G42 and Microsoft Olkaria geothermal data centre campus

Announced

Kenya · 1 project · Last reported

Summary

Planned geothermal-powered data centre campus at Olkaria, near Lake Naivasha in Kenya's Rift Valley, announced in May 2024 by G42 and Microsoft with Kenya's ICT ministry. G42 was to build it and it was to host a new Azure East Africa cloud region, with a 100 MW first phase and potential to grow to about 1 GW; press reports call it a USD 1 billion data centre. The May 2026 opening target was missed: in 2026 the project was reported stalled over power supply limits and unapproved funding, with KenGen saying it remained at design stage, while the government said it had not been abandoned.

Source record as of 2026-08-24 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: -0.88574, 36.26999 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

G42 and Microsoft Olkaria geothermal data centre campus

Announced last observed as of · Reported status

Location: Olkaria (near Lake Naivasha), KE. Sources name Olkaria only. Coordinates are those given for the Olkaria geothermal area on its Wikipedia page, not a data centre parcel. Microsoft; Al Jazeera; Wikipedia

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity100 MWPlanned · Phase · Unspecified · First phase2024-05-22Gulf News
Power capacityup to 1,000 MWPlanned · Campus · Unspecified2026-08-24Potential eventual scale, first stated by G42's chief executive in May 2024.Gulf News; Al Jazeera
Investment1,000,000,000 USDReported · Campus2026-05-23Gulf News, Semafor and Citizen Digital describe a USD 1 billion data centre. Microsoft's announcement and Al Jazeera instead frame USD 1 billion as a wider digital package in which the data centre is one part, so the figure may not be campus-specific.Gulf News; Semafor; Citizen Digital

Companies and organizations

NameRoleNotesSources
G42DeveloperTo design and build the campus with local partners and lead arranging the investment.Microsoft; Gulf News
MicrosoftOperatorMicrosoft and G42 were to design and operate a new Azure East Africa cloud region hosted at the campus.Microsoft; Gulf News
Olkaria EcoCloud Data CentreDeveloperDescribed as a local partner in the G42-led development.Al Jazeera
Kenya Ministry of Information, Communications and the Digital EconomyGovernmentParty to the 2024 letter of intent; the government planned to use the facility for public services.Microsoft

Timeline

DateEventActual or plannedNotesSources
2024-05-22AnnouncedActualMicrosoft; Gulf News
2026-05First operationalPlannedOriginal target of operation about two years after the 2024 announcement; it was missed.Gulf News; Semafor
2026-05OtherActualAl Jazeera reported that plans stalled in May 2026 over power capacity concerns; Semafor reported that the National Treasury had not approved funding and that ground had not been broken. No formal suspension was reported.Semafor; Al Jazeera

Power supply

TypeDescriptionSources
GeothermalThe campus was planned to run entirely on renewable geothermal energy from the Olkaria area.Microsoft; Gulf News; Al Jazeera

Kept at announced: no source reports a formal halt or suspension. Semafor (May 2026) said the project was unlikely to go ahead and the National Treasury had not approved funding; Al Jazeera (August 2026) said plans stalled in May 2026 over power capacity, and KenGen, which operates the Olkaria geothermal complex, said it was still at design stage. Citizen Digital reported the government insisting it had not been abandoned and the technology envoy saying it was not suspended. President Ruto said it would need about 1,000 MW, roughly a third of national capacity. Microsoft presented USD 1 billion as an initial investment in a wider digital initiative.

Sources for these details
Companies
  • Developer: G42 (unknown scope) evidence
  • Developer: G42 (unknown scope) evidence
  • Operator: Microsoft (unknown scope) evidence
  • Operator: Microsoft (unknown scope) evidence
  • Developer: Olkaria EcoCloud Data Centre (unknown scope) evidence
  • Government: Kenya Ministry of Information, Communications and the Digital Economy (unknown scope) evidence
Source and location review
Status source
Kenya's $1B Microsoft data centre project in limbo over power concerns evidence row
Citizen Digital · published 2026-05-23 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 64 days before the data update on 2026-10-27

Location details
Coordinates
-0.88574, 36.26999
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources name Olkaria only. Coordinates are those given for the Olkaria geothermal area on its Wikipedia page, not a data centre parcel.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
e8aa9f30

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for G42 and Microsoft Olkaria geothermal data centre campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Can Kenya's AI ambitions coexist with Naivasha's water needs?
Archived copy
Al Jazeera
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Power Source: Geothermal, Role: Developersource-terms-not-recordedAl Jazeera7ccf456dddbaa0e1689f266437fd0ef7e4bbadd5458e5fc44e71cd0cd49c94bf
Factual source record; not the publisher page
Energy shortfall 'problem' scuppers Kenya's $1B Microsoft data center
Archived copy
Semafor
News
Imported: Record, Metric: Investment, Milestone: First Operational, Milestone: Othersource-terms-not-recordedSemafor98a1ede9ad39348948a576d0582aa529637f79fa91471c1a4790f1e94508182a
Factual source record; not the publisher page
Kenya's $1B Microsoft data centre project in limbo over power concerns
Archived copy
Citizen Digital
News
Imported: Record, Imported: Status, Metric: Investmentsource-terms-not-recordedCitizen Digitalc0b9dd2aad847d27af4075f0e429ee65c642c6e01b7dcba22267b8855b77e77b
Factual source record; not the publisher page
Microsoft and G42 announce $1 billion comprehensive digital ecosystem initiative for Kenya
Archived copy
Microsoft
Company disclosure
Imported: Geometry, Imported: Record, Milestone: Announced, Power Source: Geothermal, Role: Developer, Role: Government, Operator claimsource-terms-not-recordedMicrosoft045b24b7a2933b1dac1cd82e55444af3bcae30c491f419432d68e02f8627aec4
Factual source record; not the publisher page
Microsoft, UAE's G42 announce $1 billion geothermal data centre in Kenya
Archived copy
Gulf News
News
Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Geothermal, Role: Developer, Operator claimsource-terms-not-recordedGulf News148d2cf13ca5baf892bf0584f5e7f401c51ec0f1b14ff2287a3a37d6188a2444
Factual source record; not the publisher page
Olkaria
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia09cfc7f504c25aa16930de4bbd5de06c6e312fd15065a19b61a8abba3788fa43
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). G42 and Microsoft Olkaria geothermal data centre campus [site vcc-site-e7f4d963829eac6090a7]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e7f4d963829eac6090a7/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction