Beacon AI Centers Indus campus

Announced

Canada · 1 project · Last reported

Summary

Beacon AI Centers plans an AI data centre campus about 3 km east of Calgary and 2 km northwest of the hamlet of Indus in Rocky View County, Alberta. Federal filings describe four data halls needing 300 MW each, supplied by an on-site gas-fired plant of about 1,494 MW built by the project entity Indus Power. The county approved the area structure plan in June 2025; the plant application is before the Alberta Utilities Commission, and the federal agency decided in March 2026 that no further federal assessment was needed. The proponent targeted commercial operation in Q3 2027.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 50.94340, -113.80720 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Project locator; building footprints are not mapped.

Projects (1)

Beacon AI Centers Indus campus

Announced last observed as of · Reported status

Location: Indus, Rocky View County, Alberta, CA. Decimal coordinates given in the proponent's initial project description (legal land description in section 11-23-28-W4M, south of Township Road 232), rounded to four decimals. Indus Power Generation LP via Impact Assessment Agency of Canada registry; Rocky View County

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,200 MWPlanned · Campus · Unspecified2025-12-29Four data halls with a stated power requirement of 300 MW each; the plant is designed to supply at least this much continuous power to them. The filing does not say whether the figure is IT load or total facility load.Indus Power Generation LP via Impact Assessment Agency of Canada registry
Power capacityabout 1,494 MWPlanned · Campus · Onsite generation2026-01-06Maximum installed capacity: 100 gas reciprocating engines of about 4.6 MW each plus four combined-cycle blocks.Indus Power Generation LP via Impact Assessment Agency of Canada registry; Impact Assessment Agency of Canada; Impact Assessment Agency of Canada
Land area627.2 acresPlanned · Campus2025-12-29Data centre campus area stated in the federal filing; the power plant footprint is about 45 acres within it.Indus Power Generation LP via Impact Assessment Agency of Canada registry
Land areaabout 900 acresPlanned · Campus2025-09-18Rocky View County describes the AI hub, and the land it redesignated for data centre use, as about 900 acres; this differs from the 627.2-acre campus in the federal filing.Rocky View County; Rocky View County
Jobs constructionup to 4,500 countPlanned · Campus2025-12-29Indus Power Generation LP via Impact Assessment Agency of Canada registry
Jobs permanent300 countPlanned · Campus2025-12-29Indus Power Generation LP via Impact Assessment Agency of Canada registry

Companies and organizations

NameRoleNotesSources
Beacon AI CentersDeveloperThe filing says Beacon develops the project through the project-specific entity Indus Power.Indus Power Generation LP via Impact Assessment Agency of Canada registry
Indus Power Generation LPPower supplierProponent of the on-site gas plant; its general partner is Northbridge Power GPC Inc.Indus Power Generation LP via Impact Assessment Agency of Canada registry; Impact Assessment Agency of Canada; Impact Assessment Agency of Canada
Rocky View CountyGovernmentApproved the area structure plan and land-use redesignation; participating in the provincial power plant review.Rocky View County; Rocky View County; Rocky View County
AltaLinkUtilityOwner of the 240 kV line the project proposes to tap, with interconnection at the Langdon 102S substation.Indus Power Generation LP via Impact Assessment Agency of Canada registry

Timeline

DateEventActual or plannedNotesSources
2025-06-17Zoning approvedActualCouncil approved the Beacon AI Hub area structure plan; the land was redesignated to a special data centre district.Rocky View County; Rocky View County; Rocky View County
2026-01-19OtherActualAlberta Utilities Commission posted notice of the gas plant application (proceeding 30524).Rocky View County
2026-03-10OtherActualImpact Assessment Agency of Canada decided no further federal assessment of the power plant was required.Impact Assessment Agency of Canada
2026-Q2Construction startedPlannedProponent schedule for civil works and foundations, before provincial approval was granted.Indus Power Generation LP via Impact Assessment Agency of Canada registry
2027-Q3First operationalPlannedTarget commercial operation date for the plant and data halls.Indus Power Generation LP via Impact Assessment Agency of Canada registry

Power supply

TypeDescriptionSources
Natural gas onsiteDedicated on-site plant combining gas reciprocating engines and combined-cycle gas turbines; gas supply via NGTL/ATCO or TC Energy options was still being arranged.Indus Power Generation LP via Impact Assessment Agency of Canada registry; Impact Assessment Agency of Canada

Status rests partly on Rocky View County's undated project page, which shows the gas plant application still under Alberta Utilities Commission review, so status_as_of is the date it was read (2026-10-09). The federal filing gives data centre details for information only; the data centre itself was not part of the federally reviewed power project. In July 2026 county council paused new applications to redesignate land for data centres; the report does not say whether this affects the already rezoned Beacon site.

Sources for these details
Companies
  • Developer: Beacon AI Centers (unknown scope) evidence
  • Power Supplier: Indus Power Generation LP (unknown scope) evidence
  • Power Supplier: Indus Power Generation LP (unknown scope) evidence
  • Power Supplier: Indus Power Generation LP (unknown scope) evidence
  • Government: Rocky View County (unknown scope) evidence
  • Government: Rocky View County (unknown scope) evidence
  • Government: Rocky View County (unknown scope) evidence
  • Utility: AltaLink (unknown scope) evidence
Source and location review
Status source
Beacon AI Hub - Thermal Power Plant Application evidence row
Rocky View County · publication date not stated · Government record
Locator
Project locator · Compiled location reference · site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
50.94340, -113.80720
Geometry licence
source-terms-not-recorded
Use scope
Project locator
Scope class
site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Decimal coordinates given in the proponent's initial project description (legal land description in section 11-23-28-W4M, south of Township Road 232), rounded to four decimals.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
314d2a34

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Beacon AI Centers Indus campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Beacon AI Centers - Indus Project: Initial Project Description
Archived copy
Indus Power Generation LP via Impact Assessment Agency of Canada registry
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Natural Gas Onsite, Role: Developer, Role: Power Supplier, Role: Utilitysource-terms-not-recordedIndus Power Generation LP via Impact Assessment Agency of Canada registry85eb073f3143231f9c7f48b60cfce959e8bfb4730d9b1e6dca2bedeb0d60b065
Factual source record; not the publisher page
Beacon AI Centers Indus Project (reference 90121)
Archived copy
Impact Assessment Agency of Canada
Government record
Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Power Suppliernot statedsource-terms-not-recordedImpact Assessment Agency of Canadaa8164606a6195bd3696459ba84574e5b3a50bdbe6971f11dc6f891ad8eee027f
Factual source record; not the publisher page
Beacon AI Hub - Thermal Power Plant Application
Archived copy
Rocky View County
Government record
Imported: Record, Imported: Status, Metric: Land Area, Milestone: Other, Milestone: Zoning Approved, Role: Governmentnot statedsource-terms-not-recordedRocky View Countyc3129e00a44cb415c27f2a89ee7e2dbd433dbed336386231cc2d7923a742d33d
Factual source record; not the publisher page
Councillors in rural county bordering Calgary vote to pause data centres
Archived copy
The Canadian Press via BNN Bloomberg
News
Imported: Record, Imported: Statussource-terms-not-recordedThe Canadian Press via BNN Bloomberga3f605a53a2c19249a3d05bab791dd3240e6c4c4fe1cb0f7bf83a5e975389835
Factual source record; not the publisher page
Public notice: Beacon AI Centers Indus Project, comments invited on the summary of the initial project description
Archived copy
Impact Assessment Agency of Canada
Government record
Imported: Record, Metric: Power Capacity, Power Source: Natural Gas Onsite, Role: Power Suppliersource-terms-not-recordedImpact Assessment Agency of Canadac7f7c5bfae9bb20c2af8cdcd85514f120d61b13f2592d4b65cf64b29887a2d3f
Factual source record; not the publisher page
Rocky View County Affirms Commitment to Responsible AI Data Centre Development
Archived copy
Rocky View County
Government record
Imported: Record, Metric: Land Area, Milestone: Zoning Approved, Role: Governmentsource-terms-not-recordedRocky View Countyb3c78e9f7e767f36f9f093ca39f003943244df32fa6fefae29e64e59f89ab339
Factual source record; not the publisher page
Rocky View County participates in Alberta Utilities Commission review of proposed Beacon AI Hub power plant
Archived copy
Rocky View County
Government record
Imported: Geometry, Imported: Record, Milestone: Zoning Approved, Role: Governmentsource-terms-not-recordedRocky View County8e7638c4cfa221c4ad727b2eef3ded5b2dadd0147c8cd8f02f5e105ea5eb3f4d
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Beacon AI Centers Indus campus [site vcc-site-ef8be5d9da9f69e72683]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ef8be5d9da9f69e72683/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction