STACK MIL05 Data Center Campus, Vignate (Via Galileo Galilei)
Announced
Italy · 1 project · Last reported
Summary
ARPA Lombardia's letter registered by the Ministry on 9 October 2026, in the compliance verification ID_VIP 15187 of condition 6B of VIA decree no. 411 of 30 June 2026, names the project 'Realizzazione di un nuovo Data Center denominato MIL05 ubicato nel comune di Vignate (MI)' of Infrastructure Italia Land 5 S.r.l. and finds the proponent's power-line excavation documents suitable. This dated government record supports announced only. The VIA decree is an environmental-compatibility decision, not a building permit; the conditions being verified are ante-operam measures due before works start, and a second compliance verification (ID_VIP 15251, conditions 3 and 6A) entered technical review on 16 October 2026. No building permit, site work, construction or operation is asserted. evidence
ARPA Lombardia (regional environmental protection agency), published on the MASE VA portal · published 2026-10-12
Location
The interactive map needs JavaScript. Display anchor: 45.50130, 9.36985 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
MIL05 — planned 60 MW IT two-building data-centre campus (MIL05A and MIL05B; VIA decree DM 411/2026, ID_VIP 13497)
Announced last observed as of · Project announcement
The project page names the proponent Infrastructure Italia Land 5 S.r.l., the territory (Lombardia, Milano, Vignate) and three procedures: the VIA ID_VIP 13497 filed 23 December 2024, concluded by decree DM_2026-0000411 of 30 June 2026 (positive with conditions, notified 9 July 2026); a compliance verification ID_VIP 15187 filed 7 August 2026 for condition 6B; and a compliance verification ID_VIP 15251 filed 30 September 2026 for conditions 3 and 6A, whose technical review by the CTVIA started on 16 October 2026. Both compliance verifications are in technical review. evidence
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione generale Valutazioni ambientali · publication date not stated
The decree, on the application of Infrastructure Italia Land 5 S.r.l. received 23 December 2024, records that the project provides in Vignate (MI) for a new data centre supplied by two 220 kV cables, with 50 emergency generators of 298 MWt in total, diesel storage of 2,083 m3, a dedicated 220 kV substation on the south-east side of the site and photovoltaic plants on the roofs and car-park canopies, and expresses a positive environmental-compatibility judgement with conditions. It is an environmental decision under the VIA procedure, not a building permit. evidence
Ministero dell'Ambiente e della Sicurezza Energetica, in concert with the Ministero della cultura · published 2026-07-01
The proponent's report, headed 'MIL05 Vignate (MI) - Data Center, Via Galileo Galilei SNC, 20052 Vignate (MI)', refers to the conditions of MASE decree 411/2026 for project ID_VIP 13497 and states that this first phase of compliance verification concerns measures to be put in place before the start of works; condition 3 (ante-operam, before the start of works) requires a construction-site traffic study, which is attached. The header and introduction also carry an 'ID_VIP 11245', a 'Decreto MASE 212.10-04-2026' and a 'VIA postuma' wording that match a different STACK procedure (Liscate) and appear to be template carry-overs; the body, the MASE page and the ARPA letter all cite decree 411/2026 for ID_VIP 13497. evidence
Infrastructure Italia Land 5 S.r.l. (filing published on the MASE VA portal) · published 2026-10-05
The air-quality study models 50 standby-generator stacks (E1-E50, 14 m high) and prints their coordinates in UTM 32N WGS84 in Tabella 4.3b: E1-E20 at about 528,817-529,013 E / 5,038,782-5,038,810 N, E21-E39 at about 528,838-529,031 E / 5,038,652-5,038,679 N, and E40-E50 at about 528,630-528,779 E / 5,038,550-5,038,577 N. evidence
Infrastructure Italia Land 5 S.r.l. (filing published on the MASE VA portal) · published 2025-03-10
Georeferenced imagery extract used only to check the WGS84 reading of the filed building outlines: A and B fall on a large cleared plot south of an existing factory complex, C and D on the south-west lot (wooded strip and a small existing building), with no systematic offset. Not a measured accuracy and not a status observation. evidence
Esri · publication date not stated
- Companies
- Operator: STACK Infrastructure (intended) evidence
Source and location review
- Status source
- ARPA Lombardia response of 9 October 2026 (MASE incoming 0210616) in the compliance verification ID_VIP 15187 for condition 6B of VIA decree DM 411 of 30 June 2026: 'Realizzazione di un nuovo Data Center denominato MIL05 ubicato nel comune di Vignate (MI)' evidence row
ARPA Lombardia (regional environmental protection agency), published on the MASE VA portal · published 2026-10-12 · Government record - Locator
- Campus locator · Compiled location reference · official_filing_building_outline_union_centroid evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 45.50130, 9.36985
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_filing_building_outline_union_centroid
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- regulatory_filing_utm32n_wgs84_building_vertices_a_b_c_d_union_area_centroid_epsg32632_inverse_projected_to_wgs84
- Derivation
- coordinate_transform
- Precision scope
- Area centroid of the union of the four planned building outlines (A, B, C and D, 18,086 m2 in total) printed in UTM 32N WGS84 in the proponent's building-downwash integration to the MIL05 VIA. A and B form the main MIL05A data-hall building; C and D lie on the south-west MIL05B lot, 50 m (D) and 116 m (C) from A+B. The point falls inside outline A, 10.7 m from its edge; the outer vertices are up to 297 m away. The outlines are modelling inputs, not surveyed footprints or parcel boundaries.
- Horizontal uncertainty
Not reported
The filing states no positional accuracy; the point is the computed centroid of modelled outlines spread over about 430 by 230 m, and the final design may differ. Decimal places are computation precision, not accuracy.
- Geometry evidence
- a70b80b2
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| 'Building DownWash e Aggiornamento mappe ricadute' (R001-1670346PPI-V00), integration to the MIL05 VIA (ID_VIP 13497) filed by Infrastructure Italia Land 5 S.r.l. Archived copy | Infrastructure Italia Land 5 S.r.l. (filing published on the MASE VA portal) Regulatory filing | Geometry | all-rights-reserved | Infrastructure Italia Land 5 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | 43f56f7f352ed1808e4de7df776b2054dde7d303a297719f1f30828a3464d804Retained source material; see source provenance | ||
| 'Studio degli impatti sulla qualità dell'aria - Nuovo Data Center Vignate' (R002-1669569PPI-V01_2024), Allegato A to the SIA of the MIL05 VIA (ID_VIP 13497), filed by Infrastructure Italia Land 5 S.r.l. Archived copy | Infrastructure Italia Land 5 S.r.l. (filing published on the MASE VA portal) Regulatory filing | Site and project identity | all-rights-reserved | Infrastructure Italia Land 5 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | e7d611ca40082decefb9ef311e161b2ed9cbdfe28a2ebdf0a12996d805432d27Retained source material; see source provenance | ||
| ARPA Lombardia response of 9 October 2026 (MASE incoming 0210616) in the compliance verification ID_VIP 15187 for condition 6B of VIA decree DM 411 of 30 June 2026: 'Realizzazione di un nuovo Data Center denominato MIL05 ubicato nel comune di Vignate (MI)' Archived copy | ARPA Lombardia (regional environmental protection agency), published on the MASE VA portal Government record | Project announcement | all-rights-reserved | ARPA Lombardia / MASE Portale Valutazioni e Autorizzazioni Ambientali | 9df86260b4c4a8b110029dcabdf3df281932d536753c963c2b969b787d5304c8Retained source material; see source provenance | ||
| Esri World Imagery export: Vignate, Via Galileo Galilei area (EPSG:32632, 528480-529200 E, 5038420-5038950 N) Archived copy | Esri Other | Site and project identity | not stated | Esri World Imagery terms of use; not redistributed | Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery) | 3eb85de3ddefa994ac6f4d4e7bc2e584a99119931b817070565b9f4a3a9e51abRetained source material; see source provenance | |
| Infrastructure Italia Land 5 S.r.l.: compliance report for environmental conditions 3A, 3B and 3C (construction-site traffic), MIL05 Vignate (MI) Data Center, Via Galileo Galilei SNC (document dated 28 September 2026; ID_VIP 15251) Archived copy | Infrastructure Italia Land 5 S.r.l. (filing published on the MASE VA portal) Regulatory filing | Site and project identity | all-rights-reserved | Infrastructure Italia Land 5 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | 9cf2304f29e19c43082aa7c13635cdc6b1c1dcc2a2e6169d09c4c8c218afad67Retained source material; see source provenance | ||
| MASE decree DM_2026-0000411 of 30 June 2026: environmental compatibility decree for 'Realizzazione di un nuovo Data Center denominato "MIL05" ubicato nel comune di Vignate (MI)' (ID_VIP 13497) Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica, in concert with the Ministero della cultura Government record | Site and project identity | all-rights-reserved | MASE MASE Portale Valutazioni e Autorizzazioni Ambientali | bdad31a545fda071f0a8ea62948d1893c6245cb126cc002ba30c7bae9966a293Retained source material; see source provenance | ||
| MASE VA portal: object 11494, 'Realizzazione di un nuovo Data Center denominato "MIL05" ubicato nel comune di Vignate (MI)' (procedures 13497, 15187, 15251) Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione generale Valutazioni ambientali Government record | Site and project identity | not stated | all-rights-reserved | MASE MASE Portale Valutazioni e Autorizzazioni Ambientali | ac7400685da95eabed37c20912b99fd96a14f7926ebe3ddc1e622f52d8f00f1fRetained source material; see source provenance | |
| STACK Infrastructure: MIL05 campus page (Milan locations) Archived copy | STACK Infrastructure Operator website | Operator claim | not stated | all-rights-reserved | STACK Infrastructure | bf0d5a85179856a4ceb26a1d3ce14e99168ddbe70ed35517984a45b1eb2a545cRetained source material; see source provenance |
Cite this site
Kyars, K. (2026). STACK MIL05 Data Center Campus, Vignate (Via Galileo Galilei) [site vcc-site-c5b814ddf09ef4e9b7e5]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c5b814ddf09ef4e9b7e5/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction