Data Center Nostrum Evergreen (DC Badajoz), Plataforma Logística del Suroeste Europeo
Announced
Spain · 1 project · Last reported
Summary
Data Riocaya, SLU plans the Data Center Nostrum Evergreen (DC Badajoz) in the Plataforma Logística del Suroeste Europeo, Badajoz. On 15 September 2026 the state gazette opened public information on its application for the SET Enlace 400/220 kV substation and a 292 m 400 kV line from Red Eléctrica's Riocaya substation, whose purpose is to connect "the future Data Center Nostrum Evergreen of 300 MW" to the transmission grid; the data centre itself is processed in separate files. On 7 September 2026 the regional gazette had published prior authorisation of its 220 kV consumption infrastructure. Neither record is development consent for the data centre, and no physical work is established. evidence
Agencia Estatal Boletín Oficial del Estado · published 2026-09-15
Location
The interactive map needs JavaScript. Display anchor: 38.90618, -7.00101 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Data Center Nostrum Evergreen (DC Badajoz) - planned data centre with 300 MW grid access
Announced last observed as of · Project announcement
DOE no. 173 of 7 September 2026: the regional Directorate-General for Industry, Energy and Mines grants Data Riocaya, SLU prior administrative authorisation (not construction authorisation) for the regional-competence electrical consumption infrastructure of the Data Center Nostrum Evergreen (DC Badajoz): the 220 kV yard of the 400/220 kV link substation, two 220 kV underground supply lines of 3,342.74 m and 3,276.91 m to the SE DC Badajoz 220/20 kV substation, and that substation (six 110/150 MVA transformers plus two future), sited "en plataforma logística, 06006", Badajoz. It recites that Decreto 151/2025 declared the data-centre project a Proyecto Empresarial de Interés Autonómico and that the environmental body will report on the global Data Center Nostrum Evergreen project. evidence
Diario Oficial de Extremadura (Junta de Extremadura) · published 2026-09-07
DOE no. 221 of 17 November 2025: the Junta de Extremadura declares the project presented by Data Riocaya, SLU (application of 29 May 2025) for a new-generation data centre in the Plataforma Logística del Suroeste Europeo, Badajoz, designed for grid access of up to 300 MW electrical, a Proyecto Empresarial de Interés Autonómico, with planned investment of EUR 1,913,163,000 and 330 annual work units of employment. The data centre is to be located on plots L.I-12, L.I-13, C.E.S-2, C.E.S-4 and C.E.S-4A of the platform, 222,735 m2 in total; associated works are an adjacent 220/30 kV substation, a 400/220 kV link substation and high-voltage lines. The qualification carries a declaration of public utility and urgent occupation for the 220 kV link-substation yard and underground supply line. evidence
Diario Oficial de Extremadura (Junta de Extremadura) · published 2025-11-17
- Companies
- Owner: Data Riocaya, SLU (intended) evidence
Source and location review
- Status source
- BOE notice: public information on the SET Enlace 400/220 kV substation and 400 kV supply line SE Riocaya - SET Enlace for the connection of the Data Center Nostrum Evergreen, Badajoz evidence row
Agencia Estatal Boletín Oficial del Estado · published 2026-09-15 · Government record - Locator
- Campus locator · Compiled location reference · official_decision_named_cadastral_parcel_union_centroid evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 42 days before the data update on 2026-10-27
Location details
- Coordinates
- 38.90618, -7.00101
- Geometry licence
- public-sector-information
- Use scope
- Campus locator
- Scope class
- official_decision_named_cadastral_parcel_union_centroid
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- catastro_inspire_epsg25829_five_decree_plot_parcel_union_area_centroid_pyproj_to_wgs84
- Derivation
- coordinate_transform
- Precision scope
- Area centroid of the five Plataforma Logística del Suroeste Europeo plots (L.I-12, L.I-13, C.E.S-2, C.E.S-4 and C.E.S-4A; 22.27 ha) that Decreto 151/2025 names as the data-centre site. It locates the declared data-centre land, not a building footprint, the SE DC Badajoz or SET Enlace substations, an entrance or a surveyed boundary.
- Horizontal uncertainty
Not reported
Catastro publishes no positional accuracy for these boundaries. The point is a derived interior anchor of a 22.3 ha declared site whose farthest vertex is about 414 m away; no building layout is published.
- Geometry evidence
- a1dbaa36
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| BOE notice: public information on the SET Enlace 400/220 kV substation and 400 kV supply line SE Riocaya - SET Enlace for the connection of the Data Center Nostrum Evergreen, Badajoz Archived copy | Agencia Estatal Boletín Oficial del Estado Government record | Project announcement, Owner claim | public-sector-information | Agencia Estatal Boletín Oficial del Estado | 518ce375bc33565319b0a33cb628aaed6557ee4a23667bcb76076cb2c10a4919Retained source material; see source provenance | ||
| Catastro coordinate lookup at the area centroid of the five Data Center Nostrum Evergreen plots (parcel 3485901PD7038E, PL Plataforma Logística, Badajoz) Archived copy | Dirección General del Catastro Government record | Geometry | not stated | public-sector-information | Dirección General del Catastro | 5edf965936507235654c57a1c396039e5aaac97030c5dd7fa34d3ccff5e369c8Retained source material; see source provenance | |
| DOE: Decreto 151/2025, de 11 de noviembre, declaring the Data Riocaya, SLU sustainable data-computing and AI centre in Badajoz a Proyecto Empresarial de Interés Autonómico Archived copy | Diario Oficial de Extremadura (Junta de Extremadura) Government record | Site and project identity | public-sector-information | Junta de Extremadura, Diario Oficial de Extremadura | f2db0b0ecc5ffc14d368a61e6ac2d9946c96a7a6b9b88c6bd2b46b7c184ac7c6Retained source material; see source provenance | ||
| DOE: Resolution of 26 August 2026 granting prior administrative authorisation to Data Riocaya, SLU for the "Infraestructuras eléctricas de consumo del Data Center Nostrum Evergreen (DC Badajoz)" (file 06/AT-2025/26906) Archived copy | Diario Oficial de Extremadura (Junta de Extremadura) Government record | Site and project identity | public-sector-information | Junta de Extremadura, Diario Oficial de Extremadura | 232b488e26b170369fc45d892cb51e2778ebf47a9b6068c73d5dcb2af32ef698Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). Data Center Nostrum Evergreen (DC Badajoz), Plataforma Logística del Suroeste Europeo [site vcc-site-fe2aebe364c3b7dd4ae8]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe2aebe364c3b7dd4ae8/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction