China Telecom GBA Integrated Data Center, Zhenjiang Industrial Park Campus

Announced

China · 1 project · Last reported

Summary

On July 24, 2026 the Shaoguan Natural Resources Bureau published China Telecom Guangdong's planning-permit application for the A7 intelligent computing centre (49,523.63 m2) and two outdoor generator platforms on a 21,006 m2 parcel north of the existing A5/A6 data centres. The notice does not establish an issued permit; an August 27 government narrative reports Phase 2 started without a dated participant statement, so no physical stage is asserted. evidence

Shaoguan Natural Resources Bureau · published 2026-07-24

Location

The interactive map needs JavaScript. Display anchor: 24.91263, 113.55348 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Project locator; building footprints are not mapped.

Projects (1)

China Telecom GBA Integrated Data Center, Zhenjiang Park — Phase 2.1 A7 Intelligent Computing Centre

Announced last observed as of · Project announcement

Government portal report says China Mobile, China Unicom and China Telecom data centres in the Zhenjiang cluster have entered operation, and that China Telecom GBA data centre Phase 2 has started in Zhenjiang industrial park; Phase 2.1 land is 31.5 mu with about 50,000 m2 total floor area. It also says China Unicom Shaoguan data-centre computing will exceed 20,000 P by end-2026 (forecast). evidence

Shaoguan Municipal Government / Shaoguan Daily · published 2026-08-27

Georeferenced 2025 Sentinel-2 cloudless mosaic extract (113.535-113.570E, 24.895-24.925N). Used only to validate the coordinate-system interpretation of official Shaoguan site plans: built China Mobile A/B and China Telecom A5/A6 rows are visible and match plan coordinates under EPSG:4526. Not used as a status observation. evidence

EOX IT Services GmbH · publication date not stated

Approval (韶环审〔2026〕65号) of the substation EIA for China Telecom GBA Integrated Data Center (Shaotang Park) at parcel GJ0202A-17A-1, Xinshao Town, Zhenjiang District. Shows the programme has a separately sited Shaotang park, distinct from the Lishi Town / Zhenjiang industrial-park campus. evidence

Shaoguan Ecology and Environment Bureau · published 2026-09-30

Official listing notice for parcel 2025A22, ZC0201A-09-2 (GSY), west of planned vertical road 2, Lishi Town: 2.1006 ha, class-1 industrial use, 50 years, listing period November 17-27, 2025; remarks state the parcel is for a big-data-centre project and has been levelled with water, drainage, road and power connections. evidence

Shaoguan Natural Resources Bureau · publication date not stated

Companies
  • Operator: China Telecom Corporation Limited Guangdong Branch (intended) evidence
Source and location review
Status source
Shaoguan NRB pre-approval notice: China Telecom GBA Integrated Data Center construction-project planning permit (A7) evidence row
Shaoguan Natural Resources Bureau · published 2026-07-24 · Government record
Locator
Project locator · Compiled location reference · official_plan_building_footprint_centroid_from_plan_coordinates evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 95 days before the data update on 2026-10-27

Location details
Coordinates
24.91263, 113.55348
Geometry licence
all-rights-reserved
Use scope
Project locator
Scope class
official_plan_building_footprint_centroid_from_plan_coordinates
Authority
Compiled location reference
Source entity
Campus
Method
official_plan_gauss_kruger_zone38_coordinates_cgcs2000_transform_imagery_checked
Derivation
coordinate_transform
Precision scope
Centroid of the A7 building outline from its four printed corner coordinates (125.2 m x 72.3 m). Locates the proposed A7 building, not the existing A1-A6 campus buildings, a surveyed boundary, entrance or construction extent.
Horizontal uncertainty
Not reported

The plans state no datum or survey accuracy; the CGCS2000 zone-38 interpretation is checked only against 10 m Sentinel-2 imagery (registration within roughly 10 m for built controls). Absolute accuracy is not established; decimal places are arithmetic precision.

Geometry evidence
8f6bf744

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for China Telecom GBA Integrated Data Center, Zhenjiang Industrial Park Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
EOX Sentinel-2 cloudless 2025 mosaic: Shaoguan Zhenjiang data-centre cluster (EPSG:4326 WMS extract)
Archived copy
EOX IT Services GmbH
Other
Site and project identitynot statedCC-BY-NC-SA-4.0Sentinel-2 cloudless - https://s2maps.eu by EOX IT Services GmbH (Contains modified Copernicus Sentinel data 2025)fbbdb234d7c59561a9367aae4cc7741c95268c7e66f20e4680a814c237146bea
Retained source material; see source provenance
Shaoguan Ecology and Environment Bureau approval: China Telecom GBA Integrated Data Center (Shaotang Park) 220 kV substation EIA
Archived copy
Shaoguan Ecology and Environment Bureau
Government record
Site and project identity, Grid connection contextall-rights-reservedShaoguan Ecology and Environment Bureau1128c9ce8628d34d10fccc39a7111ecc3e08f1bb5b4f33dbe3e28021e8f7d23f
Retained source material; see source provenance
Shaoguan government: Zhenjiang accelerates GBA computing core (reprinted from Shaoguan Daily)
Archived copy
Shaoguan Municipal Government / Shaoguan Daily
Government record
Site and project identityall-rights-reservedShaoguan Municipal Government / Shaoguan Dailyc3611bd68ad18376d16c6eee3ad8a65dc4ae55af364d91f41a3176108a9d10bf
Retained source material; see source provenance
Shaoguan NRB land-use-right listing notice 韶地出让告字[2025]022号: parcel ZC0201A-09-2 (big-data-centre project)
Archived copy
Shaoguan Natural Resources Bureau
Government record
Site and project identitynot statedall-rights-reservedShaoguan Natural Resources Bureau8e2dfaf72e0ad436d8636c6ce94e53d69cdcbc9e4fc87d0902647b8490540637
Retained source material; see source provenance
Shaoguan NRB pre-approval notice plan sheet: China Telecom GBA Integrated Data Center A7 intelligent computing centre
Archived copy
Shaoguan Natural Resources Bureau
Government record
Geometry, Operator claimall-rights-reservedShaoguan Natural Resources Bureaue00eb14064f9d00b574be2876451205e7aa5bd73f53227fc52dd9fd3f0c7a474
Retained source material; see source provenance
Shaoguan NRB pre-approval notice: China Telecom GBA Integrated Data Center construction-project planning permit (A7)
Archived copy
Shaoguan Natural Resources Bureau
Government record
Project announcementall-rights-reservedShaoguan Natural Resources Bureaua7ff8428ebbaab191e0ca497d6dfbc5731be50210e1d1618b0eaaae62c099831
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). China Telecom GBA Integrated Data Center, Zhenjiang Industrial Park Campus [site vcc-site-e730be87839857aed507]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e730be87839857aed507/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction