WBS Power Baltic Data Center Campus, Lublewo
Announced
Poland · 1 project · Last reported
Summary
Hyperscale campus proposed by WBS Power at Lublewo in Choczewo municipality, Pomerania, near the planned Lubiatowo-Kopalino nuclear power plant site. Announced in March 2026, it targets 3.2 GW in four 800 MW phases aimed at AI, HPC and cloud customers. WBS Power says it has grid connection conditions for the full 3.2 GW at a site next to one of Poland's largest substations, with power from conventional sources, renewables and battery storage, and nuclear in the longer term. Preparation of all phases is due by the end of 2027 and the first data center around 2028-2029. No investors, tenants or permits were named.
Source record as of 2026-03-24 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 54.75972, 17.94528 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
WBS Power Baltic Data Center Campus, Lublewo
Announced last observed as of · Reported status
Location: Lublewo (Choczewo municipality), Wejherowo County, Pomeranian Voivodeship, PL. The press release and Gramwzielone name the site as Lublewo in Choczewo municipality; neither uses the official name Lublewo Lęborskie. Wikipedia lists Lublewo Lęborskie as the only village called Lublewo in Gmina Choczewo (the other similar name is Lublewko), so its village coordinates are used, at locality precision. County is from Wikipedia. No cited source gives site coordinates. WBS Power (via PR Newswire); Gramwzielone.pl; Wikipedia; Wikipedia
Use: Ai unspecified, Hpc, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 3,200 MW | Planned · Campus · Unspecified | 2026-03-24 | Target capacity; scope not stated. | WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl |
| Power capacity | 800 MW | Planned · Phase · Unspecified · Each of four phases | 2026-03-24 | WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl | |
| Power capacity | 3,200 MW | Permitted · Campus · Grid connection | 2026-03-24 | WBS Power says it has secured grid connection conditions for the full capacity; the grid operator is not named. | WBS Power (via PR Newswire); World Nuclear News |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| WBS Power | Developer | WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-03-17 | Announced | Actual | Earliest report found; WBS Power's English press release followed on 24 March 2026. | Gramwzielone.pl |
| 2027 | Other | Planned | Preparatory work for all four phases expected to be completed by the end of 2027. | WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl |
| 2028 | First operational | Planned | First data center targeted around 2028-2029. | WBS Power (via PR Newswire); World Nuclear News; Gramwzielone.pl |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Grid connection conditions secured for 3.2 GW at a site next to one of Poland's largest substations. | WBS Power (via PR Newswire); Gramwzielone.pl |
| Battery storage | Battery energy storage integration is planned. | WBS Power (via PR Newswire); World Nuclear News |
| Other | WBS Power says power will come from conventional sources supplemented by renewables; specific generation contracts are not described. | WBS Power (via PR Newswire); Gramwzielone.pl |
| Nuclear | Nuclear power is cited only as a longer-term source; the Westinghouse AP1000 plant planned at Lubiatowo-Kopalino in Choczewo municipality targets commercial operation in 2033, with no supply agreement reported. | World Nuclear News; Gramwzielone.pl |
No investment figure, land area, investor or tenant was disclosed in the sources opened, and no zoning or environmental permit decision was found. The 3.2 GW figure is the developer's target. No update after March 2026 was found.
Sources for these details
- WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus — WBS Power (via PR Newswire); 2026-03-24
- Data centre to be built near planned Polish nuclear power plant — World Nuclear News; 2026-03-24
- Deweloper z rynku OZE postawi ogromne centrum danych na Pomorzu — Gramwzielone.pl; 2026-03-17
- Lublewo Lęborskie — Wikipedia; publication date not stated
- Gmina Choczewo — Wikipedia; publication date not stated · Archived source
- Companies
Source and location review
- Status source
- WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus evidence row
WBS Power (via PR Newswire) · published 2026-03-24 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 217 days before the data update on 2026-10-27
Location details
- Coordinates
- 54.75972, 17.94528
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- The press release and Gramwzielone name the site as Lublewo in Choczewo municipality; neither uses the official name Lublewo Lęborskie. Wikipedia lists Lublewo Lęborskie as the only village called Lublewo in Gmina Choczewo (the other similar name is Lublewko), so its village coordinates are used, at locality precision. County is from Wikipedia. No cited source gives site coordinates.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- c8683395
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Data centre to be built near planned Polish nuclear power plant Archived copy | World Nuclear News Trade publication | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Power Source: Battery Storage, Power Source: Nuclear, Role: Developer | source-terms-not-recorded | World Nuclear News | 19470e15ed7cdf217310687016a7c89907517fb518fc6b05d00b477700d0087bFactual source record; not the publisher page | ||
| Deweloper z rynku OZE postawi ogromne centrum danych na Pomorzu Archived copy | Gramwzielone.pl Trade publication | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Milestone: Other, Power Source: Grid, Power Source: Nuclear, Power Source: Other, Role: Developer | source-terms-not-recorded | Gramwzielone.pl | b53509de06da33810cf2bf530a67779bb0a7117350ea0442d922c695b98cc67bFactual source record; not the publisher page | ||
| Gmina Choczewo Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | fe004e733037de64c09e7e88c6448adb443d2f560bb654d88948261d76705519Factual source record; not the publisher page | |
| Lublewo Lęborskie Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 38cc140dc731fe82d53e8734c52006f250f6d7451565440d5556025953ee9e72Factual source record; not the publisher page | |
| WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus Archived copy | WBS Power (via PR Newswire) Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Power Source: Battery Storage, Power Source: Grid, Power Source: Other, Role: Developer | source-terms-not-recorded | WBS Power (via PR Newswire) | 411a040ccb7e236926acb8fc83aabb867578d6ced965035ddbb8a74aa77f663aFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). WBS Power Baltic Data Center Campus, Lublewo [site vcc-site-cd3c4380161bc1c0389f]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cd3c4380161bc1c0389f/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction