Equinix BG2 Bogotá Data Center

Announced Operational

Colombia · 2 projects · Last reported

Summary

Equinix BG2 Bogotá — Phase 1 (first 550 cabinets), existing data-centre operations

Equinix's press release of 20 August 2026 describes BG2 as its existing IBX data centre in Bogotá: BG2 was announced in 2022 with US$45 million, 'La primera fase de la instalación incorporó 550 gabinetes', and the new US$28 million second phase of 550 cabinets will double 'la capacidad disponible en el sitio'; customers reach international routes through Equinix's Bogotá facilities. This records the first phase as operating on 20 August 2026, the release date, as a publication-normalised observation; it is not an opening, inspection or commissioning date, which the release does not give. The 550 cabinets are the operator's first-phase capacity; occupancy, IT load in MW and the second phase's progress are not established. evidence

Equinix, Inc. · published 2026-08-20

Equinix BG2 Bogotá — Phase 2 capacity expansion

On August 20, 2026, Equinix announced a US$28 million second phase for its IBX BG2 data centre in Bogotá. The phase adds 550 cabinets and doubles the site's capacity. The release states that BG2 was announced in 2022 with a US$45 million investment and that its first phase provided 550 cabinets. It gives no construction start, permit, completion or opening date for the second phase, so the expansion is recorded as announced only. evidence

Equinix, Inc. · published 2026-08-20

Location

The interactive map needs JavaScript. Display anchor: 4.67492, -74.15644 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Equinix BG2 Bogotá — Phase 1 (first 550 cabinets), existing data-centre operations

Operational last observed as of · Authoritative status update

Equinix's Latin America press-release list. Its newest entries are 'Equinix lanza centros de innovación para acelerar el despliegue de infraestructura de IA empresarial' (Oct 21, 2026), two product releases of Sep 2, 2026 and the BG2 expansion release (Aug 20, 2026); no release after 20 August 2026 concerns BG2, Bogotá or Colombia. evidence

Equinix, Inc. · publication date not stated

Equinix's newest Latin America-list release (21 October 2026) on AI innovation centres. It names no Bogotá, Colombian, Chilean or Peruvian facility and reports no change to BG2. evidence

Equinix, Inc. · published 2026-10-21

Companies
  • Operator: Equinix, Inc. (current) evidence
Source and location review
Status source
Equinix invierte US$28 millones para ampliar la capacidad de su centro de datos BG2 en Bogotá (Equinix press release, 20 August 2026) evidence row
Equinix, Inc. · published 2026-08-20 · Company disclosure
Locator
Campus locator · Official source · operator_published_facility_reference_point evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 68 days before the data update on 2026-10-27

Equinix BG2 Bogotá — Phase 2 capacity expansion

Announced last observed as of · Project announcement

Companies
  • Operator: Equinix, Inc. (intended) evidence
Source and location review
Status source
Equinix invierte US$28 millones para ampliar la capacidad de su centro de datos BG2 en Bogotá (Equinix press release, 20 August 2026) evidence row
Equinix, Inc. · published 2026-08-20 · Company disclosure
Locator
Campus locator · Official source · operator_published_facility_reference_point evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 68 days before the data update on 2026-10-27

Location details
Coordinates
4.67492, -74.15644
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
operator_published_facility_reference_point
Authority
Official source
Source entity
Campus
Method
operator_facility_page_map_script_latitude_longitude_literal_to_point_without_geocoding
Derivation
direct_geometry
Precision scope
Operator-published map marker for the existing IBX BG2 building at Carrera 106 No 15 A25, Manzana 18, in the Zona Franca de Bogotá business complex. It marks the BG2 facility; the second phase's own halls or construction extent are not identified. It is not a cadastral lot, building footprint, entrance or surveyed position, and the source digits do not imply survey accuracy.
Horizontal uncertainty
Not reported

Equinix publishes no datum, survey method or positional accuracy for the facility marker, and the second phase's position within the BG2 site is not published.

Geometry evidence
3bd7718f

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Equinix BG2 Bogotá Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Equinix BG2 Bogotá data centre facility page (Internet Archive copy, 3 October 2026)
Archived copy
Equinix, Inc. (archived by Internet Archive)
Company disclosure
Geometrynot statedall-rights-reservedEquinix, Inc.; Internet Archive Wayback Machine02d86dcf3bad06b90bc8512952d1a69c720a0d8b2a3324a2fa5bcd88fc8727bc
Retained source material; see source provenance
Equinix invierte US$28 millones para ampliar la capacidad de su centro de datos BG2 en Bogotá (Equinix press release, 20 August 2026)
Archived copy
Equinix, Inc.
Company disclosure
Physical status, Operator claimall-rights-reservedEquinix, Inc.3088098ca201ea958696dae536618cc5e82670efdd1135874694602eb37f1afc
Retained source material; see source provenance
Equinix invierte US$28 millones para ampliar la capacidad de su centro de datos BG2 en Bogotá (Equinix press release, 20 August 2026)
Archived copy
Equinix, Inc.
Company disclosure
Project announcement, Operator claimall-rights-reservedEquinix, Inc.50e211fbb83b1ef14edf83ef7c3b2faa0cfd462ea68a0f2438bf3a73089d7a08
Retained source material; see source provenance
Equinix lanza centros de innovación para acelerar el despliegue de infraestructura de IA empresarial (Equinix press release, 21 October 2026)
Archived copy
Equinix, Inc.
Company disclosure
Site and project identityall-rights-reservedEquinix, Inc.19b1d0bd2cc323b6ac5e659f514c53098886d81722d7a99f8a9eb1a1cbb313a0
Retained source material; see source provenance
Equinix newsroom: Latin America press releases (list, captured 26 October 2026)
Archived copy
Equinix, Inc.
Company disclosure
Site and project identitynot statedall-rights-reservedEquinix, Inc.b71876cc0386c0d8cf0618d793a9dfa794c110db969a623122696b19992fb687
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Equinix BG2 Bogotá Data Center [site vcc-site-f5c6fe2a009a33154c02]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f5c6fe2a009a33154c02/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction