Summary

SK Telecom and other SK Group companies are building an AI data center with Amazon Web Services on a former SK Chemicals site in the Mipo National Industrial Complex in Ulsan, South Korea. Plans call for a first phase of about 41 MW by November 2027 and about 103 MW by February 2029, with up to 60,000 GPUs and a longer-term aim of gigawatt scale. Power is to come from a nearby LNG-fuelled cogeneration plant. Construction began with an August 2025 groundbreaking. In August 2026 SK Telecom agreed to move SK Broadband's data center business, including the Ulsan build, into a new company, SK Horizon, backed by KKR and an IMM-Stonebridge consortium, subject to approvals.

Source record as of 2026-09-14 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 35.53920, 129.31190 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

State or region reference only; the facility position is not established.

Projects (1)

SK AI Data Center Ulsan

Under construction last observed as of · Reported status

Location: Ulsan, KR. Sources place the site in the Mipo National Industrial Complex in Ulsan without an address, and the complex could not be geocoded; coordinates are the OpenStreetMap Nominatim centroid of Ulsan Metropolitan City. AMCHAM Korea / The Chosun Daily; iTnews Asia; Construction Review Online

Use: Ai unspecified, Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity41 MWPlanned · Phase · Unspecified · Phase 1 (target November 2027)2025-06-16A September 2026 report gives about 40 MW for this phase.AMCHAM Korea / The Chosun Daily; iTnews Asia
Power capacity103 MWPlanned · Campus · Unspecified2025-06-16Full initial build targeted for February 2029.AMCHAM Korea / The Chosun Daily; iTnews Asia; Construction Review Online
Power capacity100 MWPlanned · Campus · Unspecified2025-08-29TelecomTV's rounded figure at groundbreaking; other reports give 103 MW.TelecomTV
Power capacity1,000 MWPlanned · Campus · Unspecified2026-07Long-term gigawatt-scale aim without a timeline, first reported in June 2025 and restated by SK Telecom in July 2026. In September 2026 SK's chairman said planned capacity at Ulsan was approaching 900 MW.AMCHAM Korea / The Chosun Daily; Construction Review Online
Accelerators60,000 countPlanned · Campus2025-06-16AMCHAM Korea / The Chosun Daily; iTnews Asia; Construction Review Online
Investmentabout 7,000,000,000,000 KRWReported · Campus2025-08-29TelecomTV attributes the 7 trillion won figure to South Korea's ICT ministry.TelecomTV; Construction Review Online
Investmentabout 4,000,000,000 USDReported · Campus2025-06-16AWS's expected contribution, per reports citing industry sources; TelecomTV describes it as part of the 7 trillion won total, so the two figures should not be added.AMCHAM Korea / The Chosun Daily; iTnews Asia; TelecomTV
Land areaabout 3.6 hectaresAcquired · Campus2025-06-16Reported as about 36,000 square meters bought from SK Chemicals for 28.3 billion won.iTnews Asia; Construction Review Online

Companies and organizations

NameRoleNotesSources
SK TelecomDeveloperAMCHAM Korea / The Chosun Daily; Korea JoongAng Daily; TelecomTV; Construction Review Online; SK Telecom
SK BroadbandDeveloperNamed alongside SK Telecom as leading the project and as co-purchaser of the site.AMCHAM Korea / The Chosun Daily; iTnews Asia; Construction Review Online
SK EcoplantBuilderTelecomTV; Construction Review Online
Amazon Web ServicesInvestorDescribed as SK's partner in the project and expected to invest about USD 4 billion, according to reports citing industry sources; the companies' own figures were not found.AMCHAM Korea / The Chosun Daily; iTnews Asia; TelecomTV
SK Multi-UtilityPower supplierKorea JoongAng Daily; TelecomTV
SK GasPower supplierSupplies LNG to the nearby cogeneration plant.iTnews Asia; Korea JoongAng Daily; TelecomTV
Ulsan Metropolitan CityGovernmentSigned an MoU with SK Telecom on regional revitalization and expanding the site.TelecomTV; Construction Review Online
SK HorizonOperatorPlanned spin-off of SK Broadband's data center business that is to run the Ulsan AI data center under construction; SK Telecom targets establishing it in the first quarter of 2027, pending shareholder and government approvals.Light Reading; Construction Review Online; SK Telecom

Timeline

DateEventActual or plannedNotesSources
2025-04Site acquiredActualiTnews Asia; Construction Review Online
2025-06AnnouncedActualPlans first reported by Korean media citing industry sources in mid-June 2025.AMCHAM Korea / The Chosun Daily; iTnews Asia
2025-08-29Construction startedActualGroundbreaking ceremony attended by SK, AWS and city officials.Korea JoongAng Daily; TelecomTV; Construction Review Online
2027-11First operationalPlannedTarget for the roughly 41 MW first phase.AMCHAM Korea / The Chosun Daily; iTnews Asia; Construction Review Online
2029-02OtherPlannedTarget for expanding the site to about 103 MW in a second phase; SK has since signalled a much larger build-out.AMCHAM Korea / The Chosun Daily; iTnews Asia; Construction Review Online
2026-08-27OtherActualSK Telecom signed agreements to spin SK Broadband's data center business, including the Ulsan AI data center under construction, into SK Horizon with 3.08 trillion won of equity from KKR and an IMM Investment-Stonebridge consortium; completion is targeted for the first quarter of 2027.Light Reading; Construction Review Online; SK Telecom

Power supply

TypeDescriptionSources
OtherPower from a nearby LNG-fuelled cogeneration plant run by SK Multi-Utility with fuel from SK Gas, with LNG cold energy proposed for cooling.iTnews Asia; Korea JoongAng Daily; TelecomTV; Construction Review Online
Sources for these details
Companies
  • Developer: SK Telecom (unknown scope) evidence
  • Developer: SK Telecom (unknown scope) evidence
  • Developer: SK Telecom (unknown scope) evidence
  • Developer: SK Telecom (unknown scope) evidence
  • Developer: SK Telecom (unknown scope) evidence
  • Developer: SK Broadband (unknown scope) evidence
  • Developer: SK Broadband (unknown scope) evidence
  • Developer: SK Broadband (unknown scope) evidence
  • Builder: SK Ecoplant (unknown scope) evidence
  • Builder: SK Ecoplant (unknown scope) evidence
  • Investor: Amazon Web Services (unknown scope) evidence
  • Investor: Amazon Web Services (unknown scope) evidence
  • Investor: Amazon Web Services (unknown scope) evidence
  • Power Supplier: SK Multi-Utility (unknown scope) evidence
  • Power Supplier: SK Multi-Utility (unknown scope) evidence
  • Power Supplier: SK Gas (unknown scope) evidence
  • Power Supplier: SK Gas (unknown scope) evidence
  • Power Supplier: SK Gas (unknown scope) evidence
  • Government: Ulsan Metropolitan City (unknown scope) evidence
  • Government: Ulsan Metropolitan City (unknown scope) evidence
  • Operator: SK Horizon (unknown scope) evidence
  • Operator: SK Horizon (unknown scope) evidence
  • Operator: SK Horizon (unknown scope) evidence
Source and location review
Status source
SK Telecom creates SK Horizon in $2.2B data center spin-off deal evidence row
Light Reading · published 2026-08-28 · Trade publication
Locator
State or region reference only · Compiled location reference · admin1 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 43 days before the data update on 2026-10-27

Location details
Coordinates
35.53920, 129.31190
Geometry licence
source-terms-not-recorded
Use scope
State or region reference only
Scope class
admin1
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources place the site in the Mipo National Industrial Complex in Ulsan without an address, and the complex could not be geocoded; coordinates are the OpenStreetMap Nominatim centroid of Ulsan Metropolitan City.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
c4cbb4ab

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for SK AI Data Center Ulsan
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
SK AI Data Center Ulsan: Chairman Says Site Nearing 900 Megawatts
Archived copy
Construction Review Online
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Accelerators, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Milestone: Site Acquired, Power Source: Other, Role: Builder, Role: Developer, Role: Government, Operator claimsource-terms-not-recordedConstruction Review Online66c7f3feed0b945abf0953d448f7a846acaa268083e5596b93249adf19371098
Factual source record; not the publisher page
SK Group and AWS to build South Korea's largest AI data centre in Ulsan
Archived copy
iTnews Asia
Trade publication
Imported: Geometry, Imported: Record, Metric: Accelerators, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Milestone: Other, Milestone: Site Acquired, Power Source: Other, Role: Developer, Role: Investor, Role: Power Suppliersource-terms-not-recordediTnews Asia564204ca585455c67085d3c94fe0b780ee6a2845d7a4267a6d201ce381c51396
Factual source record; not the publisher page
SK Group breaks ground on AI-only data center in Ulsan
Archived copy
Korea JoongAng Daily
News
Imported: Record, Milestone: Construction Started, Power Source: Other, Role: Developer, Role: Power Suppliersource-terms-not-recordedKorea JoongAng Dailyafbcb0fdec98f1466ab4a3098f69f2be352d2d2be16b2e1e8577ef689e5a4cf4
Factual source record; not the publisher page
SK Telecom creates SK Horizon in $2.2B data center spin-off deal
Archived copy
Light Reading
Trade publication
Imported: Record, Imported: Status, Milestone: Other, Operator claimsource-terms-not-recordedLight Reading46091df288541f5b06fcbabff026d6d85aea725f0447497b954d98574ba59814
Factual source record; not the publisher page
SK Telecom Launches AI Data Center Infrastructure Company 'SK Horizon' and Secures Investments from KKR and IMM
Archived copy
SK Telecom
Company disclosure
Imported: Record, Imported: Status, Milestone: Other, Role: Developer, Operator claimsource-terms-not-recordedSK Telecom7ef405fdb0cdf509ad36acf7c20e5c1905df85f7c9ab2530f856d1b2fd86875a
Factual source record; not the publisher page
SK, AWS to build South Korea's largest AI data center in Ulsan (reprint of The Chosun Daily)
Archived copy
AMCHAM Korea / The Chosun Daily
News
Imported: Geometry, Imported: Record, Metric: Accelerators, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Milestone: Other, Role: Developer, Role: Investorsource-terms-not-recordedAMCHAM Korea / The Chosun Daily3ffc3cdd27ccf75b8e5b4c495a86a3adddc5d38acf2ddf13c90718c8f15b8196
Factual source record; not the publisher page
Under the hood of SKT's Ulsan AI datacentre
Archived copy
TelecomTV
Trade publication
Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Construction Started, Power Source: Other, Role: Builder, Role: Developer, Role: Government, Role: Investor, Role: Power Suppliersource-terms-not-recordedTelecomTV37db69c75399659fc842cac33ab31fd8436e5a4e41abe509f02916a9f4a05994
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). SK AI Data Center Ulsan [site vcc-site-e8f2d5efccb035e9135a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e8f2d5efccb035e9135a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction