HUMAIN Al-Saad hyperscale AI data centre campus

Site records

HUMAIN, the AI company owned by Saudi Arabia's Public Investment Fund, plans a 6 GW hyperscale AI data centre campus on a 24 square kilometre site in the Al-Saad area of east Riyadh, to be built in two phases across six plots. HUMAIN tendered the campus enabling infrastructure in May 2026, covering high-voltage distribution, two substations, a 2,000 MVA bulk supply point, water, sewage, roads and fibre. In September 2026 Dammam-based Al-Yamama was reported as the selected contractor under an early contractor involvement process. Neither the contract value nor the total project cost has been disclosed.

This record reports announced as of 2026-09-27. MEED; Enterprise AM; Construction Review Online

Location: Riyadh, Riyadh Province, SA. Sources place the site in the Al-Saad area of east Riyadh. OpenStreetMap Nominatim did not resolve that district, so coordinates are the Riyadh city centroid from Nominatim. MEED; MEED; Enterprise AM; Construction Review Online

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity6,000 MWPlanned · Campus · Unspecified2026-09-24MEED; MEED; Enterprise AM
Power capacity1,000 MWPlanned · Phase · Unspecified · Each of six plots2026-09-24MEED says the campus spans six plots delivered in two phases, each with 1 GW; the figure is read as per plot because six plots of 1 GW match the 6 GW total. Enterprise AM uses similar wording.MEED; MEED
Land area2,400 hectaresReported · Campus2026-09-24Reported as 24 square kilometres, converted exactly to hectares.MEED; MEED; Enterprise AM; Construction Review Online

Companies and organizations

NameRoleNotesSources
HUMAINDeveloperClient for the campus infrastructure works; supported by advisers Hatch, Egis and JLL.MEED; MEED; Enterprise AM
Al-Yamama Company for Trading & ContractingBuilderSelected for the campus enabling infrastructure package under an early contractor involvement process. Construction Review notes that this is not yet a final appointment for all construction works.MEED; Enterprise AM; Construction Review Online

Timeline

DateEventActual or plannedNotesSources
2026-05OtherActualHUMAIN tendered the campus enabling infrastructure package, with proposals due on 8 May.MEED; Enterprise AM
2026-09OtherActualAl-Yamama reported as winner of the enabling infrastructure contract.MEED; Enterprise AM; Construction Review Online

Power supply

TypeDescriptionSources
GridEnabling works include a 380/132/33 kV distribution network, two substations of 500 MVA and 200 MVA, and a 2,000 MVA bulk supply point.MEED; MEED; Enterprise AM

Status is announced because only site enabling works have been contracted; no source reviewed reports data hall construction or a delivery date. MEED coverage is partly paywalled, and the other reports appear to draw on it.

Related projects: humain riyadh, humain dammam