Akashi reports that a technical press tour on September 24, 2026 showed construction of its Astana campus. General construction of the first module (DC-1, 5.28 MW planned IT load) is being finished and engineering work is starting; main on-site substation equipment is installed. First-phase commercial launch is planned for 2027, a forecast rather than completion. evidence
Akashi Data Center · published 2026-09-24
Location
The interactive map needs JavaScript. Display anchor: 51.20677, 71.45771 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Site locator; building footprints are not mapped.
Projects (1)
Akashi Astana Phase 1 Current Build
Under construction last observed as of · Authoritative status update
Akashi says its Astana campus is being built and markets turnkey enterprise colocation across four planned data-center buildings. evidence
Akashi Data Center · publication date not stated
- Operating model
- Colocation evidence
- Companies
- Operator: Akashi Data Center (intended) evidence
Power
| Metric | Stage | Value | As of | Method | Notes | Evidence |
|---|---|---|---|---|---|---|
| Critical IT load | Planned | 5.28 MW | Reported | Reported phase-1 IT load retained at planned stage. It is not installed, energized, operational, current demand, grid capacity, generation, consumption, or annual energy. | evidence |
Source and location review
- Status source
- Akashi reports September 24 technical press tour of its Astana campus construction evidence row
Akashi Data Center · published 2026-09-24 · Company disclosure - Locator
- Reviewed site locator · Official source · same_parcel_infrastructure_reference_point evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 33 days before the data update on 2026-10-27
Location details
- Coordinates
- 51.20677, 71.45771
- Geometry licence
- no-license-stated-for-compact-factual-extraction
- Use scope
- Reviewed site locator
- Scope class
- same_parcel_infrastructure_reference_point
- Authority
- Official source
- Source entity
- Project
- Method
- authoritative_site_plan
- Derivation
- direct_geometry
- Precision scope
- Official site-plan point for a substation within the same data-centre parcel; 500 metre stated uncertainty and not a hall footprint.
- Horizontal uncertainty
- 500 m
- Geometry evidence
- ff1fe928
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| About Akashi Archived copy | Akashi Data Center Company disclosure | Operating model, Operator claim | not stated | all-rights-reserved | Akashi Data Center | 01e105af2a09a3e96987bccde8d7c7cc68cf6add95ab48c6d9286e4dca5ce774Retained source material; see source provenance | |
| Akashi 110/10 kV substation center within Astana cadastral parcel 21-324-059-695 Archived copy | Unified Environmental Portal of Kazakhstan Government record | Geometry | not stated | no-license-stated-for-compact-factual-extraction | Unified Environmental Portal of Kazakhstan | de22fb8e3444bb0190c8eb91990a4537321729b294258f2729f79aaba4c2ffa7Retained source material; see source provenance | |
| Akashi reports September 24 technical press tour of its Astana campus construction Archived copy | Akashi Data Center Company disclosure | Physical status | all-rights-reserved | Akashi Data Center | a1da2237d980c7adb91eadeb520e28fe66b2ccaee75998ba8104766adf51b1fbRetained source material; see source provenance | ||
| Construction progress Archived copy | Akashi Data Center Company disclosure | Physical status, Critical IT load observation | not stated | all-rights-reserved | Akashi Data Center | a2f3f281a66151c90b6a6ea0a089e9cab9361b586f60cde06febb1d49fee6b9fRetained source material; see source provenance |
Cite this site
Kyars, K. (2026). Akashi Astana Data Center Campus [site vcc-site-cc8bbdad8c252d9ba4e2]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc8bbdad8c252d9ba4e2/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction