Summary
City government records September 21 project commencement event. Ceremony supports announced project status; actual physical works stage is not independently established. evidence
Shaoguan Municipal Government / Shaoguan Daily · published 2026-09-22
Location
The interactive map needs JavaScript. Display anchor: 24.78752, 113.66192 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
China Telecom Shaotang Campus Development
Announced last observed as of · Project announcement
Environmental approval issued September 30, 2026 for the campus's self-built 220 kV substation (4 x 120 MVA transformers outdoors, 220 kV GIS and distribution buildings), which also cites the city development commission's project approval 韶发改核准〔2026〕19号. This is grid-supply readiness evidence only; it does not change the announced status, location or capacity of the data-centre development. evidence
Shaoguan Ecology and Environment Bureau · published 2026-09-30
- Companies
- Operator: China Telecom (intended) evidence
Source and location review
- Status source
- Shaoguan city records September 21 Shaotang project commencement event evidence row
Shaoguan Municipal Government / Shaoguan Daily · published 2026-09-22 · Government record - Locator
- Campus locator · Official source · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 36 days before the data update on 2026-10-27
Location details
- Coordinates
- 24.78752, 113.66192
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription
- Derivation
- direct_geometry
- Precision scope
- Reported center point of the campus 220kV substation in its northwest corner. Locates the campus through named on-campus support infrastructure; not a data-hall center, parcel centroid, or construction boundary.
- Horizontal uncertainty
Not reported
No positional accuracy or coordinate datum stated. Numeric precision is source transcription precision, not positional accuracy; offset to individual data halls is unknown.
- Geometry evidence
- ba904be8
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| China Telecom Shaotang campus 220kV substation environmental impact report, public version Archived copy | Shaoguan Ecology and Environment Bureau / Guangdong Shaoke Environmental Technology Government record | Geometry, Operator claim | not stated | all-rights-reserved | Shaoguan Ecology and Environment Bureau / Guangdong Shaoke Environmental Technology | 99b928814f3e35012fe500511ea456f1581dd257ac736ef713adac3ba7896f65Retained source material; see source provenance | |
| Shaoguan city records September 21 Shaotang project commencement event Archived copy | Shaoguan Municipal Government / Shaoguan Daily Government record | Project announcement | all-rights-reserved | Shaoguan Municipal Government / Shaoguan Daily | 97a84f3f4da119f90d695253507b0573850f13129c2069a1f1e4862c1527893cRetained source material; see source provenance | ||
| Shaoguan Ecology and Environment Bureau approval: China Telecom GBA Integrated Data Center (Shaotang Park) 220 kV substation EIA Archived copy | Shaoguan Ecology and Environment Bureau Government record | Site and project identity, Grid connection context | all-rights-reserved | Shaoguan Ecology and Environment Bureau | 1128c9ce8628d34d10fccc39a7111ecc3e08f1bb5b4f33dbe3e28021e8f7d23fRetained source material; see source provenance |
Cite this site
Kyars, K. (2026). China Telecom Shaotang Campus, Shaoguan [site vcc-site-efe797bc04a70a7ce5bb]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efe797bc04a70a7ce5bb/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction