Proposed first Italian campus of Blackstone-owned QTS Data Centers on the former IBM industrial site at Velasca in Vimercate (Monza and Brianza). QTS's page calls it a proposed development of up to EUR 2.3 billion. At a June 2026 open day QTS presented three buildings and an on-site substation linked to a planned Terna station; local press reported 156 MW (two 60 MW buildings and one of 36 MW), while other reports give about 220 MW or 300 MW. In July 2026 QTS awaited the national environmental assessment before a building permit, aiming to prepare the site by end-2026 and open the first building in the second half of 2028.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 45.61700, 9.36700 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
QTS Vimercate data center campus
Announced last observed as of · Reported status
Location: Vimercate, Monza e Brianza, Lombardia, IT. Town coordinates from the Vimercate Wikipedia article. Sources place the site on the former IBM area at Velasca, a frazione of Vimercate, near the boundary with Burago; the site is not mapped in the local OpenStreetMap layer. QTS Data Centers; Prima Monza; Wikipedia
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Investment | up to 2,300,000,000 EUR | Announced · Campus | 2026-10-09 | Inward investment figure on QTS's undated campus page, read on 2026-10-09. | QTS Data Centers; Cloudnews.tech |
| Power capacity | 156 MW | Planned · Campus · Unspecified | 2026-07-12 | Reported after QTS's open day as two buildings of 60 MW and one of 36 MW. | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI) |
| Power capacity | about 220 MW | Planned · Campus · Unspecified | 2026-06-24 | Undated trade article written after the 24 June 2026 presentation; it describes three buildings. | Cloudnews.tech |
| Power capacity | 300 MW | Planned · Campus · Unspecified | 2026-07-11 | Il Giorno reports 300 MW of electrical power in its account of residents' objections. | Il Giorno |
| Land area | 19 hectares | Reported · Campus | 2026-07-12 | QTS's page and Il Giorno give a 277,800 square metre site instead. | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI) |
| Floor area | about 100,000 sq_m | Planned · Campus | 2026-07-12 | Buildable area reported as a little under 100,000 square metres. | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI) |
| Buildings | 3 count | Planned · Campus | 2026-07-12 | Data center buildings; annex buildings and a substation are also planned. | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI); Il Giorno |
| Jobs construction | about 600 count | Planned · Campus | 2026-07-12 | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI) | |
| Jobs permanent | about 100 count | Planned · Campus | 2026-07-12 | Prima Monza; Il Giorno |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| QTS Data Centers | Developer | QTS Data Centers; Prima Monza; Il Giorno | |
| Kryalos SGR | Developer | Il Giorno names Kryalos alongside QTS; Cloudnews says Blackstone holds a stake in Kryalos and that it is linked to the project, without describing its role. | Il Giorno; Cloudnews.tech |
| Terna | Utility | Is to build a new electrical station near the Burago boundary that would serve this and two other planned Vimercate data centers. | Prima Monza; Cloudnews.tech |
| Comune di Vimercate | Government | Expects about EUR 5 million in development charges plus refurbishment of the Oreno sports ground; objections were also lodged on its planning-code revision. | Prima Monza; Il Giorno |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-07 | Other | Actual | QTS's executive vice-president said the approval process began in July of the previous year. | Prima Monza |
| 2026-06-24 | Other | Actual | Public open day at which QTS presented the project to residents, businesses and local officials. | Giornale di Vimercate (press clipping hosted by CIAI); Cloudnews.tech |
| 2026 | Construction started | Planned | Site preparation planned by the end of 2026, after the environmental assessment and building permit. | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI) |
| 2028-H2 | First operational | Planned | First building expected in the second half of 2028; the report places the formal opening between then and 2029. | Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI) |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | On-site substation linked by underground cable to a new station Terna is to build near the Burago boundary. | Prima Monza |
| Other | 133 emergency generators are planned (fuel not stated), which Il Giorno puts at about 1,000 MW thermal in total. | Il Giorno; Cloudnews.tech |
Capacity figures conflict: 156 MW (Prima Monza, Giornale di Vimercate), about 220 MW (Cloudnews, citing Il Cittadino) and 300 MW (Il Giorno); site size is 19 hectares in local press but 277,800 square metres on QTS's undated page, which calls the development proposed (status_as_of is the access date). Giornale di Vimercate was read as a PDF clipping hosted by CIAI, a charity QTS sponsors; Prima Monza's own site carries the same text. A sponsored MBNews piece, also hosted by CIAI, said old sheds were being demolished; this is unconfirmed and not recorded. Opponents asked for heat recovery, generator-test limits and buried power lines. No ministry environmental decision was found.
Sources for these details
- Vimercate — QTS Data Centers; publication date not stated
- Il primo data center della città si svela — Prima Monza; 2026-07-12
- Su il sipario sul nuovo Data center — Giornale di Vimercate (press clipping hosted by CIAI); 2026-06-30
- Il Campus Data Center fa paura: "Diciamo no al deserto di cemento" — Il Giorno; 2026-07-11
- QTS prepares a 220 MW campus near Milan and accelerates its expansion — Cloudnews.tech; publication date not stated
- Vimercate — Wikipedia; publication date not stated
- Companies
- Developer: QTS Data Centers (unknown scope) evidence
- Developer: QTS Data Centers (unknown scope) evidence
- Developer: QTS Data Centers (unknown scope) evidence
- Developer: Kryalos SGR (unknown scope) evidence
- Developer: Kryalos SGR (unknown scope) evidence
- Utility: Terna (unknown scope) evidence
- Utility: Terna (unknown scope) evidence
- Government: Comune di Vimercate (unknown scope) evidence
- Government: Comune di Vimercate (unknown scope) evidence
Source and location review
- Status source
- Vimercate evidence row
QTS Data Centers · publication date not stated · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 45.61700, 9.36700
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Town coordinates from the Vimercate Wikipedia article. Sources place the site on the former IBM area at Velasca, a frazione of Vimercate, near the boundary with Burago; the site is not mapped in the local OpenStreetMap layer.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- e4ddd93d
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Il Campus Data Center fa paura: "Diciamo no al deserto di cemento" Archived copy | Il Giorno News | Imported: Record, Imported: Status, Metric: Buildings, Metric: Jobs Permanent, Metric: Power Capacity, Power Source: Other, Role: Developer, Role: Government | source-terms-not-recorded | Il Giorno | 93e5d9b5b149cd079b91eda6e834f196bde53003e6eea16cc3178ef24b3ccaa6Factual source record; not the publisher page | ||
| Il primo data center della città si svela Archived copy | Prima Monza News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Utility | source-terms-not-recorded | Prima Monza | 6b037ce29aea112da6d7a6265ba3551b06d551d4923942dfeeee65e1c11eec5fFactual source record; not the publisher page | ||
| QTS prepares a 220 MW campus near Milan and accelerates its expansion Archived copy | Cloudnews.tech Trade publication | Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Other, Power Source: Other, Role: Developer, Role: Utility | not stated | source-terms-not-recorded | Cloudnews.tech | af74a76d5f57a360e82e965e3e900dc54ec384d2fa21d81d2aeb16d6ef68aa2cFactual source record; not the publisher page | |
| Su il sipario sul nuovo Data center Archived copy | Giornale di Vimercate (press clipping hosted by CIAI) News | Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other | source-terms-not-recorded | Giornale di Vimercate (press clipping hosted by CIAI) | cc54c7980902165ebaa1396b86acdb0e03634749d09c0b57cfacab8237d8990eFactual source record; not the publisher page | ||
| Vimercate Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 1c459b9ac92b08261d61200b1849a3f7d70b872f751c4e56c4fecbdfece6b98bFactual source record; not the publisher page | |
| Vimercate Archived copy | QTS Data Centers Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Role: Developer | not stated | source-terms-not-recorded | QTS Data Centers | 2719435047d84f9059062776d9be3aa9f0a4dd88fab54013b3d10998cac5063fFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). QTS Vimercate data center campus [site vcc-site-e6669b76221d6e79fd89]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6669b76221d6e79fd89/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction