2026-08-20 · 14 sites

Atlas data archived on 2026-08-20, with additions and corrections listed below.

Summary #

Updated
Observation dates
to
Counts
14 sites, 15 projects, 10 countries, 36 evidence rows
Previous snapshot
2026-08-20 · 11 sites
Manifest SHA-256
8a17e9e4d126bc210a34c2b9a0bd2fd1737402ca9d1069dd5411067831e6d1ac
Files
Download this snapshot · GitHub

Changes from the previous snapshot #

3 sites added; 3 projects added; 5 projects changed; 7 evidence rows added; 5 evidence rows changed; 1 column added or removed.

Columns #

TableColumnChange
projectsrole_claims_jsonadded

Sites added (3) #

Fields changed (11) #

Values that changed between the two snapshots. The earlier data remains available.

TableRecordFieldBefore → after
projectsCDC Eastern Creek EC5 Current Build
2e2b9d40-5024-5e6d-bbb2-56a8b16b9c16
operatorCDC Data Centres → empty
projectsAVAIO Digital Taurus Phase One Current Campus Build
37e33657-b788-57e6-98f2-b78834cdecda
workloads_jsonJSON value changed (see the CSV files of both snapshots)
projectsCDC Eastern Creek EC6 Current Build
5c366d64-4bb5-5c28-ab62-ec20d60fb31a
operatorCDC Data Centres → empty
projectsAST Jāņciems Fit-out After Building Completion
98e47ac5-8576-53f7-ab71-9f3d683b5ec5
ownerAS "Augstsprieguma tīkls" → empty
projectsAST Jāņciems Fit-out After Building Completion
98e47ac5-8576-53f7-ab71-9f3d683b5ec5
operatorAS "Augstsprieguma tīkls" → empty
projectsEdged Chicago ORD01-2
b8399bc6-5c72-5627-a035-4fea208cd287
workloads_jsonJSON value changed (see the CSV files of both snapshots)
evidenceAbout Akashi
1337f6ef-1e09-5b6e-a1e0-55fbdcf95bf3
roles_jsonJSON value changed (see the CSV files of both snapshots)
evidenceAVAIO Digital Breaks Ground on $6 Billion Brandon Data Center Campus; Leading Mississippi Contractor Begins Site Work
1f776e1f-3f79-53d1-880c-e90b0fd8b958
roles_jsonJSON value changed (see the CSV files of both snapshots)
evidenceBrandon, Mississippi Campus
68b10772-f3b4-5152-bffe-23d34c4f8477
roles_jsonJSON value changed (see the CSV files of both snapshots)
evidenceEdged US ‘Tops Out’ Second Sustainable Data Center on Edged Chicago Campus
781c461b-14cf-53e1-9e40-5c39a3d589b5
roles_jsonJSON value changed (see the CSV files of both snapshots)
evidenceDatu centrs POZITRONS
9590b8c5-a6cb-5c06-bd54-48063d19de70
roles_jsonJSON value changed (see the CSV files of both snapshots)

Cite this snapshot #

Kyars, K. (2026). Data Center Atlas (2026-08-20) [Data set]. https://kiankyars.github.io/datacenter-atlas/downloads/2026-08-20-preview-v0.3/