2026-08-20 · 14 sites
Atlas data archived on 2026-08-20, with additions and corrections listed below.
Summary #
- Updated
- Observation dates
- to
- Counts
- 14 sites, 15 projects, 10 countries, 36 evidence rows
- Previous snapshot
- 2026-08-20 · 11 sites
- Manifest SHA-256
8a17e9e4d126bc210a34c2b9a0bd2fd1737402ca9d1069dd5411067831e6d1ac- Files
- Download this snapshot · GitHub
Changes from the previous snapshot #
3 sites added; 3 projects added; 5 projects changed; 7 evidence rows added; 5 evidence rows changed; 1 column added or removed.
Columns #
| Table | Column | Change |
|---|---|---|
| projects | role_ | added |
Sites added (3) #
- KAO Data Harlow Campus vcc-site-c48f4a7325dfc30566cd
- Scala Huechuraba Campus vcc-site-942a847c35703b15ea18
- Scala Lampa Campus vcc-site-443900b22a794305df17
Fields changed (11) #
Values that changed between the two snapshots. The earlier data remains available.
| Table | Record | Field | Before → after |
|---|---|---|---|
| projects | CDC Eastern Creek EC5 Current Build 2e2b9d40- | operator | CDC Data Centres → empty |
| projects | AVAIO Digital Taurus Phase One Current Campus Build 37e33657- | workloads_ | JSON value changed (see the CSV files of both snapshots) |
| projects | CDC Eastern Creek EC6 Current Build 5c366d64- | operator | CDC Data Centres → empty |
| projects | AST Jāņciems Fit-out After Building Completion 98e47ac5- | owner | AS "Augstsprieguma tīkls" → empty |
| projects | AST Jāņciems Fit-out After Building Completion 98e47ac5- | operator | AS "Augstsprieguma tīkls" → empty |
| projects | Edged Chicago ORD01-2 b8399bc6- | workloads_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | About Akashi 1337f6ef- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | AVAIO Digital Breaks Ground on $6 Billion Brandon Data Center Campus; Leading Mississippi Contractor Begins Site Work 1f776e1f- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Brandon, Mississippi Campus 68b10772- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Edged US ‘Tops Out’ Second Sustainable Data Center on Edged Chicago Campus 781c461b- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Datu centrs POZITRONS 9590b8c5- | roles_ | JSON value changed (see the CSV files of both snapshots) |
Cite this snapshot #
Kyars, K. (2026). Data Center Atlas (2026-08-20) [Data set]. https://kiankyars.github.io/datacenter-atlas/downloads/2026-08-20-preview-v0.3/