YTL Green Data Center Park, Kulai
Partially operational
Malaysia · 1 project · Last reported
Summary
YTL Power International is developing a large data center park in Kulai, Johor, paired with a solar plant of about 500 MW and backup supply from the national grid. The park was first described as a 500 MW campus; GDS agreed in 2022 to co-develop part of it, and YTL announced an AI infrastructure collaboration with Nvidia in December 2023. YTL said in late 2025 that an Nvidia GB200-based AI data center at the park was operational, with about 300 MW being built and commissioned. In August 2026 it was reported to be bringing capacity online progressively and planning to raise the park's ceiling from 600 MW to 1,000 MW.
Source record as of 2026-08-20 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 1.65690, 103.60590 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
YTL Green Data Center Park, Kulai
Partially operational last observed as of · Reported status
Location: Kulai, Kulai District, Johor, MY. Sources place the park in Kulai, Johor, about 30 km from Johor Bahru, without an address; coordinates are the OpenStreetMap Nominatim point for Kulai town. GDS Holdings Limited (SEC Form 6-K exhibit); YTL Power International Berhad; EdgeProp Malaysia (The Edge)
Use: Ai unspecified, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 500 MW | Planned · Campus · Unspecified | 2023-12-08 | Original description of the park as a 500 MW campus matched by an equivalent amount of on-site solar. | GDS Holdings Limited (SEC Form 6-K exhibit); YTL Power International Berhad |
| Power capacity | 168 MW | Planned · Phase · Unspecified · GDS co-development (eight facilities) | 2022-05-19 | GDS Holdings Limited (SEC Form 6-K exhibit) | |
| Power capacity | 600 MW | Planned · Campus · Unspecified | 2025-10-31 | The Edge/EdgeProp refer to a 600 MW park; W.Media instead attaches 600 MW to backup grid supply, so the basis of this figure is unclear. | EdgeProp Malaysia (The Edge); EdgeProp Malaysia (The Edge) |
| Power capacity | 1,000 MW | Planned · Campus · Unspecified | 2026-08-20 | Planned increase of the Kulai park ceiling from 600 MW to 1,000 MW. | EdgeProp Malaysia (The Edge) |
| Power capacity | 300 MW | Under construction · Campus · Unspecified | 2025-11-03 | YTL's managing director described 300 MW as being built and commissioned on the site. | W.Media |
| Land area | 1,640 acres | Reported · Campus | 2025-10-31 | EdgeProp Malaysia (The Edge); W.Media |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| YTL Power International Berhad | Developer | GDS Holdings Limited (SEC Form 6-K exhibit); YTL Power International Berhad; W.Media; EdgeProp Malaysia (The Edge) | |
| YTL Data Center Holdings Pte. Ltd. | Developer | Wholly owned YTL Power subsidiary described as the initiator of the park. | GDS Holdings Limited (SEC Form 6-K exhibit) |
| GDS Holdings Limited | Developer | Signed a 2022 partnership to co-develop 168 MW across eight facilities at the park; later status of this arrangement was not found. | GDS Holdings Limited (SEC Form 6-K exhibit) |
| YTL Communications Sdn Bhd | Operator | YTL's telecom subsidiary, named as owner and manager of the Nvidia-based AI infrastructure rather than of the whole park. | YTL Power International Berhad |
| Nvidia | Hardware supplier | H100 GPUs were named in 2023; the AI data center reported operational in 2025 uses liquid-cooled GB200 NVL72 systems. | YTL Power International Berhad; EdgeProp Malaysia (The Edge); W.Media |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2022-05 | Other | Actual | GDS disclosed a recently signed partnership with YTL Power to co-develop data center capacity at the park, with the first phase expected in service in 2024. | GDS Holdings Limited (SEC Form 6-K exhibit) |
| 2023-12-08 | Other | Actual | YTL and Nvidia announced an AI infrastructure collaboration to be hosted at the park, with a first phase targeted for mid-2024. | YTL Power International Berhad |
| 2025-10-31 | Other | Actual | YTL announced its Nvidia GB200-based AI data center at the park was complete and operational, with global hyperscalers among its customers. | EdgeProp Malaysia (The Edge); W.Media |
| 2026-08 | Expansion announced | Actual | Reported plan to raise the park's planned capacity from 600 MW to 1,000 MW. | EdgeProp Malaysia (The Edge) |
Power supply
| Type | Description | Sources |
|---|---|---|
| Solar | A solar plant of about 500 MW supplies the park; earlier plans paired data center capacity with an equal amount of on-site solar. | GDS Holdings Limited (SEC Form 6-K exhibit); YTL Power International Berhad; EdgeProp Malaysia (The Edge); W.Media |
| Grid | About 600 MW of backup supply from the national grid, per W.Media. | W.Media |
Sources for these details
- GDS Holdings Limited Reports First Quarter 2022 Results — GDS Holdings Limited (SEC Form 6-K exhibit); 2022-05-19
- YTL to Advance AI Development in Malaysia in Collaboration with NVIDIA — YTL Power International Berhad; 2023-12-08
- YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational — EdgeProp Malaysia (The Edge); 2025-10-31
- YTL Power completes Nvidia-powered AI data centre in Johor — W.Media; 2025-11-03 · Archived source
- YTL Power to develop new gigawatt data centre campus in Johor — EdgeProp Malaysia (The Edge); 2026-08-20
- Companies
- Developer: YTL Power International Berhad (unknown scope) evidence
- Developer: YTL Power International Berhad (unknown scope) evidence
- Developer: YTL Power International Berhad (unknown scope) evidence
- Developer: YTL Power International Berhad (unknown scope) evidence
- Developer: YTL Data Center Holdings Pte. Ltd. (unknown scope) evidence
- Developer: GDS Holdings Limited (unknown scope) evidence
- Operator: YTL Communications Sdn Bhd (unknown scope) evidence
- Hardware Supplier: Nvidia (unknown scope) evidence
- Hardware Supplier: Nvidia (unknown scope) evidence
- Hardware Supplier: Nvidia (unknown scope) evidence
Source and location review
- Status source
- YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational evidence row
EdgeProp Malaysia (The Edge) · published 2025-10-31 · News - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 68 days before the data update on 2026-10-27
Location details
- Coordinates
- 1.65690, 103.60590
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources place the park in Kulai, Johor, about 30 km from Johor Bahru, without an address; coordinates are the OpenStreetMap Nominatim point for Kulai town.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- afe4b6ea
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| GDS Holdings Limited Reports First Quarter 2022 Results Archived copy | GDS Holdings Limited (SEC Form 6-K exhibit) Regulatory filing | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Solar, Role: Developer | source-terms-not-recorded | GDS Holdings Limited (SEC Form 6-K exhibit) | e997f79dff276cd215c32e910d33a8b825f22622e6995703d54c2f083d5ab5bbFactual source record; not the publisher page | ||
| YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational Archived copy | EdgeProp Malaysia (The Edge) News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Solar, Role: Hardware Supplier | source-terms-not-recorded | EdgeProp Malaysia (The Edge) | d205308183e641cfcf7f97223974db36f829de0ee8d77e343b420922a67de9f1Factual source record; not the publisher page | ||
| YTL Power completes Nvidia-powered AI data centre in Johor Archived copy | W.Media Trade publication | Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Power Source: Solar, Role: Developer, Role: Hardware Supplier | source-terms-not-recorded | W.Media | 44356e285785abff300c25161f2203df52e32958882566e614a8f084dba99eb9Factual source record; not the publisher page | ||
| YTL Power to develop new gigawatt data centre campus in Johor Archived copy | EdgeProp Malaysia (The Edge) News | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Expansion Announced, Role: Developer | source-terms-not-recorded | EdgeProp Malaysia (The Edge) | a050fc7699152c0b6320efbb5f33aa027ae3166bfe93ee970aedb09db4184165Factual source record; not the publisher page | ||
| YTL to Advance AI Development in Malaysia in Collaboration with NVIDIA Archived copy | YTL Power International Berhad Company disclosure | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Solar, Role: Developer, Role: Hardware Supplier, Operator claim | source-terms-not-recorded | YTL Power International Berhad | ed53b17b5a705ef4441c0a185a3d8fba9427afdf155d5a708991d62f743ed057Factual source record; not the publisher page |