Sify Chennai 02 data center campus, Siruseri

Partially operational

India · 1 project · Last reported

Summary

Sify Infinit Spaces' hyperscale and AI-ready campus at Siruseri, Chennai, is planned as three towers over a shared basement, with an on-site subsea cable landing station and a 230 kV GIS substation. Tamil Nadu's chief minister inaugurated the first tower in April 2025, when Sify said the campus would eventually reach 130 MW and that it and its partners planned to invest INR 10,000 crore over five years. Sify's October 2025 prospectus reported 25.92 MW of built IT capacity in Tower B, of which 4.32 MW was installed, planned another 26 MW there by the year to March 2028, and said work on towers A and C had not begun.

Source record as of 2025-10-16 · Details and sources

Sify's Chennai data-centre page, in its version of 29 September 2026, presents Chennai 02 in Siruseri as Sify's hyperscale campus 'with 25.92 MW IT Power' that 'onboards multiple telecom service providers, Internet Exchanges for robust telecom services to customers and enables enterprises to run their critical applications seamlessly'. This is a newer operator observation that the campus is in service. It does not say how much of the planned campus is built or whether further buildings remain to be developed, so the existing partially operational code is kept rather than upgraded to full operation; 25.92 MW is a stated campus figure, not measured load. evidence

Sify Technologies Limited · published 2026-09-29

Location

The interactive map needs JavaScript. Display anchor: 12.83500, 80.20000 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Sify Chennai 02 data center campus, Siruseri

Partially operational last observed as of · Authoritative status update

This record reports partially operational as of 2025-10-16. Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)

Location: Siruseri, Chengalpattu district, Tamil Nadu, IN. Sources name Siruseri, Chennai, without an address. The point is the Siruseri coordinate from its Wikipedia article (which also gives the district), so it marks the locality rather than the site. W.Media; Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India); Wikipedia

Use: Colocation, Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacitymore than 130 MWPlanned · Campus · It load2025-04-30Eventual IT power of the three-tower campus as given on Sify's website (130+ MW). W.Media (s2) reported an eventual capacity of 130 MW without stating the scope.Sify Technologies
Power capacity4.32 MWOperational · Phase · It load · Tower B (installed capacity)2025-06-30Installed IT capacity of Tower B at 30 June 2025; none was installed at 31 March 2025. The prospectus defines built capacity as the maximum IT load a facility is engineered to support on its present design, and installed capacity as the part that is equipped, powered and commissioned.Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
Power capacity25.92 MWPlanned · Phase · It load · Tower B (built capacity)2025-06-30Built IT capacity of Tower B at 30 June 2025. The prospectus defines built capacity as the maximum IT load a facility is engineered to support on its present design, and installed capacity as the part that is equipped, powered and commissioned. Only 4.32 MW was installed, so this figure is recorded as planned rather than operational.Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
Power capacity26 MWPlanned · Phase · It load · Completion of Tower B (additional capacity)2025-10-16Additional built IT capacity planned by the financial year ending March 2028.Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
Investment100,000,000,000 INRAnnounced · Campus2025-04-30INR 10,000 crore planned over five years by Sify together with partners (hyperscalers, enterprises and public sector companies), up from an original INR 2,500 crore commitment.W.Media
Investment18,820,000,000 INRAnnounced · Phase · Initial phase2025-04-30W.Media reports that the first phase was developed at a cost of INR 1,882 crore; how this relates to the prospectus estimate for Tower B is not explained.W.Media
Investment12,020,070,000 INRAnnounced · Phase · Tower B2025-10-16Estimated cost of Tower B excluding land, certified by an independent chartered engineer; about INR 4.41 billion had been spent by 31 August 2025.Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
Buildings3 countPlanned · Campus2025-10-16Sify Technologies; W.Media; Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)

Companies and organizations

Timeline

DateEventActual or plannedNotesSources
2025-04First operationalActualInauguration of the first tower by Tamil Nadu's chief minister, reported on 2025-04-30 without an event date. The prospectus shows no installed capacity at 31 March 2025 and 4.32 MW at 30 June 2025.W.Media; Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
2028OtherPlannedCompletion of Tower B, adding 26 MW of built IT capacity, targeted by the financial year ending March 2028; towers A and C had not started.Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)

Power supply

TypeDescriptionSources
GridOn-site 230 kV GIS substation.Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
OtherAbout 60% of power came from renewable sources in April 2025, with a stated aim of 80-90% and eventually fully renewable supply; the generation types were not given.W.Media

Sify's undated website (s1) still describes the Siruseri campus as becoming operational soon, which is older than the prospectus position; the status rests on the October 2025 prospectus, and no 2026 campus-level update was found. The prospectus places Tower B on a 4.90-acre plot in the SIPCOT Industrial Park, Siruseri, leased from SIPCOT. The INR 10,000 crore figure includes partners' spending and is a five-year plan, not Sify's own committed budget. Tamil Nadu's chief minister inaugurated the first tower; the state has no other stated role, so it is not listed as a party. Siruseri coordinates and the district come from Wikipedia (s4), used only for the location.

Sources for these details
Companies
  • Developer: Sify Infinit Spaces Limited (unknown scope) evidence
  • Developer: Sify Infinit Spaces Limited (unknown scope) evidence
  • Operator: Sify Infinit Spaces Limited (unknown scope) evidence
Source and location review
Status source
Sify Data Center in Chennai location page (Chennai 01 Tidel Park and Chennai 02 Siruseri) evidence row
Sify Technologies Limited · published 2026-09-29 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 28 days before the data update on 2026-10-27

Location details
Coordinates
12.83500, 80.20000
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources name Siruseri, Chennai, without an address. The point is the Siruseri coordinate from its Wikipedia article (which also gives the district), so it marks the locality rather than the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
ac5b7466

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Sify Chennai 02 data center campus, Siruseri
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Data centre
Archived copy
Sify Technologies
Company disclosure
Imported: Record, Metric: Buildings, Metric: Power Capacitynot statedsource-terms-not-recordedSify Technologiese296640cfae785b3ae80252263c89d4abc48ddc1e1c61f7334baa15a27f4c7f8
Factual source record; not the publisher page
Sify and partners to invest Rs 10,000 crores in Chennai DC over next five years: MP Vijaykumar
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Milestone: First Operational, Power Source: Other, Role: Developersource-terms-not-recordedW.Mediae70647ca6713d7c4ed371b17b7aa0dc100cbd32e690875ed162bfb2ded21e025
Factual source record; not the publisher page
Sify Data Center in Chennai location page (Chennai 01 Tidel Park and Chennai 02 Siruseri)
Archived copy
Sify Technologies Limited
Company disclosure
Physical statusall-rights-reservedSify Technologies Limited87e740541f9a5c585dcd769a2e996130a8f8df621e569f3c3a337fed2565a21f
Retained source material; see source provenance
Sify Infinit Spaces Limited: Draft Red Herring Prospectus (filing version)
Archived copy
Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)
Regulatory filing
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Power Source: Grid, Role: Developer, Operator claimsource-terms-not-recordedSify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India)bd3a755141c43af76a7d04e316e4116a222c4cdc47b20c0e8035f7b079ae2957
Factual source record; not the publisher page
Siruseri
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia26aaac04706363efe49136d2fc610a17284c05f7b520f4fbe031911c7c5f18d2
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Sify Chennai 02 data center campus, Siruseri [site vcc-site-dc7beeb061c0e039f4cf]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dc7beeb061c0e039f4cf/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction