Akashi Astana Data Center Campus

Under construction

Kazakhstan · 1 project · Last reported

Summary

Akashi reports that a technical press tour on September 24, 2026 showed construction of its Astana campus. General construction of the first module (DC-1, 5.28 MW planned IT load) is being finished and engineering work is starting; main on-site substation equipment is installed. First-phase commercial launch is planned for 2027, a forecast rather than completion. evidence

Akashi Data Center · published 2026-09-24

Location

The interactive map needs JavaScript. Display anchor: 51.20677, 71.45771 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Site locator; building footprints are not mapped.

Projects (1)

Akashi Astana Phase 1 Current Build

Under construction last observed as of · Authoritative status update

Akashi says its Astana campus is being built and markets turnkey enterprise colocation across four planned data-center buildings. evidence

Akashi Data Center · publication date not stated

Operating model
Colocation evidence
Companies
  • Operator: Akashi Data Center (intended) evidence

Power

MetricStageValueAs ofMethodNotesEvidence
Critical IT loadPlanned5.28 MWReportedReported phase-1 IT load retained at planned stage. It is not installed, energized, operational, current demand, grid capacity, generation, consumption, or annual energy.evidence
Source and location review
Status source
Akashi reports September 24 technical press tour of its Astana campus construction evidence row
Akashi Data Center · published 2026-09-24 · Company disclosure
Locator
Reviewed site locator · Official source · same_parcel_infrastructure_reference_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 33 days before the data update on 2026-10-27

Location details
Coordinates
51.20677, 71.45771
Geometry licence
no-license-stated-for-compact-factual-extraction
Use scope
Reviewed site locator
Scope class
same_parcel_infrastructure_reference_point
Authority
Official source
Source entity
Project
Method
authoritative_site_plan
Derivation
direct_geometry
Precision scope
Official site-plan point for a substation within the same data-centre parcel; 500 metre stated uncertainty and not a hall footprint.
Horizontal uncertainty
500 m
Geometry evidence
ff1fe928

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Akashi Astana Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
About Akashi
Archived copy
Akashi Data Center
Company disclosure
Operating model, Operator claimnot statedall-rights-reservedAkashi Data Center01e105af2a09a3e96987bccde8d7c7cc68cf6add95ab48c6d9286e4dca5ce774
Retained source material; see source provenance
Akashi 110/10 kV substation center within Astana cadastral parcel 21-324-059-695
Archived copy
Unified Environmental Portal of Kazakhstan
Government record
Geometrynot statedno-license-stated-for-compact-factual-extractionUnified Environmental Portal of Kazakhstande22fb8e3444bb0190c8eb91990a4537321729b294258f2729f79aaba4c2ffa7
Retained source material; see source provenance
Akashi reports September 24 technical press tour of its Astana campus construction
Archived copy
Akashi Data Center
Company disclosure
Physical statusall-rights-reservedAkashi Data Centera1da2237d980c7adb91eadeb520e28fe66b2ccaee75998ba8104766adf51b1fb
Retained source material; see source provenance
Construction progress
Archived copy
Akashi Data Center
Company disclosure
Physical status, Critical IT load observationnot statedall-rights-reservedAkashi Data Centera2f3f281a66151c90b6a6ea0a089e9cab9361b586f60cde06febb1d49fee6b9f
Retained source material; see source provenance