VNET Ulanqab Zero-Carbon Computing Center — building A1 mechanical, electrical and fit-out works

On 24 October 2026 CSCEC reported that China Construction Second Engineering Bureau, the M&E general contractor for building A1 of VNET's Ulanqab zero-carbon intelligent computing center, has carried out the installation of low-voltage, HVAC, plumbing, electrical, interior fit-out and roof steel-structure works for the building. It describes A1 as not yet completed: once built, the project will advance the zero-carbon centre. The status is A1's mechanical, electrical and fit-out stage as of the report date. Completion, commissioning tests, final acceptance and operation of A1 are not reported and not asserted. No capacity is given for A1. The neighbouring Phase 1 A2 contract, reported in the same item at final acceptance, is the separate existing project and is not included. evidence

China State Construction Engineering Corporation · published 2026-10-24

VNET Ulanqab Zero-Carbon Computing Center — Phase 1 A2

VNET’s commercial zero-carbon computing campus is in Yiwutang Industrial Park, Ulanqab. On 24 October 2026, CSCEC reported that Phase 1 building A2’s mechanical and electrical works had entered final acceptance. China Construction Eighth Engineering Bureau is delivering the project, intended to provide computing capacity and backup services to the Beijing–Tianjin–Hebei region. The report does not confirm completed acceptance or operation. evidence

China State Construction Engineering Corporation · published 2026-10-24

Location

The interactive map needs JavaScript. Display anchor: 40.95106, 113.25970 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

VNET Ulanqab Zero-Carbon Computing Center — building A1 mechanical, electrical and fit-out works

MEP / electrical last observed as of · Authoritative status update

Companies
  • Operator: VNET Group (世纪互联) (intended) evidence
Source and location review
Status source
CSCEC reports current data-centre construction in Ulanqab evidence row
China State Construction Engineering Corporation · published 2026-10-24 · Company disclosure
Locator
Campus locator · Compiled location reference · official_campus_substation_incoming_line_endpoint evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 3 days before the data update on 2026-10-27

VNET Ulanqab Zero-Carbon Computing Center — Phase 1 A2

Under construction last observed as of · Authoritative status update

The contractor’s tender identifies the zero-carbon base property south of Pingzan Street, west of Jing’an South Road, north of Weisi Road and east of Jian’an South Road. Phase is not specified in this procurement document. evidence

Beijing Urban Construction No.7 Construction Engineering Co., Ltd. · published 2026-05-18

Companies
  • Operator: VNET Group (世纪互联) (intended) evidence
Source and location review
Status source
CSCEC reports current data-centre construction in Ulanqab evidence row
China State Construction Engineering Corporation · published 2026-10-24 · Company disclosure
Locator
Campus locator · Compiled location reference · official_campus_substation_incoming_line_endpoint evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 3 days before the data update on 2026-10-27

Location details
Coordinates
40.95106, 113.25970
Geometry licence
public-record-source-terms
Use scope
Campus locator
Scope class
official_campus_substation_incoming_line_endpoint
Authority
Compiled location reference
Source entity
Campus
Method
Government_EIA_user_substation_eastern_incoming_line_endpoint_DMS_to_decimal_without_datum_shift_with_primary_plan_and_independent_satellite_pattern_crosscheck
Derivation
coordinate_transform
Precision scope
Campus marker at the published eastern feeder endpoint of the dedicated Zhilian No.1 substation on the north edge of the VNET zero-carbon base property, immediately south of Pingzan Street. It locates the named campus, not the A2 building, campus centroid, boundary, entrance or active-work footprint.
Horizontal uncertainty
Not reported

The EIA publishes milliarcsecond coordinate digits but no explicit datum or positional accuracy. Values are converted from DMS without a datum shift; their interpretation on a WGS84 map is corroborated by the same physical pattern in satellite imagery, not by a datum declaration. This is a campus-level power-intake anchor; A2’s distance from it is unknown.

Geometry evidence
b34dd4ad

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for VNET Ulanqab Zero-Carbon Computing Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
CSCEC reports current data-centre construction in Ulanqab
Archived copy
China State Construction Engineering Corporation
Company disclosure
Physical status, Operator claimall-rights-reservedChina State Construction Engineering Corporationcd0b51c24b1c8cd1c5c9405ff80593523844efcc497f07c37035d1ec5c8fd0f8
Retained source material; see source provenance
Environmental impact report: Wulanchabu Zhilian Cloud Technology Zhilian 220kV transmission lines
Archived copy
Inner Mongolia Department of Ecology and Environment; applicant Wulanchabu Zhilian Cloud Technology Co., Ltd.
Environmental assessment document
Geometrypublic-record-source-termsInner Mongolia Department of Ecology and Environment; applicant Wulanchabu Zhilian Cloud Technology Co., Ltd.ae01c3112f8987e470dd81246eaaf8dcf664ad48ee7b82db69755072cc67098e
Retained source material; see source provenance
Esri World Imagery EPSG:4326 export around VNET Yiwutang zero-carbon campus
Archived copy
Esri and World Imagery contributors
Map feature
Site and project identitynot statedall-rights-reservedEsri and World Imagery contributors9e6173280df4efc00f42060cff6410656b49987bdf73231df3c17d837ec05930
Retained source material; see source provenance
VNET Ulanqab Zero-Carbon Computing Center base: putty and coating tender
Archived copy
Beijing Urban Construction No.7 Construction Engineering Co., Ltd.
Company disclosure
Site and project identityall-rights-reservedBeijing Urban Construction No.7 Construction Engineering Co., Ltd.dce27e181d4cee69028c13626adddf54d2f58828ed42e7b432d901eaa709f521
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). VNET Ulanqab Zero-Carbon Computing Center [site vcc-site-f76a80176723cddb724a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f76a80176723cddb724a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction