GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 1

On 30 September 2026 the Zhongwei Natural Resources Bureau issued the construction-project planning permit (electronic supervision no. 6405022026GG0074699) to Ningxia Wanguo Yunning Data Technology Co., Ltd. for A-zone Phase 1 of the Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park at Xuanhe Town (179,752.78 m2 GFA), published as in effect on 10 October 2026. The 18 September scheme provides machine-room buildings, diesel-generator buildings and a 330 kV substation on 15.3235 ha. No construction start, completion or operation is established; Phase 2 (permit 6405022026GG0075620, same day) is separate scope. evidence

Zhongwei Natural Resources Bureau · published 2026-10-10

GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 2

On 30 September 2026 the Zhongwei Natural Resources Bureau issued the construction-project planning permit (electronic supervision no. 6405022026GG0075620) to Ningxia Wanguo Shuwei Data Technology Co., Ltd. for A-zone Phase 2 of the Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park at Xuanhe Town (193,908.83 m2 GFA), published as in effect on 10 October 2026. The 18 September scheme provides machine-room buildings, an office building, a complex building and diesel-generator buildings on 14.682 ha. No construction start, completion or operation is established; Phase 1 (permit 6405022026GG0074699, same day) is the existing separate project. evidence

Zhongwei Natural Resources Bureau · published 2026-10-10

Location

The interactive map needs JavaScript. Display anchor: 37.36449, 105.48346 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 1

Permitted last observed as of · Development consent

Land-use planning permit 6405022026YG0025654 issued 23 September 2026 to Ningxia Wanguo Yunning Data Technology Co., Ltd. for A-zone Phase 1 at Xuanhe Town (east Sandang Highway; south, west and north open land at issue), about 179,752.78 m2 GFA, real-estate unit 640502105212GB00038W00000000 (the same unit as the construction-project planning permit). evidence

Zhongwei Natural Resources Bureau · published 2026-09-30

Post-issuance publicity (index 640501011/2026-00797, electronic supervision no. 6405022026GG0075620) of the construction-project planning permit issued on 30 September 2026 to Ningxia Wanguo Shuwei Data Technology Co., Ltd. (宁夏万国数卫数据科技有限公司) for A-zone Phase 2 at Xuanhe Town: bounded east by Sandang Highway, north by Wanyun Road and south by the adjoining A-zone land (printed as the Phase 2 land). Total GFA 193,908.83 m2. Real-estate unit 640502105212GB00039W00000000. Identity and boundary context only; Phase 2 is not admitted in this fragment. evidence

Zhongwei Natural Resources Bureau · published 2026-10-10

Land-use planning permit 6405022026YG0024667 issued 23 September 2026 to Ningxia Wanguo Shuwei Data Technology Co., Ltd. for A-zone Phase 2 (east Sandang Highway), real-estate unit 640502105212GB00039W00000000, consecutive with the Phase 1 unit in the same Xuanhe cadastral zone. The page prints the GFA as 1933908.83 m2, an evident typo for the 193,908.83 m2 of the construction-project permit. evidence

Zhongwei Natural Resources Bureau · published 2026-09-30

Scheme board published with Zhongwei NRB pre-approval notice index 640501011/2026-00715 (publicity 18-28 September 2026). Phase 1 at Xuanhe Town, east Sandang Highway; site 15.3235 ha (229.85 mu); machine-room buildings, diesel-generator buildings and a 330 kV substation; GFA 179,752.78 m2; tallest building 27.9 m; builder Ningxia Wanguo Yunning Data Technology Co., Ltd.; designer 中国通信建设集团设计院有限公司. The 1:1000 north-up general plan shows 纬六路 along the south red line and a planned 8 m urban branch road along the north red line. No coordinates are printed (the grid of labels are spot heights). evidence

Zhongwei Natural Resources Bureau · published 2026-09-18

Scheme board published with Zhongwei NRB pre-approval notice index 640501011/2026-00716. Phase 2 at Xuanhe Town, east Sandang Highway; site 220.23 mu (14.68 ha); machine-room, office, complex and diesel-generator buildings; GFA 193,908.83 m2; builder Ningxia Wanguo Shuwei Data Technology Co., Ltd. Used for the site-area check only. evidence

Zhongwei Natural Resources Bureau · published 2026-09-18

Notice dated 20 August 2026 (index /2026-00530) publishing 《中卫数据中心集群宣和片区详细规划(公布稿)》 as an attachment; links the 9 September graphic interpretation. evidence

Zhongwei Data Bureau · published 2026-08-20

Georeferenced imagery used as the registration reference for the Xuanhe detailed-plan land-use map (140 of 158 patch controls, about 5 m RMS image-to-image). The server-returned extent (f=json request, local esri-xuanhe-wide.extent.json, sha256 bb3b602268f0ac4148b2a829f31f24ded1c8579b43a20930813d98b23fc3bf00) is 105.45-105.52E, 37.335646-37.398354N. Not a lifecycle observation. evidence

Esri · publication date not stated

Companies
  • Owner: Ningxia Wanguo Yunning Data Technology Co., Ltd. (宁夏万国云宁数据科技有限公司) (current) evidence
Source and location review
Status source
Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park A-zone Phase 1 evidence row
Zhongwei Natural Resources Bureau · published 2026-10-10 · Government record
Locator
Campus locator · Compiled location reference · official_detailed_plan_road_bounded_parcel_centroid_georeferenced evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 27 days before the data update on 2026-10-27

GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 2

Permitted last observed as of · Development consent

Land-use planning permit 6405022026YG0024667 issued 23 September 2026 to Ningxia Wanguo Shuwei Data Technology Co., Ltd. for A-zone Phase 2 (east Sandang Highway; south, west and north open land at issue), real-estate unit 640502105212GB00039W00000000, consecutive with the Phase 1 unit (GB00038W). The page prints the GFA as 1933908.83 m2, an evident typo for the 193,908.83 m2 of the construction-project permit. Re-captured byte-identical on 2026-10-23T00:10:05Z (local zw-gds-a2-ydxk.html). evidence

Zhongwei Natural Resources Bureau · published 2026-09-30

Scheme board (pre-approval publicity 18-28 September 2026; builder Ningxia Wanguo Shuwei Data Technology Co., Ltd.; designer China Communication Construction Group Design Institute Co., Ltd. (中国通信建设集团设计院有限公司)) for A-zone Phase 2 at Xuanhe Town, east of Sandang Highway: 14.682 ha (220.23 mu); machine-room buildings (机房楼), office building, complex building, diesel-generator buildings, underground water tanks and pump rooms; GFA 193,908.83 m2; the tallest building is a machine-room building (27.9 m); the aerial rendering marks the Phase 1 area (一期区域) beside it. Rehashed on 23 October 2026 (sha256 unchanged). evidence

Zhongwei Natural Resources Bureau · published 2026-09-18

Companies
  • Owner: Ningxia Wanguo Shuwei Data Technology Co., Ltd. (宁夏万国数卫数据科技有限公司) (current) evidence
Source and location review
Status source
Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park A-zone Phase 2 evidence row
Zhongwei Natural Resources Bureau · published 2026-10-10 · Government record
Locator
Campus locator · Compiled location reference · official_detailed_plan_road_bounded_parcel_centroid_georeferenced evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 27 days before the data update on 2026-10-27

Location details
Coordinates
37.36449, 105.48346
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_detailed_plan_road_bounded_parcel_centroid_georeferenced
Authority
Compiled location reference
Source entity
Campus
Method
xuanhe_detailed_plan_p4_land_use_map_affine_registered_to_esri_world_imagery_140_patch_ncc_controls_parcel_area_centroid
Derivation
georeferenced_source_map
Precision scope
Area centroid of the one parcel on the official Xuanhe detailed-plan land-use map bounded by Jingsan Road (west), Wanyun Road (north), the Sandang Highway corridor (east) and Weiliu Road (south), which the A-zone Phase 1 (south half, to Weiliu Road) and Phase 2 (north half, to Wanyun Road) permits jointly describe. The map raster (about 6.5 m per px) is registered to Esri World Imagery with 140 patch controls (about 5 m RMS image-to-image). Locates the two-phase A-zone campus; not the Phase 1 half, a building footprint, entrance, surveyed boundary or construction extent. The traced parcel is 29.91 ha with vertices up to about 400 m from the point.
Horizontal uncertainty
Not reported

The plan publishes no coordinates, datum or survey accuracy: the point rests on a 6.5 m per px planning raster registered to Esri World Imagery whose acquisition date and absolute accuracy are not stated. Registration residuals (about 5 m RMS, 15.5 m max; 27 m when extrapolating from the north half to the south half) measure only the image-to-image fit; manual parcel tracing adds about 1 px. Estimated within roughly 50 m of the parcel centroid; decimal places are arithmetic precision. Buildings may lie up to about 400 m from the point.

Geometry evidence
e9594487

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone (Xuanhe)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Esri World Imagery export: Zhongwei data-centre cluster Xuanhe area (EPSG:4326, 105.450-105.520E, 37.336-37.398N as returned)
Archived copy
Esri
Other
Site and project identitynot statedEsri World Imagery terms of use; not redistributedEsri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)9b076ed52edc6218442bf132890fb0d8cf4cb2bc7fdec08b93108798622d1470
Retained source material; see source provenance
Plan board: Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park A-zone Phase 1 scheme, pre-approval publicity
Archived copy
Zhongwei Natural Resources Bureau
Government record
Site and project identityall-rights-reservedZhongwei Natural Resources Bureau237ecb0c3979890b4c1f87f6f34e12704644d159ac4368df14cd54dc999b724b
Retained source material; see source provenance
Plan board: Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park A-zone Phase 2 scheme, pre-approval publicity
Archived copy
Zhongwei Natural Resources Bureau
Government record
Site and project identityall-rights-reservedZhongwei Natural Resources Bureau1cabfb667b39e8e02160d1f0b07ee5639026175ff69093054a7d1914ac547ab9
Retained source material; see source provenance
Zhongwei Data Bureau notice on publishing the Xuanhe Area Detailed Plan (published version)
Archived copy
Zhongwei Data Bureau
Government record
Site and project identityall-rights-reservedZhongwei Data Bureau (中卫市数据局)afd393c2755b91cdbb89596138df799737dc6bcece2fa8c7814fc8ddbeecda3c
Retained source material; see source provenance
Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park A-zone Phase 1
Archived copy
Zhongwei Natural Resources Bureau
Government record
Development consent, Owner claimall-rights-reservedZhongwei Natural Resources Bureauaa6ae62b7e079f32a55c4ab5deecf3e7f82c4fea7b8e246c64083eb68c8b19d5
Retained source material; see source provenance
Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, Wanguo Data Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park A-zone Phase 2
Archived copy
Zhongwei Natural Resources Bureau
Government record
Site and project identity, Development consent, Owner claimall-rights-reservedZhongwei Natural Resources Bureaucef7292093d108647ec01d68002c679bfa8982b346d8b93fe68b426a7b09196d
Retained source material; see source provenance
Zhongwei Natural Resources Bureau post-issuance notice: land-use planning permit, Wanguo Data Zhongwei A-zone Phase 1
Archived copy
Zhongwei Natural Resources Bureau
Government record
Site and project identityall-rights-reservedZhongwei Natural Resources Bureau58877e2a35dbb0d492567b423fa0b92f9b9c4d7f8190a5e8955c8da0b41b62cf
Retained source material; see source provenance
Zhongwei Natural Resources Bureau post-issuance notice: land-use planning permit, Wanguo Data Zhongwei A-zone Phase 2
Archived copy
Zhongwei Natural Resources Bureau
Government record
Site and project identityall-rights-reservedZhongwei Natural Resources Bureaue224ccc251ca915589f95e9950404e82dd624216d7481989087d00614cab5f9a
Retained source material; see source provenance
中卫数据中心集群宣和片区详细规划(公布稿)— Zhongwei Data Center Cluster Xuanhe Area Detailed Plan (published version)
Archived copy
Zhongwei Data Bureau
Government record
Site and project identity, Geometryall-rights-reservedZhongwei Data Bureau (中卫市数据局)7d0c7a664373bf609305b1862393ea7a7e11c3640949cb87cdddd00e04134991
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone (Xuanhe) [site vcc-site-f6ace3da50c7c2c3c50e]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6ace3da50c7c2c3c50e/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction