QTS Vimercate data center campus

Announced

Italy · 1 project · Last reported

Summary

Proposed first Italian campus of Blackstone-owned QTS Data Centers on the former IBM industrial site at Velasca in Vimercate (Monza and Brianza). QTS's page calls it a proposed development of up to EUR 2.3 billion. At a June 2026 open day QTS presented three buildings and an on-site substation linked to a planned Terna station; local press reported 156 MW (two 60 MW buildings and one of 36 MW), while other reports give about 220 MW or 300 MW. In July 2026 QTS awaited the national environmental assessment before a building permit, aiming to prepare the site by end-2026 and open the first building in the second half of 2028.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 45.61700, 9.36700 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

QTS Vimercate data center campus

Announced last observed as of · Reported status

Location: Vimercate, Monza e Brianza, Lombardia, IT. Town coordinates from the Vimercate Wikipedia article. Sources place the site on the former IBM area at Velasca, a frazione of Vimercate, near the boundary with Burago; the site is not mapped in the local OpenStreetMap layer. QTS Data Centers; Prima Monza; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentup to 2,300,000,000 EURAnnounced · Campus2026-10-09Inward investment figure on QTS's undated campus page, read on 2026-10-09.QTS Data Centers; Cloudnews.tech
Power capacity156 MWPlanned · Campus · Unspecified2026-07-12Reported after QTS's open day as two buildings of 60 MW and one of 36 MW.Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI)
Power capacityabout 220 MWPlanned · Campus · Unspecified2026-06-24Undated trade article written after the 24 June 2026 presentation; it describes three buildings.Cloudnews.tech
Power capacity300 MWPlanned · Campus · Unspecified2026-07-11Il Giorno reports 300 MW of electrical power in its account of residents' objections.Il Giorno
Land area19 hectaresReported · Campus2026-07-12QTS's page and Il Giorno give a 277,800 square metre site instead.Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI)
Floor areaabout 100,000 sq_mPlanned · Campus2026-07-12Buildable area reported as a little under 100,000 square metres.Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI)
Buildings3 countPlanned · Campus2026-07-12Data center buildings; annex buildings and a substation are also planned.Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI); Il Giorno
Jobs constructionabout 600 countPlanned · Campus2026-07-12Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI)
Jobs permanentabout 100 countPlanned · Campus2026-07-12Prima Monza; Il Giorno

Companies and organizations

NameRoleNotesSources
QTS Data CentersDeveloperQTS Data Centers; Prima Monza; Il Giorno
Kryalos SGRDeveloperIl Giorno names Kryalos alongside QTS; Cloudnews says Blackstone holds a stake in Kryalos and that it is linked to the project, without describing its role.Il Giorno; Cloudnews.tech
TernaUtilityIs to build a new electrical station near the Burago boundary that would serve this and two other planned Vimercate data centers.Prima Monza; Cloudnews.tech
Comune di VimercateGovernmentExpects about EUR 5 million in development charges plus refurbishment of the Oreno sports ground; objections were also lodged on its planning-code revision.Prima Monza; Il Giorno

Timeline

DateEventActual or plannedNotesSources
2025-07OtherActualQTS's executive vice-president said the approval process began in July of the previous year.Prima Monza
2026-06-24OtherActualPublic open day at which QTS presented the project to residents, businesses and local officials.Giornale di Vimercate (press clipping hosted by CIAI); Cloudnews.tech
2026Construction startedPlannedSite preparation planned by the end of 2026, after the environmental assessment and building permit.Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI)
2028-H2First operationalPlannedFirst building expected in the second half of 2028; the report places the formal opening between then and 2029.Prima Monza; Giornale di Vimercate (press clipping hosted by CIAI)

Power supply

TypeDescriptionSources
GridOn-site substation linked by underground cable to a new station Terna is to build near the Burago boundary.Prima Monza
Other133 emergency generators are planned (fuel not stated), which Il Giorno puts at about 1,000 MW thermal in total.Il Giorno; Cloudnews.tech

Capacity figures conflict: 156 MW (Prima Monza, Giornale di Vimercate), about 220 MW (Cloudnews, citing Il Cittadino) and 300 MW (Il Giorno); site size is 19 hectares in local press but 277,800 square metres on QTS's undated page, which calls the development proposed (status_as_of is the access date). Giornale di Vimercate was read as a PDF clipping hosted by CIAI, a charity QTS sponsors; Prima Monza's own site carries the same text. A sponsored MBNews piece, also hosted by CIAI, said old sheds were being demolished; this is unconfirmed and not recorded. Opponents asked for heat recovery, generator-test limits and buried power lines. No ministry environmental decision was found.

Sources for these details
Companies
  • Developer: QTS Data Centers (unknown scope) evidence
  • Developer: QTS Data Centers (unknown scope) evidence
  • Developer: QTS Data Centers (unknown scope) evidence
  • Developer: Kryalos SGR (unknown scope) evidence
  • Developer: Kryalos SGR (unknown scope) evidence
  • Utility: Terna (unknown scope) evidence
  • Utility: Terna (unknown scope) evidence
  • Government: Comune di Vimercate (unknown scope) evidence
  • Government: Comune di Vimercate (unknown scope) evidence
Source and location review
Status source
Vimercate evidence row
QTS Data Centers · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
45.61700, 9.36700
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Town coordinates from the Vimercate Wikipedia article. Sources place the site on the former IBM area at Velasca, a frazione of Vimercate, near the boundary with Burago; the site is not mapped in the local OpenStreetMap layer.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
e4ddd93d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for QTS Vimercate data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Il Campus Data Center fa paura: "Diciamo no al deserto di cemento"
Archived copy
Il Giorno
News
Imported: Record, Imported: Status, Metric: Buildings, Metric: Jobs Permanent, Metric: Power Capacity, Power Source: Other, Role: Developer, Role: Governmentsource-terms-not-recordedIl Giorno93e5d9b5b149cd079b91eda6e834f196bde53003e6eea16cc3178ef24b3ccaa6
Factual source record; not the publisher page
Il primo data center della città si svela
Archived copy
Prima Monza
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedPrima Monza6b037ce29aea112da6d7a6265ba3551b06d551d4923942dfeeee65e1c11eec5f
Factual source record; not the publisher page
QTS prepares a 220 MW campus near Milan and accelerates its expansion
Archived copy
Cloudnews.tech
Trade publication
Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Other, Power Source: Other, Role: Developer, Role: Utilitynot statedsource-terms-not-recordedCloudnews.techaf74a76d5f57a360e82e965e3e900dc54ec384d2fa21d81d2aeb16d6ef68aa2c
Factual source record; not the publisher page
Su il sipario sul nuovo Data center
Archived copy
Giornale di Vimercate (press clipping hosted by CIAI)
News
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Othersource-terms-not-recordedGiornale di Vimercate (press clipping hosted by CIAI)cc54c7980902165ebaa1396b86acdb0e03634749d09c0b57cfacab8237d8990e
Factual source record; not the publisher page
Vimercate
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia1c459b9ac92b08261d61200b1849a3f7d70b872f751c4e56c4fecbdfece6b98b
Factual source record; not the publisher page
Vimercate
Archived copy
QTS Data Centers
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Role: Developernot statedsource-terms-not-recordedQTS Data Centers2719435047d84f9059062776d9be3aa9f0a4dd88fab54013b3d10998cac5063f
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). QTS Vimercate data center campus [site vcc-site-e6669b76221d6e79fd89]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6669b76221d6e79fd89/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction