China Telecom Shaotang Campus, Shaoguan

Announced

China · 1 project · Last reported

Summary

City government records September 21 project commencement event. Ceremony supports announced project status; actual physical works stage is not independently established. evidence

Shaoguan Municipal Government / Shaoguan Daily · published 2026-09-22

Location

The interactive map needs JavaScript. Display anchor: 24.78752, 113.66192 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

China Telecom Shaotang Campus Development

Announced last observed as of · Project announcement

Environmental approval issued September 30, 2026 for the campus's self-built 220 kV substation (4 x 120 MVA transformers outdoors, 220 kV GIS and distribution buildings), which also cites the city development commission's project approval 韶发改核准〔2026〕19号. This is grid-supply readiness evidence only; it does not change the announced status, location or capacity of the data-centre development. evidence

Shaoguan Ecology and Environment Bureau · published 2026-09-30

Companies
  • Operator: China Telecom (intended) evidence
Source and location review
Status source
Shaoguan city records September 21 Shaotang project commencement event evidence row
Shaoguan Municipal Government / Shaoguan Daily · published 2026-09-22 · Government record
Locator
Campus locator · Official source · official_eia_on_campus_substation_locator evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 36 days before the data update on 2026-10-27

Location details
Coordinates
24.78752, 113.66192
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_eia_on_campus_substation_locator
Authority
Official source
Source entity
Campus
Method
official_eia_geographic_dms_point_transcription
Derivation
direct_geometry
Precision scope
Reported center point of the campus 220kV substation in its northwest corner. Locates the campus through named on-campus support infrastructure; not a data-hall center, parcel centroid, or construction boundary.
Horizontal uncertainty
Not reported

No positional accuracy or coordinate datum stated. Numeric precision is source transcription precision, not positional accuracy; offset to individual data halls is unknown.

Geometry evidence
ba904be8

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for China Telecom Shaotang Campus, Shaoguan
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
China Telecom Shaotang campus 220kV substation environmental impact report, public version
Archived copy
Shaoguan Ecology and Environment Bureau / Guangdong Shaoke Environmental Technology
Government record
Geometry, Operator claimnot statedall-rights-reservedShaoguan Ecology and Environment Bureau / Guangdong Shaoke Environmental Technology99b928814f3e35012fe500511ea456f1581dd257ac736ef713adac3ba7896f65
Retained source material; see source provenance
Shaoguan city records September 21 Shaotang project commencement event
Archived copy
Shaoguan Municipal Government / Shaoguan Daily
Government record
Project announcementall-rights-reservedShaoguan Municipal Government / Shaoguan Daily97a84f3f4da119f90d695253507b0573850f13129c2069a1f1e4862c1527893c
Retained source material; see source provenance
Shaoguan Ecology and Environment Bureau approval: China Telecom GBA Integrated Data Center (Shaotang Park) 220 kV substation EIA
Archived copy
Shaoguan Ecology and Environment Bureau
Government record
Site and project identity, Grid connection contextall-rights-reservedShaoguan Ecology and Environment Bureau1128c9ce8628d34d10fccc39a7111ecc3e08f1bb5b4f33dbe3e28021e8f7d23f
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). China Telecom Shaotang Campus, Shaoguan [site vcc-site-efe797bc04a70a7ce5bb]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efe797bc04a70a7ce5bb/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction