China Mobile Plateau Big Data Center Haidong
Under construction
China · 1 project · Last reported
Summary
Qinghai government leadership report records the September 2 inspection at the named Phase 2 construction site. This refreshes the aggregate construction observation; individual stage completion and operation remain unverified. evidence
Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center) · published 2026-09-03
Location
The interactive map needs JavaScript. Display anchor: 36.50965, 102.00727 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Project locator; building footprints are not mapped.
Projects (1)
China Mobile Plateau Big Data Center Phase 2 Build
Under construction last observed as of · Authoritative status update
The Haidong Industrial Park / Hehuang New Area Management Committee recorded that on 27 August 2026 the 110 kV substation of the China Mobile data centre (移动数据中心110kV变电站) was one of the construction sites under way in the park, where park officials checked flood safety and asked about progress. Power-readiness context only: the record gives no substation capacity, location, completion or energisation date and does not name the phase it serves, and the record's 2 September 2026 Phase 2 construction observation, locator and capacity facts are unchanged. evidence
Haidong Industrial Park / Haidong Hehuang New Area Management Committee · published 2026-08-27
Source and location review
- Status source
- Qinghai governor visits China Mobile Plateau Big Data Center Phase 2 construction site on September 2 evidence row
Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center) · published 2026-09-03 · Government record - Locator
- Project locator · Official source · official_environmental_assessment_phase2_stage1_project_point evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 55 days before the data update on 2026-10-27
Location details
- Coordinates
- 36.50965, 102.00727
- Geometry licence
- all-rights-reserved
- Use scope
- Project locator
- Scope class
- official_environmental_assessment_phase2_stage1_project_point
- Authority
- Official source
- Source entity
- Project
- Method
- haidong_government_eia_project_center_coordinate
- Derivation
- official_dms_coordinate_to_point
- Precision scope
- The point is the official EIA project-center coordinate for Phase 2 Stage 1 and locates the named Phase 2 build. It is not a surveyed entrance, parcel centroid, campus boundary, building footprint, or current-work extent.
- Horizontal uncertainty
Not reported
The EIA reports a project-center coordinate but no bounded horizontal-accuracy or survey-method statement.
- Geometry evidence
- e702223c
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report - China Mobile (Qinghai Haidong) Data Center Phase 2 Stage 1 Archived copy | Haidong Municipal People's Government Government record | Geometry identity context, Geometry | all-rights-reserved | Haidong Municipal People's Government | 17b3d141857a4b0dcc92c59bf35a6349bf844525f7cd9c6d470b22ee655d9c2eRetained source material; see source provenance | ||
| Haidong Industrial Park management committee news: flood-safety inspection of eight sites, including the China Mobile data-centre 110 kV substation construction site (27 August 2026) Archived copy | Haidong Industrial Park / Haidong Hehuang New Area Management Committee Government record | Grid connection context | all-rights-reserved | Haidong Industrial Park / Haidong Hehuang New Area Management Committee | 4eb51c3669c38d1b08ad7a68d05ee0d01e0c251bbe3ea3e59bd8e55a46f109ddRetained source material; see source provenance | ||
| Haidong mayor visits computing-industry construction sites Archived copy | Huzhu County People's Government Government record | Source location context, Physical status | all-rights-reserved | Huzhu County People's Government | 0c6f983f91c9f2804287c2cbd8420c6006af2f500cb2b265aebb1d1a4bb2c9baRetained source material; see source provenance | ||
| Qinghai governor visits China Mobile Plateau Big Data Center Phase 2 construction site on September 2 Archived copy | Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center) Government record | Physical status | all-rights-reserved | Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center) | 852ccbf74a175b96736b70f24d379772d4c9424efb55881066b08d70618f04e8Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). China Mobile Plateau Big Data Center Haidong [site vcc-site-f1171e4b8e247993d773]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1171e4b8e247993d773/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction