WBS Power Baltic Data Center Campus, Lublewo

Announced

Poland · 1 project · Last reported

Summary

Hyperscale campus proposed by WBS Power at Lublewo in Choczewo municipality, Pomerania, near the planned Lubiatowo-Kopalino nuclear power plant site. Announced in March 2026, it targets 3.2 GW in four 800 MW phases aimed at AI, HPC and cloud customers. WBS Power says it has grid connection conditions for the full 3.2 GW at a site next to one of Poland's largest substations, with power from conventional sources, renewables and battery storage, and nuclear in the longer term. Preparation of all phases is due by the end of 2027 and the first data center around 2028-2029. No investors, tenants or permits were named.

Source record as of 2026-03-24 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 54.75972, 17.94528 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

WBS Power Baltic Data Center Campus, Lublewo

Announced last observed as of · Reported status

Location: Lublewo (Choczewo municipality), Wejherowo County, Pomeranian Voivodeship, PL. The press release and Gramwzielone name the site as Lublewo in Choczewo municipality; neither uses the official name Lublewo Lęborskie. Wikipedia lists Lublewo Lęborskie as the only village called Lublewo in Gmina Choczewo (the other similar name is Lublewko), so its village coordinates are used, at locality precision. County is from Wikipedia. No cited source gives site coordinates. WBS Power (via PR Newswire); Gramwzielone.pl; Wikipedia; Wikipedia

Use: Ai unspecified, Hpc, Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity3,200 MWPlanned · Campus · Unspecified2026-03-24Target capacity; scope not stated.WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl
Power capacity800 MWPlanned · Phase · Unspecified · Each of four phases2026-03-24WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl
Power capacity3,200 MWPermitted · Campus · Grid connection2026-03-24WBS Power says it has secured grid connection conditions for the full capacity; the grid operator is not named.WBS Power (via PR Newswire); World Nuclear News

Companies and organizations

NameRoleNotesSources
WBS PowerDeveloperWBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl

Timeline

DateEventActual or plannedNotesSources
2026-03-17AnnouncedActualEarliest report found; WBS Power's English press release followed on 24 March 2026.Gramwzielone.pl
2027OtherPlannedPreparatory work for all four phases expected to be completed by the end of 2027.WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl
2028First operationalPlannedFirst data center targeted around 2028-2029.WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl

Power supply

TypeDescriptionSources
GridGrid connection conditions secured for 3.2 GW at a site next to one of Poland's largest substations.WBS Power (via PR Newswire); Gramwzielone.pl
Battery storageBattery energy storage integration is planned.WBS Power (via PR Newswire); World Nuclear News
OtherWBS Power says power will come from conventional sources supplemented by renewables; specific generation contracts are not described.WBS Power (via PR Newswire); Gramwzielone.pl
NuclearNuclear power is cited only as a longer-term source; the Westinghouse AP1000 plant planned at Lubiatowo-Kopalino in Choczewo municipality targets commercial operation in 2033, with no supply agreement reported.World Nuclear News; Gramwzielone.pl

No investment figure, land area, investor or tenant was disclosed in the sources opened, and no zoning or environmental permit decision was found. The 3.2 GW figure is the developer's target. No update after March 2026 was found.

Sources for these details
Companies
  • Developer: WBS Power (unknown scope) evidence
  • Developer: WBS Power (unknown scope) evidence
  • Developer: WBS Power (unknown scope) evidence
Source and location review
Status source
WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus evidence row
WBS Power (via PR Newswire) · published 2026-03-24 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 217 days before the data update on 2026-10-27

Location details
Coordinates
54.75972, 17.94528
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
The press release and Gramwzielone name the site as Lublewo in Choczewo municipality; neither uses the official name Lublewo Lęborskie. Wikipedia lists Lublewo Lęborskie as the only village called Lublewo in Gmina Choczewo (the other similar name is Lublewko), so its village coordinates are used, at locality precision. County is from Wikipedia. No cited source gives site coordinates.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
c8683395

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for WBS Power Baltic Data Center Campus, Lublewo
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Data centre to be built near planned Polish nuclear power plant
Archived copy
World Nuclear News
Trade publication
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Power Source: Battery Storage, Power Source: Nuclear, Role: Developersource-terms-not-recordedWorld Nuclear News19470e15ed7cdf217310687016a7c89907517fb518fc6b05d00b477700d0087b
Factual source record; not the publisher page
Deweloper z rynku OZE postawi ogromne centrum danych na Pomorzu
Archived copy
Gramwzielone.pl
Trade publication
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Milestone: Other, Power Source: Grid, Power Source: Nuclear, Power Source: Other, Role: Developersource-terms-not-recordedGramwzielone.plb53509de06da33810cf2bf530a67779bb0a7117350ea0442d922c695b98cc67b
Factual source record; not the publisher page
Gmina Choczewo
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediafe004e733037de64c09e7e88c6448adb443d2f560bb654d88948261d76705519
Factual source record; not the publisher page
Lublewo Lęborskie
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia38cc140dc731fe82d53e8734c52006f250f6d7451565440d5556025953ee9e72
Factual source record; not the publisher page
WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus
Archived copy
WBS Power (via PR Newswire)
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Power Source: Battery Storage, Power Source: Grid, Power Source: Other, Role: Developersource-terms-not-recordedWBS Power (via PR Newswire)411a040ccb7e236926acb8fc83aabb867578d6ced965035ddbb8a74aa77f663a
Factual source record; not the publisher page