AWS Walqa Data Center Campus

Under construction

Spain · 1 project · Last reported

Summary

The regional government identifies construction of an Amazon Web Services data center at Parque Tecnológico Walqa. evidence

Government of Aragón · published 2026-06-25

Location

The interactive map needs JavaScript. Display anchor: 42.11381, -0.45644 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Project locator; building footprints are not mapped.

Projects (1)

AWS Walqa Current Data Center Build

Under construction last observed as of · Authoritative construction start

Source and location review
Status source
El parque tecnológico Walqa refuerza su crecimiento con la nueva conexión directa con Huesca evidence row
Government of Aragón · published 2026-06-25 · Government record
Locator
Project locator · Official source · official_source_reported_project_reference_point evidence
Source checks

Blind imagery review: rejected, identity link not public tracked_blind_reject_locally_unsealed_identity_no_construction_claim
A blind satellite-image review rejected the imagery as support, and the link between the reviewed images and this project exists only in unpublished local files. No construction, completion or progress claim is made from imagery. · no independent imagery verification

Status age at review: 124 days before the data update on 2026-10-27

Location details
Coordinates
42.11381, -0.45644
Geometry licence
rights-status-not-established
Use scope
Project locator
Scope class
official_source_reported_project_reference_point
Authority
Official source
Source entity
Project
Method
official_aragon_piga_project_report_dms_coordinate_to_point
Derivation
direct_geometry
Precision scope
Official project-report point used only to locate the proposed/current Walqa build. The reported 0.01-arc-second display precision is preserved but is not converted into survey accuracy.
Horizontal uncertainty
Not reported

The report prints DMS precision but does not state datum, surveyed reference feature, collection method, or horizontal accuracy.

Geometry evidence
a66352ad

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for AWS Walqa Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
El parque tecnológico Walqa refuerza su crecimiento con la nueva conexión directa con Huesca
Archived copy
Government of Aragón
Government record
Physical statusall-rights-reservedGovernment of Aragón87a5b4b3b4809f9b4d2bf851095bd2f07aff3cb5551b3abf004653388c6876be
Retained source material; see source provenance
Plan de Interés General de Aragón — Expansión Región AWS en Aragón — Tomo I: Memoria justificativa
Archived copy
Government of Aragón
Government planning record
Geometrynot statedrights-status-not-establishedGovernment of Aragón / Amazon Data Services Spain, S.L.dd1d3a349c4704b8896ab14dfa20be0be08fa9b838261173691891ae2be0c27f
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). AWS Walqa Data Center Campus [site vcc-site-d6e7826cfaef008088a0]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6e7826cfaef008088a0/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction