Summary

Meta's first data centre in Canada, a 1 GW campus optimized for its AI workloads in Sturgeon County, Alberta, in the Edmonton region, with more than CA$13 billion of planned investment. Meta announced the groundbreaking in July 2026. Meta says it is fully funding new generation and grid infrastructure in Alberta and names Greenlight Limited Partnership, AltaLink, Capital Power and the Alberta Electric System Operator as energy-planning partners. Frost Collective, a joint venture of Clark Builders and PCL Construction, is the general contractor. The project website's page description cites 1.6 GW, which differs from Meta's 1 GW figure.

Source record as of 2026-07-08 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 53.81807, -113.18668 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Project locator; building footprints are not mapped.

Projects (1)

Meta Sturgeon County Alberta Current Campus Build

Under construction last observed as of · Authoritative construction start

Location: Sturgeon County, Alberta, CA. County point from OpenStreetMap Nominatim; Meta names Sturgeon County but no specific site, and the project website places it in the Edmonton region. Meta Platforms; Meta Platforms; Sturgeon Data Centre project website

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,000 MWPlanned · Campus · Unspecified2026-07-08Meta Platforms; Meta Platforms
Power capacity1,600 MWPlanned · Campus · Unspecified2026-10-09Appears only in the project website's page description metadata, not its visible text, as read on 2026-10-09; conflicts with Meta's 1 GW announcement.Sturgeon Data Centre project website
Investmentmore than 13,000,000,000 CADAnnounced · Campus2026-07-08Meta Platforms; Meta Platforms; Meta Platforms
Jobs constructionabout 3,000 countPlanned · Campus2026-07-08Peak construction workforce. The fact sheet also says the general contractor will manage more than 3,000 workers at peak, and the project website gives more than 3,000.Meta Platforms; Meta Platforms; Meta Platforms
Jobs permanentmore than 300 countPlanned · Campus2026-07-08Meta's fact sheet gives about 300.Meta Platforms; Meta Platforms

Companies and organizations

NameRoleNotesSources
Meta PlatformsDeveloperMeta Platforms; Meta Platforms
Frost CollectiveBuilderGeneral contractor; a joint venture of Clark Builders and PCL Construction.Meta Platforms; Meta Platforms
Clark BuildersBuilderMeta Platforms; Meta Platforms; Sturgeon Data Centre project website
PCL ConstructionBuilderMeta Platforms; Meta Platforms; Sturgeon Data Centre project website
AltaLinkUtilityNamed by Meta as an energy-planning partner; supply terms not disclosed.Meta Platforms; Meta Platforms; Meta Platforms
Greenlight Limited PartnershipPower supplierNamed by Meta as an energy-planning partner; supply terms not disclosed.Meta Platforms; Meta Platforms; Meta Platforms
Capital PowerPower supplierNamed by Meta as an energy-planning partner (spelled Capitol Power in the newsroom post); supply terms not disclosed.Meta Platforms; Meta Platforms; Meta Platforms
Sturgeon CountyGovernmentMeta says it pays the county the full cost of water and wastewater service.Meta Platforms

Timeline

DateEventActual or plannedNotesSources
2026-07-08AnnouncedActualMeta described it as its first data center in Canada.Meta Platforms; Meta Platforms
2026-07Construction startedActualMeta announced the groundbreaking on 2026-07-08; the exact start of site works is not given.Meta Platforms

Power supply

TypeDescriptionSources
GridMeta says it planned its energy needs with Greenlight Limited Partnership, AltaLink, Capital Power and the Alberta Electric System Operator, is fully funding new generation and grid infrastructure in Alberta, and will match the site's electricity use with clean energy. The generation type is not specified.Meta Platforms; Meta Platforms; Meta Platforms

Meta's fact sheet PDF (s3) shows no publication date; its embedded file creation date is in early September 2026. The project website (s4) is undated; its 1.6 GW figure carries the date it was read (2026-10-09).

Sources for these details
Companies
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Builder: Frost Collective (unknown scope) evidence
  • Builder: Frost Collective (unknown scope) evidence
  • Builder: Clark Builders (unknown scope) evidence
  • Builder: Clark Builders (unknown scope) evidence
  • Builder: Clark Builders (unknown scope) evidence
  • Builder: PCL Construction (unknown scope) evidence
  • Builder: PCL Construction (unknown scope) evidence
  • Builder: PCL Construction (unknown scope) evidence
  • Utility: AltaLink (unknown scope) evidence
  • Utility: AltaLink (unknown scope) evidence
  • Utility: AltaLink (unknown scope) evidence
  • Power Supplier: Greenlight Limited Partnership (unknown scope) evidence
  • Power Supplier: Greenlight Limited Partnership (unknown scope) evidence
  • Power Supplier: Greenlight Limited Partnership (unknown scope) evidence
  • Power Supplier: Capital Power (unknown scope) evidence
  • Power Supplier: Capital Power (unknown scope) evidence
  • Power Supplier: Capital Power (unknown scope) evidence
  • Government: Sturgeon County (unknown scope) evidence
Source and location review
Status source
Breaking Ground on Meta’s First Data Center in Canada evidence row
Meta · published 2026-07-08T19:30:30Z · Company disclosure
Locator
Project locator · Official source · representative_point_of_partial_permit_envelope evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 111 days before the data update on 2026-10-27

Location details
Coordinates
53.81807, -113.18668
Geometry licence
Open-Government-Licence-Alberta
Use scope
Project locator
Scope class
representative_point_of_partial_permit_envelope
Authority
Official source
Source entity
Project
Method
official_permit_units_representative_point
Derivation
official_parcel_union
Precision scope
Representative point of the deterministic union of 11 official ATS quarter sections named by DP-26-0028; Shapely 2.1.2/GEOS 3.13.1 unary_union followed by representative_point. It is a partial permit-envelope locator, not the full project boundary, parcel survey, building, or work area.
Horizontal uncertainty
Not reported

The selected permit units include road allowances and non-quarter cadastral identifiers that are not represented by the 11 queried quarter-section polygons.

Geometry evidence
e049970c

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Meta Sturgeon County Alberta Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Alberta Township System quarter sections named by Sturgeon County DP-26-0028
Archived copy
Government of Alberta
Government record
Geometrynot statedOpen-Government-Licence-AlbertaGovernment of Albertaf55a2324cb403d33cd89deaa6ce47b2e27bb24b77845403c3d1d6d1005194a3a
Retained source material; see source provenance
Breaking Ground on Meta's First Data Center in Canada
Archived copy
Meta Platforms
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Power Source: Grid, Role: Developer, Role: Power Supplier, Role: Utilitysource-terms-not-recordedMeta Platforms0f8112a7caba21a914d2efddf2a40025b7670df9fb321cf67ed6e13de58498d4
Factual source record; not the publisher page
Breaking Ground on Meta’s First Data Center in Canada
Archived copy
Meta
Company disclosure
Source location context, Physical statusall-rights-reservedMeta2ee9ab456d8d58d14a4813432de9160dd645651b266f7c1d19616fb6bab49a42
Retained source material; see source provenance
Development permit approval notice for 56111 Rge Rd 223
Archived copy
Sturgeon County
Government record
Geometry identity contextgovernment-copyright-fact-extraction-onlySturgeon County7efcc7d83996b817bf33374b88e0f2fec005eca9006afc2884393961ca8722fb
Retained source material; see source provenance
Hello, Sturgeon County!
Archived copy
Meta Platforms
Company disclosure
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Builder, Role: Developer, Role: Power Supplier, Role: Utilitysource-terms-not-recordedMeta Platforms00d71212749998bc5d4f6c6f82a31ce5ff8d84585c08a4b84c6db60840c1676d
Factual source record; not the publisher page
Meta Sturgeon Data Centre fact sheet
Archived copy
Meta Platforms
Company disclosure
Imported: Record, Metric: Investment, Metric: Jobs Construction, Power Source: Grid, Role: Builder, Role: Government, Role: Power Supplier, Role: Utilitynot statedsource-terms-not-recordedMeta Platformsbace19a48a0ff47f63c229e59e1b4dc371969fd3f91f9e2100ebab4689d65c70
Factual source record; not the publisher page
Sturgeon Data Centre
Archived copy
Sturgeon Data Centre project website
Company disclosure
Imported: Geometry, Imported: Record, Metric: Power Capacity, Role: Buildernot statedsource-terms-not-recordedSturgeon Data Centre project website6fe498760a936c19f1f835bc23e19ae8e52b41510cd27261d689576823b35154
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Meta Sturgeon County Alberta Data Center [site vcc-site-b8522efc1a60fe3072e4]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b8522efc1a60fe3072e4/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction