atNorth DEN02 Varde mega site

Announced

Denmark · 1 project · Last reported

Summary

atNorth plans its second Danish campus, DEN02, on a greenfield site of about 171-175 hectares at Krageris north of Ølgod in Varde Municipality, western Denmark. The company lists 500 MW of campus power with an initial 250 MW. Local press in November 2025 put the budget for the data center together with about 40 hectares of greenhouses to be developed by Wa3rm at about DKK 37bn, with a first stage due to start operating at the end of 2027 and a second stage in 2029, while the location still needed approval. Surplus heat is to feed Ølgod's district heating, and in August 2026 atNorth named Selected Group to use it for greenhouses next to the campus.

Source record as of 2026-08-11 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 55.80580, 8.61810 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

atNorth DEN02 Varde mega site

Announced last observed as of · Reported status

Location: Ølgod, Varde Municipality, Region of Southern Denmark, DK. Local press places the site at Krageris, north and northeast of Ølgod; Krageris was not found in Nominatim, so the Ølgod village centroid is used. JydskeVestkysten (republished by atNorth); JydskeVestkysten (republished by atNorth)

Use: Colocation

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity500 MWPlanned · Campus · Unspecified2026Campus power capacity on atNorth's undated site page, which also cites scalability potential for several hundred additional MW.atNorth
Power capacity250 MWPlanned · Phase · Unspecified · Initial capacity2026atNorth
Power capacityabout 250 MWPlanned · Campus · Unspecified2025-11-13November 2025 local press described the planned data center at about 250 MW, matching atNorth's initial-capacity figure rather than its 500 MW campus figure.JydskeVestkysten (republished by atNorth)
Investmentabout 37,000,000,000 DKKReported · Campus2025-11-20Local press figure for the total budget, which includes about 40 hectares of greenhouses by Wa3rm, not only the data center.JydskeVestkysten (republished by atNorth)
Land area171 hectaresReported · Campus2026atNorth
Land area174 hectaresReported · Campus2025-11-13Site size given in the November 13 local press article.JydskeVestkysten (republished by atNorth)
Land area175 hectaresReported · Campus2025-11-20Total project area including about 40 hectares of greenhouses, per the November 20 local press article.JydskeVestkysten (republished by atNorth)
Floor area250,000 sq_mPlanned · Campus2025-11-20JydskeVestkysten (republished by atNorth)
Jobs permanent100 countPlanned · Campus2025-11-20Expected data center employees only; the greenhouses are expected to employ 400 more.JydskeVestkysten (republished by atNorth)

Companies and organizations

NameRoleNotesSources
atNorthDeveloperatNorth; JydskeVestkysten (republished by atNorth)

Timeline

DateEventActual or plannedNotesSources
2025-11-20OtherActualReported to be in the planning phase, with the proposed location still requiring approval by the authorities.JydskeVestkysten (republished by atNorth)
2025-11-13OtherActualPlan reported for Ølgod Tekniske Værker to take the data center's surplus heat into the local district heating network via a pipeline of about 3.5 km; atNorth describes a letter of intent.atNorth; JydskeVestkysten (republished by atNorth)
2026-08-11OtherActualatNorth named Selected Group to use surplus heat from DEN02 for greenhouses, whose first phase is expected in Q3 2028.atNorth
2027First operationalPlannedStage 1 (data center and two greenhouses) expected to start operating at the end of 2027.JydskeVestkysten (republished by atNorth)
2029OtherPlannedStage 2 expected to be operational in 2029.JydskeVestkysten (republished by atNorth)

Power supply

TypeDescriptionSources
Diesel backupLocal press reports 60 to 200 chimneys, each 25 metres high, for backup power systems; atNorth says generators are backup only with fuel for at least 48 hours.atNorth; JydskeVestkysten (republished by atNorth)
Sources for these details
Companies
  • Developer: atNorth (unknown scope) evidence
  • Developer: atNorth (unknown scope) evidence
Source and location review
Status source
Varde mega site (DEN02) evidence row
atNorth · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 77 days before the data update on 2026-10-27

Location details
Coordinates
55.80580, 8.61810
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Local press places the site at Krageris, north and northeast of Ølgod; Krageris was not found in Nominatim, so the Ølgod village centroid is used.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
15245591

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for atNorth DEN02 Varde mega site
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
atNorth data center to supply district heating
Archived copy
JydskeVestkysten (republished by atNorth)
News
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Othersource-terms-not-recordedJydskeVestkysten (republished by atNorth)e33d482d1ad00abab43603bfa36b7665f2023809fbfeaeab4df71f44ee5468aa
Factual source record; not the publisher page
Local firms prepare for major project in Varde
Archived copy
JydskeVestkysten (republished by atNorth)
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Milestone: First Operational, Milestone: Other, Power Source: Diesel Backup, Role: Developersource-terms-not-recordedJydskeVestkysten (republished by atNorth)7d88426cf005342c03d21161034153fe1835a28ed820b484463cb64b9df18697
Factual source record; not the publisher page
Selected Group will utilize surplus heat from atNorth's DEN02 data center
Archived copy
atNorth
Company disclosure
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedatNorth6f9d01654adbdfff132df859871c09776439486b5ea43e3b43f72876adc4fc52
Factual source record; not the publisher page
Varde mega site (DEN02)
Archived copy
atNorth
Company disclosure
Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Diesel Backup, Role: Developernot statedsource-terms-not-recordedatNorth48e7a5a43778bfa4cbbb2687d4bd8eb285dcb7ed3ccdaad2741cf8fd7f5faef2
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). atNorth DEN02 Varde mega site [site vcc-site-e5d89f88732b72ed1705]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5d89f88732b72ed1705/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction