China Mobile Plateau Big Data Center Haidong

Under construction

China · 1 project · Last reported

Summary

Qinghai government leadership report records the September 2 inspection at the named Phase 2 construction site. This refreshes the aggregate construction observation; individual stage completion and operation remain unverified. evidence

Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center) · published 2026-09-03

Location

The interactive map needs JavaScript. Display anchor: 36.50965, 102.00727 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Project locator; building footprints are not mapped.

Projects (1)

China Mobile Plateau Big Data Center Phase 2 Build

Under construction last observed as of · Authoritative status update

The Haidong Industrial Park / Hehuang New Area Management Committee recorded that on 27 August 2026 the 110 kV substation of the China Mobile data centre (移动数据中心110kV变电站) was one of the construction sites under way in the park, where park officials checked flood safety and asked about progress. Power-readiness context only: the record gives no substation capacity, location, completion or energisation date and does not name the phase it serves, and the record's 2 September 2026 Phase 2 construction observation, locator and capacity facts are unchanged. evidence

Haidong Industrial Park / Haidong Hehuang New Area Management Committee · published 2026-08-27

Source and location review
Status source
Qinghai governor visits China Mobile Plateau Big Data Center Phase 2 construction site on September 2 evidence row
Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center) · published 2026-09-03 · Government record
Locator
Project locator · Official source · official_environmental_assessment_phase2_stage1_project_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 55 days before the data update on 2026-10-27

Location details
Coordinates
36.50965, 102.00727
Geometry licence
all-rights-reserved
Use scope
Project locator
Scope class
official_environmental_assessment_phase2_stage1_project_point
Authority
Official source
Source entity
Project
Method
haidong_government_eia_project_center_coordinate
Derivation
official_dms_coordinate_to_point
Precision scope
The point is the official EIA project-center coordinate for Phase 2 Stage 1 and locates the named Phase 2 build. It is not a surveyed entrance, parcel centroid, campus boundary, building footprint, or current-work extent.
Horizontal uncertainty
Not reported

The EIA reports a project-center coordinate but no bounded horizontal-accuracy or survey-method statement.

Geometry evidence
e702223c

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for China Mobile Plateau Big Data Center Haidong
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Environmental impact report - China Mobile (Qinghai Haidong) Data Center Phase 2 Stage 1
Archived copy
Haidong Municipal People's Government
Government record
Geometry identity context, Geometryall-rights-reservedHaidong Municipal People's Government17b3d141857a4b0dcc92c59bf35a6349bf844525f7cd9c6d470b22ee655d9c2e
Retained source material; see source provenance
Haidong Industrial Park management committee news: flood-safety inspection of eight sites, including the China Mobile data-centre 110 kV substation construction site (27 August 2026)
Archived copy
Haidong Industrial Park / Haidong Hehuang New Area Management Committee
Government record
Grid connection contextall-rights-reservedHaidong Industrial Park / Haidong Hehuang New Area Management Committee4eb51c3669c38d1b08ad7a68d05ee0d01e0c251bbe3ea3e59bd8e55a46f109dd
Retained source material; see source provenance
Haidong mayor visits computing-industry construction sites
Archived copy
Huzhu County People's Government
Government record
Source location context, Physical statusall-rights-reservedHuzhu County People's Government0c6f983f91c9f2804287c2cbd8420c6006af2f500cb2b265aebb1d1a4bb2c9ba
Retained source material; see source provenance
Qinghai governor visits China Mobile Plateau Big Data Center Phase 2 construction site on September 2
Archived copy
Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center)
Government record
Physical statusall-rights-reservedQinghai Daily; Qinghai News (Qinghai Provincial Internet News Center)852ccbf74a175b96736b70f24d379772d4c9424efb55881066b08d70618f04e8
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). China Mobile Plateau Big Data Center Haidong [site vcc-site-f1171e4b8e247993d773]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1171e4b8e247993d773/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction