (AMBRE) (unknown scope) evidence
- Power Supplier: Amata B.Grimm Renewable Energy (AMBRE) (unknown scope) evidence
- Utility: Provincial Electricity Authority (PEA) (unknown scope) evidence
Source and location review
- Status source
- DayOne Data Centers Limited Form F-1 registration statement, filed October 5, 2026 (Internet Archive copy of the EDGAR document) evidence row
DayOne Data Centers Limited via SEC EDGAR · published 2026-10-05 · Regulatory filing - Locator
- State or region reference only · Compiled location reference · admin1 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 37 days before the data update on 2026-10-27
Location details
- Coordinates
- 13.21700, 101.18300
- Geometry licence
- source-terms-not-recorded
- Use scope
- State or region reference only
- Scope class
- admin1
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources place the campus in the AMATA City estate in Chonburi province but give no district or address. The point is the province coordinate from the Chonburi province Wikipedia article, so it marks the province, not the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 3ec56c55
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Chonburi province Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 845b2ef18719c6734d699f2d173513a96aafa76af89d9c775c902c94dd51276aFactual source record; not the publisher page | |
| DayOne breaks ground on hyperscale data center pioneering Thailand's digital future Archived copy | Intelligent CIO APAC Trade publication | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Power Source: Grid, Role: Developer | source-terms-not-recorded | Intelligent CIO APAC | b379bc7063f57facd1f7599613052abf1ca7cc488143b9a2c4e417eb2701d75dFactual source record; not the publisher page | ||
| DayOne Data Centers Limited Form F-1 registration statement, filed October 5, 2026 (Internet Archive copy of the EDGAR document) Archived copy | DayOne Data Centers Limited via SEC EDGAR Regulatory filing | Physical status, Operator claim, Owner claim | source-terms-not-recorded | DayOne Data Centers Limited; U.S. Securities and Exchange Commission EDGAR; archived by the Internet Archive Wayback Machine | ef2d8312d6f912c7480d5e7a5e54b11c47918e85c16c4ae5a436871445aab2f0Retained source material; see source provenance | ||
| DayOne Launches Inaugural Tech & AI Career Expo in Thailand, Showcasing Commitment to Digital Infrastructure and Talent Development Archived copy | DayOne Data Centers (via AAP / Cision) Company disclosure | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Role: Developer | source-terms-not-recorded | DayOne Data Centers (via AAP / Cision) | 004b16f0776a20bfbdbd69c0973fb3982bbc254f7fed2b585324476681e543f4Factual source record; not the publisher page | ||
| DayOne Strengthens Thailand's Digital Hub with Amata as Chonburi Campus Expands Toward the Country's First 1GW Power Platform Archived copy | DayOne Data Centers Company disclosure | Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: Other, Power Source: Grid, Power Source: Solar, Role: Developer, Role: Power Supplier, Role: Utility | source-terms-not-recorded | DayOne Data Centers | e256ab2998bb22ab692e6d9b989e9561d958e57838e38ad130e5054852169ecfFactual source record; not the publisher page | ||
| DayOne, Amata In Deal To Build Thailand's First 1GW Power Platform Archived copy | Bernama News | Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Expansion Announced, Power Source: Solar, Role: Power Supplier | source-terms-not-recorded | Bernama | e8ada35cadadbbd1acffd071462972420053729f440a5204c3b2143f4132ce32Factual source record; not the publisher page | ||
| Our markets: Greater Bangkok Archived copy | DayOne Data Centers Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational | not stated | source-terms-not-recorded | DayOne Data Centers | 2aef33d8937f73038f2ed1cfe20199005d530602fb65e3c65d43b50469af4c9bFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). DayOne Chonburi Tech Park (CTP) data center campus [site vcc-site-b020cba78b5fa2123866]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b020cba78b5fa2123866/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction