Chindata Hebei Cunrui Base, Huailai

Operational

China · 1 project · Last reported

Summary

The revised restructuring report for Guangdong HEC Technology's acquisition of Chindata's China business, published on cninfo on 23 September 2026 (signed September 2026), lists Cunrui phases 1-4 (环首都·存瑞云计算产业基地建设项目 一期 to 四期; 河北秦淮数据有限公司 and 怀来斯达惠, 怀来斯达俊 and 怀来斯达皓数据有限公司) at 头二营村 and 葫芦套村, Cunrui town, as built with title certificates and completed environmental acceptance, and states that, as of its signing date, the operations building and power-distribution facilities used for Cunrui phases 1-4 and the phase 3 parallel-machine room are in normal and sustainable use. This supports current operation of the four phases; phase-level capacity, customers and service-start dates are not taken from the filing. evidence

Guangdong HEC Technology Holding Co., Ltd. (广东东阳光科技控股股份有限公司, 600673.SH); published on cninfo · published 2026-09-23

Location

The interactive map needs JavaScript. Display anchor: 40.48965, 115.56514 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Chindata Hebei Cunrui Base (河北秦淮数据存瑞基地) — Cunrui phases 1-4 existing data-centre operations

Operational last observed as of · Authoritative status update

Valuer's reply (dated September 2026) to the SSE inquiry on the Chindata acquisition. It says the built projects can all be used normally (已建项目均可正常使用, PDF page 71), lists the Cunrui phase 3 parallel-machine room and the operations building and power-distribution facilities at 头二营村 and 葫芦套村 among buildings without title certificates (PDF page 72), and states that as of the reply date these buildings are in normal and sustainable use (PDF page 73). Corroborates the report; not used as the status source. evidence

重庆坤元资产评估有限公司 (valuer); published on cninfo by Guangdong HEC Technology Holding · published 2026-09-23

Pre-approval publicity (7-17 June 2023) of the plan for the 环首都·存瑞云计算产业基地110KV变电站建设项目 at 头二营村 and 葫芦套村, Cunrui town, builder 河北秦淮数据有限公司, public-facility land of 4,500.09 m2 (the same area the 2026 restructuring report lists as 河北秦淮数据有限公司 公用设施用地 at these villages). Identity context only. evidence

Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal · published 2023-06-07

Location sheet whose imagery panel puts the red 本期建设范围 box of the Chindata Cunrui base substation north of the provincial road, east of the school with a running track, at the south-west edge of the data-centre campus then under construction: the same campus the 2026 Tencent sheet labels 河北秦淮数据存瑞基地. Identity context only. evidence

Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal · published 2023-06-07

Pre-approval publicity (10-20 January 2024) of a revised detailed plan for the 环首都·存瑞云计算产业基地建设项目(三期) at 头二营村 and 葫芦套村, developed by 怀来斯达俊数据有限公司 (original plan approved November 2021), confirming the project company and villages of Cunrui phase 3. Identity context only. evidence

Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal · published 2024-01-10

EPSG:4326 imagery export showing the Tencent campus south of S241, the Chindata block north of it, the Cunrui middle-school running track to the west and 葫芦套村 to the south-east, used to register the official 2026 sheet. Imagery date not stated; no status is taken from it. evidence

Esri · publication date not stated

Companies
  • Operator: Chindata (秦淮数据; project companies 河北秦淮数据有限公司, 怀来斯达惠数据有限公司, 怀来斯达俊数据有限公司, 怀来斯达皓数据有限公司) (current) evidence
Source and location review
Status source
广东东阳光科技控股股份有限公司发行股份购买资产并募集配套资金暨关联交易报告书(修订稿)(revised restructuring report for the acquisition of Chindata's China business) evidence row
Guangdong HEC Technology Holding Co., Ltd. (广东东阳光科技控股股份有限公司, 600673.SH); published on cninfo · published 2026-09-23 · Regulatory filing
Locator
Campus locator · Compiled location reference · official_location_map_labelled_campus_block_centroid_on_esri_imagery evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 34 days before the data update on 2026-10-27

Location details
Coordinates
40.48965, 115.56514
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_location_map_labelled_campus_block_centroid_on_esri_imagery
Authority
Compiled location reference
Source entity
Campus
Method
official_2026_location_sheet_label_registered_to_esri_wgs84_imagery_analyst_traced_campus_block_centroid
Derivation
georeferenced_source_map
Precision scope
Analyst-selected area centroid of the building block that the official 2026 Huailai planning sheet labels 河北秦淮数据存瑞基地, traced on Esri World Imagery. It locates the Cunrui base as a whole, not a particular phase, building, the 110 kV substation, a parcel or a survey point.
Horizontal uncertainty
Not reported

No coordinates are published; the block outline was traced by eye on Esri imagery of unknown date and absolute accuracy, and the official sheet identifies the campus by label, not by a drawn boundary. Phase and parcel boundaries inside the block are unknown; decimals are not accuracy.

Geometry evidence
b94eaaec

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Chindata Hebei Cunrui Base, Huailai
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Esri World Imagery export, Cunrui town data-centre campuses (bbox 115.548,40.478,115.578,40.496; 2000x1200)
Archived copy
Esri
Satellite imagery
Site and project identitynot statedEsri World Imagery terms of use; not redistributedEsri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)27135cbfc2ffc86b27d4c91e51c5b59a1c3df85cf1be1eb494d68bbaa56905c7
Retained source material; see source provenance
关于环首都·存瑞云计算产业基地110KV变电站建设项目规划方案批前公示 (pre-approval publicity of the Cunrui base 110 kV substation plan)
Archived copy
Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal
Government record
Site and project identityall-rights-reservedHuailai County People's Government (怀来县人民政府), www.huailai.gov.cn4b21f092c2537c897db420b06dc29a5a77e2e146e0524a3a2d2fc36fe55fe276
Retained source material; see source provenance
关于环首都·存瑞云计算产业基地建设项目(三期)修建性详细规划修改方案的批前公示 (pre-approval publicity of the Cunrui phase 3 plan revision)
Archived copy
Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal
Government record
Site and project identityall-rights-reservedHuailai County People's Government (怀来县人民政府), www.huailai.gov.cn35bc14381c109860baf58b018e64fff1a3775ab280bf58c4e888bbe91b9e8148
Retained source material; see source provenance
广东东阳光科技控股股份有限公司发行股份购买资产并募集配套资金暨关联交易报告书(修订稿)(revised restructuring report for the acquisition of Chindata's China business)
Archived copy
Guangdong HEC Technology Holding Co., Ltd. (广东东阳光科技控股股份有限公司, 600673.SH); published on cninfo
Regulatory filing
Physical status, Operator claimall-rights-reserved广东东阳光科技控股股份有限公司 via cninfo (巨潮资讯网)240b3d14687b2179d132d1a96e0743d869ed208080f0c8d2fcd893127ec17306
Retained source material; see source provenance
环首都·存瑞云计算产业基地110kv变电站建设项目 周边现状及用地分析图 (location sheet attached to the 7 June 2023 publicity)
Archived copy
Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal
Government record
Site and project identityall-rights-reservedHuailai County People's Government (怀来县人民政府), www.huailai.gov.cnc8dad304e75727aac2bd76af4e0d7ddac669b309b095793362fac5d5adfcd17f
Retained source material; see source provenance
腾讯怀来瑞北云数据中心扩建自用110千伏变电站及线路工程项目建设工程设计方案 现状及用地分析图 (current-condition and land-use analysis sheet)
Archived copy
Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal
Government record
Geometry, Physical statusall-rights-reservedHuailai County People's Government (怀来县人民政府), www.huailai.gov.cn9a11c8596cfd630cdf00963f805e00d031b0fcfa272102d2df8bb1a57c23d925
Retained source material; see source provenance
重庆坤元资产评估有限公司关于上海证券交易所审核问询函所涉及资产评估相关问题的回复 (valuer's reply to the SSE review inquiry)
Archived copy
重庆坤元资产评估有限公司 (valuer); published on cninfo by Guangdong HEC Technology Holding
Regulatory filing
Site and project identityall-rights-reserved重庆坤元资产评估有限公司 via cninfo (巨潮资讯网)6584ea664d923a183d49018fbc0c14fe05bc0d558de7134497f825245ed73ae6
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Chindata Hebei Cunrui Base, Huailai [site vcc-site-ea061b82f82f38517038]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ea061b82f82f38517038/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction