ProjectCountryStatusAs of
(仮称)HND12新築工事 — planned Toyosu data-centre buildingJapanAnnounced
(仮称)有明TK2データセンター — planned data-centre buildingJapanAnnounced
(仮称)江東区千石三丁目計画 — planned five-storey data-centre building, Sengoku 3-chome, KotoJapanAnnounced
1623 Farnam — existing carrier-hotel and edge data-centre operationsUnited StatesOperational
192 Narellan Road Data Centre (Project Genesis) — proposed 100 MW two-building data centre (SSD-150514738)AustraliaAnnounced
1G Servers LaSalle Data Center — data-center remodel (City of Phoenix permit 26000895)United StatesCompleted
400 South LaSalle office-to-data-center conversion (Phases 1–3)United StatesPermitted
934 Central Data Center — proposed 384-foot structure with ground-floor retail and a data center (development plan CD-CPC-2026-00074, Ordinance No. 260870)United StatesAnnounced
A100 ROW Liederbach — two new data centres (FRA145/FRA165)GermanyPermitted
Abernathy HPC campus (TeraWulf and Fluidstack joint venture)United StatesUnder construction
Accokeek Center — proposed two-building 590,000 sq ft data center campus (rezoning RC24155981)United StatesAnnounced
ACF CR4 extensionUnited KingdomShell
ACS DC La Puebla data center campusSpainAnnounced
AdaniConneX Hyderabad data centre campusIndiaPartially operational
AdaniConneX Navi Mumbai data centre campusIndiaAnnounced
AdaniConneX Noida data centre campusIndiaPartially operational
AdaniConneX Pune data centre campusIndiaPartially operational
AdaniConneX Pune PNQ04 Current BuildIndiaUnder construction
ADP Appomattox Data Hub — proposed data center facilities (AVAIO Project Hercules, tax parcel 63 A 80)United StatesAnnounced
Aether FR-SXB2 Strasbourg AI FactoryFranceAnnounced
Africa Data Centres JHB1 Midrand — operating facilitySouth AfricaOperational
Agricultural Bank of China Horinger Data Center — newly commissioned data-centre operationsChinaOperational
AI Tech Tomakomai Phase I Foundation WorksJapanUnder construction
AirTrunk HYD1 HyderabadIndiaAnnounced
AirTrunk JHB1MalaysiaPartially operational
AirTrunk JHB2MalaysiaAnnounced
AirTrunk JHB3 Johor BahruMalaysiaAnnounced
AirTrunk JHB4 Johor BahruMalaysiaAnnounced
AirTrunk Kurri Kurri Data CentreAustraliaAnnounced
AirTrunk SYD2 Sydney North — existing hyperscale campus operations (1 Sirius Road)AustraliaOperational
AirTrunk TOK1 Tokyo EastJapanPartially operational
Akashi Astana Phase 1 Current BuildKazakhstanUnder construction
Aker Nscale Korgen AI data centerNorwayAnnounced
Aldington Road Data Centre — proposed two-building 360 MW IT campusAustraliaAnnounced
Aligned Conesville Current Site PreparationUnited StatesSite preparation
Aligned Pataskala Data Center Campus — proposed campusUnited StatesAnnounced
Aligned PHX-05 Data Center — core and shellUnited StatesCompleted
Aligned Project Phoenix / PIT-01 Campus DevelopmentUnited StatesAnnounced
Alphen aan den Rijn Data Center — permitted 8,292 m2 data-centre buildingNetherlandsPermitted
Alter GPU Center Stargard — data processing centre building (building permit 785/2026)PolandAnnounced
Alto Infrastructure SP01 Phase 1 10 MW Critical ITSpainUnder construction
Amazon and STACK campus at Resilient Technology Park, ShreveportUnited StatesAnnounced
Amazon Data Services Ireland Clonshaugh data storage facility — existing Buildings W, X and YIrelandOperational
Amazon Falls Township Active Campus BuildoutUnited StatesUnder construction
Amazon Salem Township Active Campus BuildoutUnited StatesUnder construction
Amazon Web Services Hobart data center campusUnited StatesAnnounced
Amazon Web Services King George County campus (Birchwood site)United StatesProposed
APL Hibikino Data Center — Hibikino-kita first building developmentJapanSite preparation
Apple Prineville Data Center Campus — eastern campus expansion (PRZ 06 development area)United StatesAnnounced
Apple Prineville Data Center Campus — existing operationsUnited StatesOperational
Applied Digital Delta Forge 2United StatesUnder construction
Applied Digital Ellendale 180 MW data-center hosting facility — existing operationsUnited StatesOperational
Applied Digital Jamestown — 106 MW data-center hosting facility, existing operations (APLD Hosting LLC)United StatesOperational
Applied Digital Polaris Forge 1United StatesPartially operational
Applied Digital Polaris Forge 2United StatesUnder construction
Applied Digital Polaris Forge 3United StatesUnder construction
Art Data Centres Ennis campusIrelandAnnounced
Ascenty Sumaré 3BrazilUnder construction
Ascenty Vinhedo 3BrazilUnder construction
AST Jāņciems Fit-out After Building CompletionLatviaShell
AtlasEdge DUS001 Düsseldorf — operating data centreGermanyOperational
AtlasEdge LEV001 — operating data centreGermanyOperational
AtlasEdge LEV002 — new data centre adjacent to LEV001GermanyUnder construction
AtlasEdge STR001 Stuttgart — operating data centreGermanyOperational
atNorth DEN02 Varde mega siteDenmarkAnnounced
atNorth FIN04 Phase 1FinlandUnder construction
atNorth FIN05 Salo mega siteFinlandAnnounced
atNorth ICE02 Phase 2 ExpansionIcelandUnder construction
atNorth NOR01 Haugaland mega siteNorwayAnnounced
atNorth SWE02 Current DevelopmentSwedenUnder construction
atNorth SWE04 Sollefteå mega siteSwedenAnnounced
AVAIO Digital Leo (Project Leo) — planned AI-ready data center and power campus on 296 acresUnited StatesAnnounced
AVAIO Digital Taurus Phase One Current Campus BuildUnited StatesUnder construction
AWS CAR data centre, Zaragoza - La CartujaSpainAnnounced
AWS Clinton data center (former Delphi plant)United StatesOperational
AWS Didcot North Data Centre Campus (DCA-DCD)United KingdomAnnounced
AWS Fayette County data center siteUnited StatesAnnounced
AWS Lake Anna Technology CampusUnited StatesUnder construction
AWS New Carlisle data center campus (Project Rainier)United StatesPartially operational
AWS PHX065 — two single-storey data-centre buildings under construction (Mesa permits PMT24-15709 and PMT25-13554)United StatesUnder construction
AWS Richmond County data center campusUnited StatesUnder construction
AWS Ridgeway Data Centre, IverUnited KingdomAnnounced
AWS Salem Township Innovation Campus (Susquehanna)United StatesPartially operational
AWS Thane Balkum & Majiwada Data Centre EC 477127 Current BuildIndiaUnder construction
AWS Vicksburg data center campusUnited StatesAnnounced
AWS Walqa Current Data Center BuildSpainUnder construction
Balico gas-powered data center campus, Pittsylvania CountyUnited StatesCancelled
Basis Bay Data Centre — existing colocation data-centre operationsMalaysiaOperational
BDx HKG8 — operating hyperscale data centerHong KongOperational
Beacon AI Centers Heartland campus (Sturgeon County)CanadaProposed
Beacon AI Centers Indus campusCanadaAnnounced
Bell AI Fabric Sherwood campus (Regina area)CanadaUnder construction
Beyond.pl Data Center Campus — existing operations (Data Center 2 and AI Factory)PolandOperational
Bitdeer and Geis Shalersville AI data center campusUnited StatesProposed
Bitdeer Clarington data center siteUnited StatesAnnounced
Bitdeer Fox Creek energy and computing facilityCanadaUnder construction
Bitdeer Massillon 2026 Fire-Damaged Buildings ReconstructionUnited StatesUnder construction
Bitdeer Weathersfield (Niles) development siteUnited StatesAnnounced
Bitdeer Wenatchee 2026 AI Conversion Site PreparationUnited StatesSite preparation
Bitter Blue Building 2 (TABS Building B) — new two-storey single-tenant data center (City of San Antonio permit COM-BLG-PMT26-40200489)United StatesPermitted
Bitzero Namsskogan 2026 Power Infrastructure ExpansionNorwayFoundations
Boda Langfang No. 2 Phase 1ChinaOperational
Boda Langfang No. 2 Phase 2ChinaCommissioning
Boda Qianhai No. 1 Operating CampusChinaOperational
Bogle Drive Data Center Facility — two two-storey data centre buildings (site plan SP-2024-00038, 14901 Bogle Dr)United StatesPermitted
BONC Horinger Intelligent Computing Centre — existing operationsChinaOperational
Borden Data Center — proposed commercial data centre with on-site power generation (TCEQ air permit 185712 pending)United StatesAnnounced
Borealis Blönduós Expansion Current BuildIcelandUnder construction
Box2Bit Epilon data center campus (Épila)SpainAnnounced
Bridge Data Centres Chonburi hyperscale campusThailandAnnounced
Bridge Data Centres MY06, Sedenak Tech ParkMalaysiaOperational
Bridge Data Centres MY07, Ulu TiramMalaysiaPartially operational
Brookfield AI center, SträngnäsSwedenAnnounced
Brookhollow Avenue Data Centre Expansion — proposed 118.3 MW buildingAustraliaAnnounced
Building CLB4 — 288,000 sq ft alteration works (Columbus permit ALTC2502418, final inspection approved)United StatesCompleted
Bulk DK01 Current New Building ConstructionDenmarkUnder construction
Bulk N01 Current New Facility ConstructionNorwayUnder construction
Campo de Datos Lampa — hyperscale data-centre proposalChileAnnounced
Campus AI FoujuFranceUnder construction
CapitaLand DC Chennai Current Facility BuildIndiaUnder construction
CapitaLand DC ITPH Hyderabad Current Facility BuildIndiaUnder construction
CapitaLand DC Navi Mumbai Tower 1IndiaOperational
CapitaLand DC Navi Mumbai Tower 2IndiaUnder construction
Carbon Node East Data Center Campus (Nesquehoning) — proposed campusUnited StatesAnnounced
Cavour Hyperscale Campus (Trino)ItalyAnnounced
CDC Beard BE1 Current Data Center BuildAustraliaOperational
CDC Brooklyn Remaining Facilities Current BuildAustraliaUnder construction
CDC Eastern Creek EC5 Current BuildAustraliaOperational
CDC Eastern Creek EC6 Current BuildAustraliaOperational
CDC Gregadoo (Ashfords Road Data Centre) — proposed four-building campusAustraliaAnnounced
CDC Laverton Current BuildAustraliaUnder construction
CDC Maddington Current BuildAustraliaShell
CDC Marsden Park Early ConstructionAustraliaUnder construction
CEC Tokyo No.2 Existing Operations at Sunshine 60JapanOperational
Centro de Almacenamiento de Datos Puente Alto — initial proposalChileAnnounced
Centro de Almacenamiento de Datos San Antonio — four-building campus proposalChileAnnounced
Charlton data centre proposal - 100,000 sq m GEA data centre with ancillary offices and substations (Royal Greenwich EIA scoping 26/2370/EIA)United KingdomAnnounced
Chief Telecom LY2 AI Data Center — current operationsTaiwanOperational
China Mobile (Ningxia Zhongwei) Data Center B-Zone Phase 2 — B07 Data CentreChinaPermitted
China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus — D07–D10 Machine-Room BuildingsChinaPermitted
China Mobile Beijing International Information Port No6 / C18 Data Center DevelopmentChinaAnnounced
China Mobile GBA (Shaoguan) Data Center — C/D buildings (Phase 2)ChinaAnnounced
China Mobile GBA (Shaoguan) Data Center — Phase 1 A/B buildingsChinaCompleted
China Mobile Hohhot B25/B27 ExpansionChinaCompleted
China Mobile Hohhot Data Center — B02 machine building operationsChinaOperational
China Mobile Hohhot Data Center — existing intelligent computing centre operationsChinaOperational
China Mobile Plateau Big Data Center Phase 2 BuildChinaUnder construction
China Telecom Cloud Computing Inner Mongolia Information Park — existing data-centre operationsChinaOperational
China Telecom GBA Integrated Data Center, Zhenjiang Park — Phase 2.1 A7 Intelligent Computing CentreChinaAnnounced
China Telecom Guizhou Information Park B5/B6 Civil WorksChinaCompleted
China Telecom Innovation Incubation (South) Base — AIDC computing infrastructure in Buildings A1, A3 and A4ChinaAnnounced
China Telecom Lingang Information Park Phase 2.1ChinaShell
China Telecom Shaotang Campus DevelopmentChinaAnnounced
China Telecom Wuqing Jing-Jin-Ji — Existing Operational FacilitiesChinaOperational
China Unicom GBA Data Standard Factory — Data Centre 5ChinaAnnounced
China Unicom Langfang Zhi Yun — Existing Operational FacilitiesChinaOperational
China Unicom Ningxia Zhongwei Cloud Data Center — Park No. 2 Data Centre 9 (DC9)ChinaPermitted
China Unicom Tianjin Jing-Jin-Ji Park South Zone DC1 / DC2ChinaOperational
Chindata Hebei Cunrui Base (河北秦淮数据存瑞基地) — Cunrui phases 1-4 existing data-centre operationsChinaOperational
Chirisa Chesterfield Digital Drive Current BuildUnited StatesUnder construction
CIDC Jing-Meng Green Computing Industrial Park — D-Zone DevelopmentChinaUnder construction
CIDC Ulanqab Zero-Carbon Computing Base — existing commercial data-centre operationsChinaOperational
CIDC Zhongwei Green Intelligent Computing Industrial Base (Xuanhe) — Phases 1–2 DevelopmentChinaUnder construction
Cipher Barber Lake data centerUnited StatesUnder construction
Cipher Black Pearl data centerUnited StatesPartially operational
Cipher Digital Black Pearl Phase II Current BuildUnited StatesUnder construction
Cipher Digital Stingray Data Center Current BuildUnited StatesUnder construction
Cloud4Y Marfino Main Building Current ConstructionRussiaUnder construction
CloudHQ GRU Campus (Paulínia)BrazilUnder construction
CloudHQ Project Asahi Technology Campus — planned data-centre buildings at BIG HOP Garden Mall InzaiJapanAnnounced
CloudHQ QRO Campus (Querétaro)MexicoAnnounced
Cologix ASH2 — two-storey data centre under construction (21673 Beaumeade Circle)United StatesUnder construction
Cologix JAX1 — existing data-centre and meet-me-room operationsUnited StatesOperational
Cologix JAX2 — existing data-centre operationsUnited StatesOperational
Cologix MTL10 — existing data-centre operationsCanadaOperational
Cologix MTL8 — existing data-centre operationsCanadaOperational
Cologix MTL9 — existing data-centre operationsCanadaOperational
Cologix TOR4 (Building B) — existing data-centre operationsCanadaOperational
Cologix VAN4 — existing data-centre operationsCanadaOperational
Colovore Alliance Data Center — planned buildingUnited StatesAnnounced
Colovore Hutto Data Center — planned buildingUnited StatesAnnounced
Colovore RNO01 — first data centerUnited StatesOperational
Colovore RNO01 — second data centerUnited StatesUnder construction
Colovore SJC01 and SJC02 — existing data-centre operationsUnited StatesOperational
Colt Frankfurt 3 Current Facility BuildGermanyUnder construction
Colt Inzai Data Centre 4 (Keppel Tokyo Data Centre 3) — existing hyperscale data-centre operationsJapanOperational
Colt London 4 Current Facility BuildUnited KingdomUnder construction
Colt Paris 2 Current Facility BuildFranceUnder construction
Compass Datacenters CLT I — proposed greenfield data-center facility (NC DAQ air-permit application 4900350.26A)United StatesAnnounced
Compass Datacenters Hoffman Estates campusUnited StatesUnder construction
Compass Datacenters Meridian campusUnited StatesUnder construction
Compass DFW III Building 10 — interior/tenant fit-outUnited StatesAnnounced
Compass DFW III Building 8 — interior/tenant fit-outUnited StatesAnnounced
Compass DFW III Building 9 — interior/tenant fit-outUnited StatesAnnounced
Compass El Mirage (PHX2) — 108 MW data-centre campus under developmentUnited StatesUnder construction
Core Scientific Denton data center (CoreWeave)United StatesUnder construction
Core Scientific Hunt County data center siteUnited StatesAnnounced
Core Scientific Muskogee data center campusUnited StatesPartially operational
Core Scientific Pecos data center campusUnited StatesAnnounced
Core Scientific Pecos Initial HDC Current BuildUnited StatesUnder construction
CoreSite DA1 — data center base buildingUnited StatesAnnounced
CoreSite DE3United StatesUnder construction
CoreWeave Kenilworth NEST 11 AI data centerUnited StatesUnder construction
CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse ProjectUnited StatesUnder construction
CRA Prague Gateway DC Current Campus BuildCzechiaUnder construction
Crag Digital Avoca DUB20 — three ICT facility (data centre) buildings with 60 emergency generators (Wicklow 23/72 as amended by 25/60806; EPA IE licence application P1240-01)IrelandAnnounced
Cross Mill Center — two proposed data center buildings (site plan EPLAN-2026-0140)United StatesAnnounced
Crossroads Technology Campus — proposed seven-building data center campus (special use permit SUP26-0003)United StatesAnnounced
Crusoe Abilene AI factory campus for MicrosoftUnited StatesUnder construction
Crusoe and Lancium Childress AI data center campusUnited StatesAnnounced
Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)United StatesPermitted
CSC LUMI-AI Data Center Current BuildFinlandUnder construction
CtrlS Bengaluru Datacenter — existing operationsIndiaOperational
CtrlS Chandanvelly AI-ready data center parkIndiaAnnounced
CtrlS Chennai Datacenter Park — existing operations (two-building park)IndiaOperational
CtrlS Hyderabad Financial District datacenter — existing operations (operator-mapped facility, DC2 or DC3)IndiaOperational
CtrlS Kolkata-DC1 (first phase)IndiaOperational
CtrlS Mumbai Datacenter Campus — existing operations of Mumbai DC1 to DC5IndiaOperational
CtrlS Noida DC1 — existing operationsIndiaOperational
CX Technology Campus - proposed eight-building data centre campus (planning permission in principle application, 29 September 2026)United KingdomAnnounced
CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital RetrofitUnited StatesCompleted
CyrusOne Bosque County data center campus (Thad Hill)United StatesUnder construction
CyrusOne DFW8 interior fit-out (data halls and generator yard)United StatesAnnounced
CyrusOne FRA7 Current Multi-Building DevelopmentGermanyUnder construction
CyrusOne Freestone County data center campusUnited StatesAnnounced
CyrusOne Mesa PHX20 — Shell Building 1, two-storey 243,332 sq ft data hall building under construction (Mesa permit PMT25-13240)United StatesUnder construction
CyrusOne Yorkville Current Site WorkUnited StatesSite preparation
Dansk Data Center 1 Current BuildDenmarkUnder construction
Daou Jukjeon CDC Current BuildKorea, Republic ofUnder construction
Data Center Alto Jahuel Campus Sur — initial data centreChileAnnounced
Data Center D — conversion of an existing building into a data centre with 30 emergency generators (campus expansion, VIA decree DM 592/2025)ItalyAnnounced
Data Center Edificio A and Edificio B — proposed two-building data-centre campus (MASE ID_VIP 13213 / 14760)ItalyAnnounced
Data Center La Pólvora — initial proposalChileAnnounced
Data Center Lo Aguirre — initial proposalChileAnnounced
Data Center MIL03 — proposed single-building data centre (MASE ID_VIP 10873)ItalyAnnounced
Data Center Nostrum Evergreen (DC Badajoz) - planned data centre with 300 MW grid accessSpainAnnounced
Data Center Polpaico Campus Norte — initial data centreChileAnnounced
Data centre "Veronikas" — office building with data centre (building permit BIS-BV-4.1-2026-3712)LatviaPermitted
Data Tank Nordic Utajärvi — four-building data-centre campus (permit 26-0014-RL, Prosessitie)FinlandSite preparation
Data World Matatirtha Core Data Center Current BuildNepalUnder construction
Data4 ATH01 - HERMES DC01 — completed first-phase data-centre spaces (part of building K1, with gatehouse and HEDNO substation)GreeceCompleted
Data4 Cambrai E-Valley campusFranceAnnounced
Data4 Escaudain campusFranceAnnounced
Data4 Hanau campusGermanyUnder construction
DataBank Ashburn Campus — existing IAD1 and IAD3 data-centre operationsUnited StatesOperational
DataBank ATL1 — existing Midtown Atlanta data-centre operationsUnited StatesOperational
DataBank ATL2 and ATL3 — existing West End data-centre operationsUnited StatesOperational
DataBank Centennial Campus — existing DEN2 and DEN5 data-centre operationsUnited StatesOperational
DataBank DEN1 — existing data-centre operationsUnited StatesOperational
DataBank DEN3 — existing carrier-hotel data-centre operationsUnited StatesOperational
DataBank DEN4 — existing edge colocation data-centre operationsUnited StatesOperational
DataBank DFW3 (Plano) — existing data-centre operationsUnited StatesOperational
DataBank Granite Point Campus — existing SLC2–SLC6 data-centre operationsUnited StatesOperational
DataBank LAS1 — existing data-centre operationsUnited StatesOperational
DataBank Lithia Springs Campus — ATL5 and ATL6 campus under constructionUnited StatesUnder construction
DataBank MSP2 — existing data-centre and carrier-hotel operationsUnited StatesOperational
DataBank Orangeburg LGA3 — existing data-centre operationsUnited StatesOperational
DataBank Orangeburg LGA4 (Orangeburg Phase Two) — proposed second data center on the campusUnited StatesAnnounced
DataBank PIT2 Summit Park Data Center — existing data-centre operationsUnited StatesOperational
DataBank Red Oak First-Phase Current ConstructionUnited StatesUnder construction
DataBank SFO1 — existing data-centre operationsUnited StatesOperational
DataBank SLC1 — existing downtown data-centre and carrier-hotel operationsUnited StatesOperational
Datagrid Makarewa Initial Horizontal WorksNew ZealandUnder construction
DataOne Vineland Phase 2 Expansion Current BuildUnited StatesUnder construction
dataR Rellingen Current ConstructionGermanyUnder construction
DataVita Lanarkshire AI Growth Zone campus (Chapelhall)United KingdomUnder construction
DataVolt Oxagon AI data centre campus (NEOM)Saudi ArabiaUnder construction
Datum FRN2 Data Centre BuildingUnited KingdomUnder construction
Datum Manchester MCR1 and MCR2 — existing operationsUnited KingdomOperational
DayOne Chonburi Tech Park (CTP) data center campusThailandOperational
DayOne Imari Data Center Campus DevelopmentJapanAnnounced
DayOne Kiveriö Unnamed Data Center Construction ProjectFinlandUnder construction
DayOne Kouvola Koria Data Center — current buildFinlandUnder construction
DayOne KTP Data Center Campus — in-service capacityMalaysiaOperational
DayOne NTP Data Center Campus — in-service capacityMalaysiaOperational
DC BLOX Huntsville — existing Tier III colocation data-centre operationsUnited StatesOperational
DC BLOX Palm Coast Approved First Building Current ConstructionUnited StatesUnder construction
DC1 — existing single-tenant data-centre operationsSingaporeOperational
Delska LV DC4 Riga — proposed new data-centre buildingLatviaAnnounced
Delta Forge 1 Current ConstructionUnited StatesUnder construction
Deutsche Telekom Industrial AI Cloud, Munich TucherparkGermanyPartially operational
Digi Power X Columbiana Purpose-Built Flagship Vertical BuildUnited StatesUnder construction
DigiCo SYD1 Ultimo Expansion Early WorksAustraliaSite preparation
Digital Edge BOM1IndiaOperational
Digital Edge BOM2IndiaShell
Digital Edge BOM3IndiaUnder construction
Digital Edge CGK1IndonesiaShell
Digital Edge EDGE2 Phase 3 Electrical and Mechanical DevelopmentIndonesiaUnder construction
Digital Edge SEL3 Phase 2Korea, Republic ofUnder construction
Digital Park Fechenheim UW04 SubstationGermanyUnder construction
Digital Realty 330 E. Cermak Current Facility BuildUnited StatesUnder construction
Digital Realty Astra North Phase One (Project Jayhawk) — proposed two-storey 450,000 sq ft data center with private and Evergy substationsUnited StatesAnnounced
Digital Realty Athens Campus — ATH1, ATH2 and ATH3 data-centre operationsGreeceOperational
Digital Realty ATL13 — existing data-centre and interconnection-hub operationsUnited StatesOperational
Digital Realty ATL14 — existing data-centre and colocation operationsUnited StatesOperational
Digital Realty DFW44 — data hall 4 shell addition (Project Gold Phase 2)United StatesAnnounced
Digital Realty Digital Dulles Current 96 MW DevelopmentUnited StatesUnder construction
Digital Realty Garland DFW39 Data Hall 4 Shell Addition (Project Gold Phase 2)United StatesAnnounced
Digital Realty Garland DFW45United StatesAnnounced
Digital Realty HKG10 (Digital TKO) — existing data-centre operationsHong KongOperational
Digital Realty HKG11 (Kin Chuen) — existing data-centre operationsHong KongOperational
Digital Realty Nairobi Two (NBO2)KenyaOperational
Digital Realty SIN10 — existing data-centre operationsSingaporeOperational
Digital Realty VIE13 Phase 1 Current Data Center BuildAustriaUnder construction
Digital Realty ZUR4 — new data center buildSwitzerlandUnder construction
Digital Realty Zurich Glattbrugg Campus — existing ZUR1, ZUR2 and ZUR3 data-centre operationsSwitzerlandOperational
Dulles Electric Data Centers — two proposed two-storey data center buildings (site plan EPLAN-2024-0154)United StatesAnnounced
DVZ Schwerin New Modular Data Center Current BuildGermanyShell
Echelon DUB10 — operating data-centre installation (Energy Centre and data centre buildings; build-out continuing)IrelandOperational
EcoDataCenter 2 Borlänge campusSwedenUnder construction
EcoDataCenter Smedjebacken — third data-centre campus (option on about 51.6 ha of Västansjö 2:7)SwedenAnnounced
ecoDC Hoa Lac (Evolution VN01) — operating data centreVietnamOperational
EdgeConneX Dublin campus — existing DUB01 and DUB02 data centres east of the R120 (operating)IrelandOperational
EdgeConneX EDCAUS13 — planned 729,537 sq ft data center building (6682 FM 535)United StatesAnnounced
EdgeConneX EDCAUS14 — planned 729,537 sq ft data center building (6682 FM 535)United StatesAnnounced
EdgeConneX EDCDUB04 and EDCDUB05 data centres with ESSDUB97 energy centre (EPA IE licence P1204-01)IrelandAnnounced
EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe)JapanUnder construction
EdgeConneX PHX11 — 412,065 sq ft core-and-shell data center building with Data Hall 1-4 build-outs, under construction (Mesa permits PMT24-11896, PMT25-09255 and PMT25-17623)United StatesUnder construction
EdgeConneX PHX12 — 296,800 sq ft core-and-shell data center building under construction (Mesa permit PMT25-22027)United StatesUnder construction
EdgeCore AS02 Data CenterUnited StatesUnder construction
EdgeCore Louisa County campusUnited StatesAnnounced
EdgeCore Mesa data center campusUnited StatesPartially operational
Edged Chicago ORD01-2United StatesShell
Edged Council Bluffs First Data CenterUnited StatesShell
Edged Fort Worth Project Outpost Building 1 — 488,770 sq ft data-centre cold dark shell (permit PB26-06984)United StatesPermitted
Edged Fort Worth Project Outpost Building 2United StatesAnnounced
Edged Kansas City — data-center building (final certificate of occupancy CICO-2026-00896, 3500 N Arlington Ave)United StatesCompleted
Edged Marseille Saint-Louis — planned nine-hall data centre (R+3) with 12 emergency generators (ESL PROPERTIES, Edged Energy)FranceAnnounced
EDS IST 01 Tuzla Initial BuildTürkiyeUnder construction
EDS IST 02 Gebze First PhaseTürkiyeAnnounced
Enecom Hiroshima Data Center Existing OperationsJapanOperational
Eni and Khazna AI data center campus, Ferrera ErbognoneItalyAnnounced
envia TEL Leipzig2 Fourth Section Current ConstructionGermanyUnder construction
Envision Ulanqab Zero-Carbon AI Computing Industrial Park — Phase 1ChinaUnder construction
Equinix BG2 Bogotá — Phase 1 (first 550 cabinets), existing data-centre operationsColombiaOperational
Equinix BG2 Bogotá — Phase 2 capacity expansionColombiaAnnounced
Equinix CH5 - Electrical Room L build-out (Elk Grove Village permit B26-0931)United StatesPermitted
Equinix HK6 — existing commercial data-centre operationsHong KongOperational
Equinix HO1 — conversion of an interior storage room to additional data hall space (TABS2027004299)United StatesAnnounced
Equinix MU4 Phase 3GermanyShell
Equinix Osaka OS3 — existing commercial data-centre operationsJapanOperational
Equinix SV12x — data-hall fit-outs (San Jose building permits 2024-108710-CI, 2026-141003-CI and 2026-140996-CI)United StatesPermitted
Equinix SV18 — new IBX colocation data centre, now open (127 Great Oaks Blvd)United StatesOperational
ESR-CHQ南港データセンターOS2 — planned second-phase data-centre building, Cosmosquare campusJapanAnnounced
eStruxture CAL-3 Initial BuildCanadaUnder construction
Ezditek RUH01 Phase 1 Current BuildSaudi ArabiaUnder construction
fantasista Sendai AI Data Center (Aoba-ku Imozawa) — Phase I developmentJapanAnnounced
Farmington Technology Park — proposed Tract data-center campus (PUD-1, Ordinance 2024-12; 1st Addition Lot 1 and future 2nd Addition)United StatesAnnounced
Fermi America Project Matador campusUnited StatesUnder construction
Firmus Bell Bay (Long Reach) AI Factory - DA 2026/29 data centreAustraliaAnnounced
Firmus St Leonards AI Factory Current ConstructionAustraliaUnder construction
firstcolo FRA7 Current BuildGermanyUnder construction
FlexBase New Technology Centre Current BuildSwitzerlandUnder construction
Flexential Douglasville 2 Current BuildUnited StatesUnder construction
Flexential Hillsboro 5 Current BuildUnited StatesUnder construction
Flexential Parker Data Center Current BuildUnited StatesUnder construction
Frederick Street Data Centre — proposed 81 MW data centreAustraliaAnnounced
G42 and Microsoft Olkaria geothermal data centre campusKenyaAnnounced
Galaxy Backbone Kano — existing Tier IV data-centre operationsNigeriaOperational
Galaxy Backbone NSSC Abuja — existing Tier III data-centre operations (NSSC DC1)NigeriaOperational
Galaxy Helios data center campusUnited StatesPartially operational
Galaxy Helios Phase II 260 MW Critical IT BuildUnited StatesFoundations
Gardner Property — proposed data center buildings and electric substation (SUP2027-00008 / REZ2023-00018)United StatesAnnounced
GBA Power-Computing Synergy Integrated Intelligent Computing Center — computing infrastructure Phase 1ChinaAnnounced
GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 1ChinaPermitted
GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 2ChinaPermitted
GDS Shaoguan Computing Cluster (韶关万国数据算力集群) — data-centre campus developmentChinaAnnounced
Gießen Katzenfeld — planned data centre in the Sondergebiet RechenzentrumGermanyAnnounced
Glendenning Road Data Centre — approved three-building 235 MW campusAustraliaPermitted
Global Switch Madrid — existing data-centre operations (Madrid 1, Calle Yécora 4)SpainOperational
Global Switch Paris — existing data-centre operationsFranceOperational
Goodman AMS01 Phase 1 Current DevelopmentNetherlandsUnder construction
Goodman FRA02 Phase 1 Current DevelopmentGermanyUnder construction
Goodman HKG09 Current RedevelopmentHong KongUnder construction
Goodman HKG10 Current RedevelopmentHong KongUnder construction
Goodman LAX01 First-Site Current DevelopmentUnited StatesUnder construction
Goodman MAD01 Current DevelopmentSpainUnder construction
Goodman PAR01 Phase 1 Current DevelopmentFranceUnder construction
Goodman PAR02 Phase 1 Current DevelopmentFranceUnder construction
Goodman SYD01 Current Single-Building DevelopmentAustraliaUnder construction
Google / Beale Tulsa County Project Clydesdale Campus ConstructionUnited StatesUnder construction
Google Armstrong County data center campus (Crusoe Goodnight)United StatesUnder construction
Google Bermuda Hundred Current DevelopmentUnited StatesUnder construction
Google Cedar Rapids data center campus (Big Cedar Industrial Center)United StatesUnder construction
Google Cerrillos Data Center — redesigned air-cooled proposalChileAnnounced
Google Columbia County (GreenPoint) Data Center Campus DevelopmentUnited StatesAnnounced
Google Elmina Current Campus ConstructionMalaysiaUnder construction
Google Fort Wayne data centerUnited StatesOperational
Google Franklin Township data center proposal (Project Flo)United StatesCancelled
Google Grange Castle South Data Storage Facility ExpansionIrelandPermitted
Google Horndal Data Center — first facilitySwedenAnnounced
Google Journey data center campus (Haskell County)United StatesUnder construction
Google Kansas City data center campus (Hunt Midwest Business Center)United StatesUnder construction
Google Mayes County (Pryor) — existing data-centre campus operationsUnited StatesOperational
Google Meitner Energy Center data center (Gray and Roberts counties)United StatesUnder construction
Google Mesa Red Hawk — Phase 2 Building 2United StatesCompleted
Google Mesa Red Hawk — Phase 3 (PH03) data hall buildingUnited StatesUnder construction
Google Muskogee County (Acacia House) — new data-centre campus in development (Acacia Facility, DEQ permit application 2026-0090-C)United StatesAnnounced
Google New Albany — existing data-centre campus operationsUnited StatesOperational
Google Project Skyway — proposed data-center campus on the Pine Island Industrial PUD site with four Google-owned substations (PUC route-permit docket E002/TL-26-135)United StatesAnnounced
Google Stillwater data center campusUnited StatesAnnounced
Google Waltham Cross data centreUnited KingdomOperational
Google West Memphis data center campusUnited StatesUnder construction
Graven Hill D1 Data Centre Campus - eight data-centre units (Cherwell reserved matters 25/03310/REM)United KingdomPermitted
Green Birr — planned data-centre campus on the 25 ha Areal Grossacher und GrändelSwitzerlandAnnounced
Green Campus ZRH1 Data Center 4SwitzerlandUnder construction
Green IT Aragón data center campus (SAMCA), LuceniSpainAnnounced
Green Mountain FRA-Mainz Current Three-Building DevelopmentGermanyUnder construction
Green Mountain LON-East (Romford) - 14 MW AI-ready data-hall expansion inside the existing building (delivered)United KingdomCompleted
Green Mountain Undheim Current Two-Building DevelopmentNorwayUnder construction
Greenergy Hüüru Data-Hall ExpansionEstoniaUnder construction
GSA01 Data Centre — operating 25 MW data centreThailandOperational
Habilitación Data Center Alto JahuelChileAnnounced
Haoyang Langfang No. 1 Existing OperationsChinaOperational
Herbata data centre campus (Naas)IrelandAnnounced
Hexagon Data Center (Riyadh)Saudi ArabiaUnder construction
Highreso Ayagawa Existing OperationsJapanOperational
Highreso Kagawa Takamatsu Existing OperationsJapanOperational
HIVE Yguazú 2026 Campus Electrical-Infrastructure ExpansionParaguayUnder construction
HJS — new 189,378 sq ft data building (2565 Harrison Road)United StatesAnnounced
Homer City Energy CampusUnited StatesUnder construction
Honeman Close Data Centre — approved 140 MW Microsoft data centreAustraliaPermitted
Horizon 1 Kearney data center — Conditional Use Permit 2026-04 (Ordinance No. 8823), Lot 1 Tech One Third and Lot 1 Tech One Fifth SubdivisionsUnited StatesPermitted
Huailai Smart Space AI Industrial Park (怀来县智慧空间人工智能产业园) — data-centre buildings 1#-6# with two 110 kV substationsChinaCompleted
Huawei Cloud Horinger Yungu South Zone Phase 1 — 3# data-centre machine-room building (3D data centre)ChinaShell
Huawei Cloud Horinger Yungu West Zone Phase 1 — second-batch works (2# data-centre machine-room building and 2# generator platform)ChinaCompleted
Huawei Cloud Ulanqab Phase 3 DC5 Mechanical and Electrical Fit-outChinaUnder construction
Huizhou University — Modular Data-Centre Room UpgradeChinaAnnounced
HUMAIN Al-Saad hyperscale AI data centre campusSaudi ArabiaAnnounced
HUMAIN Dammam AI data centreSaudi ArabiaUnder construction
Hut 8 Beacon Point AI data center campusUnited StatesUnder construction
Hut 8 Beacon Point First Phase 352 MW Critical IT LeaseUnited StatesUnder construction
Hut 8 River Bend 245 MW Critical IT Current BuildUnited StatesUnder construction
Hut 8 River Bend AI data center campusUnited StatesUnder construction
Hyperco Loviisa Current Data Center DevelopmentFinlandUnder construction
Igoudar Dakhla green data centre complexWestern SaharaAnnounced
IIJ Matsue Existing OperationsJapanOperational
IIJ Shiroi DCC Phase 3 Server BuildingJapanUnder construction
IIJ Shiroi Existing Operations (Phases 1 and 2)JapanOperational
Iozera Tetouan AI data center and hubMoroccoAnnounced
IREN Childress data center campusUnited StatesPartially operational
IREN Kiowa data center campusUnited StatesProposed
IREN Sweetwater 2 — planned 600 MW data-centre campus on about 500 acresUnited StatesAnnounced
Iron Mountain AMS-2 10 MW ExpansionNetherlandsUnder construction
Iron Mountain LON-3 25 MW BuildUnited KingdomUnder construction
Iron Mountain MAD-2 and MAD-3 20 MW DevelopmentSpainUnder construction
Iron Mountain MIA-1 BuildUnited StatesUnder construction
Iron Mountain NJE-1 ExpansionUnited StatesUnder construction
Iron Mountain VA-9 Phase 1United StatesUnder construction
Ishikari Renewable Energy Data Center No.1JapanOperational
iTech Tower 3.1 — remaining development and fit-outHong KongUnder construction
iTech Tower 3.2 — data-centre constructionHong KongUnder construction
iXAfrica NBOX1 — existing campus operationsKenyaOperational
J5 LLC hyperscale data center campus — planned facility on 607.7 acres at Farrington and Washington roadsUnited StatesAnnounced
Jefferson Lab Data Center (JLDC)United StatesUnder construction
JERA / RHAELM Chiba AI Data Center InfrastructureJapanAnnounced
Jiujiang University — Danfengyuan Campus Data CentreChinaOperational
Joliet Technology CenterUnited StatesAnnounced
Julius Avenue Data Centre — proposed 120 MW data centre (IPC referral)AustraliaAnnounced
K2 hyperscale data center campus, Zibido San Giacomo and LacchiarellaItalyAnnounced
KAGOYA Japan Keihanna Lab Existing OperationsJapanOperational
Kai Shin Satsumasendai AI Data Center — commercial campusJapanAnnounced
KAO Data KLON-03 Data Centre BuildingUnited KingdomUnder construction
Kao Data Park Royal Revised Data Centre DevelopmentUnited KingdomAnnounced
Kasi Cloud LOS campus (Lekki, Lagos)NigeriaPartially operational
KC1 Data Centre, Kemps Creek — proposed 144 MW CDC data centreAustraliaAnnounced
KCCS ZED Ishikari Existing OperationsJapanOperational
KDDI Osaka Sakai Existing OperationsJapanOperational
Keel Moses Lake — HPC/AI data center build on the former Bitfarms 18 MW mining siteUnited StatesUnder construction
Keli Xinneng Efficient Low-Carbon Intelligent Computing Centre — Data-Centre Building 2#, floors 1-3ChinaAnnounced
Keppel DC Dublin 1 — existing colocation data-centre operationsIrelandOperational
Keppel DC Dublin 2 — existing colocation data-centre operationsIrelandOperational
Keppel DC SGP 9 Current BuildSingaporeUnder construction
Keppel DC Singapore 1 — existing colocation data-centre operationsSingaporeOperational
Keppel DC Singapore 2 — existing colocation data-centre operationsSingaporeOperational
Keppel DC Singapore 3 — existing colocation data-centre operationsSingaporeOperational
Keppel DC Singapore 4 — existing colocation data-centre operationsSingaporeOperational
Keppel DC Singapore 5 — existing colocation data-centre operationsSingaporeOperational
Keswick data centre, Ipswich Road - proposed data centre with substations and backup generators (South Norfolk 2026/2957)United KingdomAnnounced
Key Point Vladivostok Data Center — operating first phaseRussiaOperational
Key Point Vladivostok Data Center — second phaseRussiaAnnounced
Khazna Data Centers Dammam campusSaudi ArabiaAnnounced
Khazna QAJ1 AI data center (Ajman)United Arab EmiratesUnder construction
KIO Data Centers QRO3, QuerétaroMexicoProposed
Kobe Former Conveyor Tunnel Data Center Initial DevelopmentJapanAnnounced
La Osa Energy Center (Vermaland), Pinal CountyUnited StatesCancelled
Lahti Kujala data centre (ecogrid.energy / Peab) — planned data centre at Vartiokallionkatu 2FinlandAnnounced
Lake Mariner CB-5 Current BuildUnited StatesUnder construction
Lambda Kansas City AI factoryUnited StatesAnnounced
Lancium Clean Campus Abilene Remaining Six-Building ExpansionUnited StatesUnder construction
LEITWERK BADEN CLOUD Lahr Data Center Current BuildGermanyUnder construction
LG Uplus Paju AIDC Building 1Korea, Republic ofUnder construction
LLE01 — planned campus of four data-centre buildings (A-D, 264 MW IT) on the former Stora Enso mill siteFranceAnnounced
Lunavi Cheyenne Data Center — existing data-centre operationsUnited StatesOperational
LuxConnect Bettembourg — existing DC 1.1, DC 1.2 and DC 1.3 data-centre operationsLuxembourgOperational
LuxConnect DC 2 Bissen — existing data-centre operationsLuxembourgOperational
Lübbenau Data Center Current BuildGermanyUnder construction
Macquarie IC3 Super West Phase 1 BuildAustraliaUnder construction
Madera Farm — proposed data center campus with electric substations (SUP2027-00002 / REZ2025-00007)United StatesAnnounced
maincubes BER02GermanyUnder construction
Mamre Road Data Centre Campus — proposed 1.2 GW three-building campusAustraliaAnnounced
Manekin Plaza — one proposed data center (site plan STPL-2022-0053)United StatesAnnounced
Mars Road Data Centre — proposed 140 MW data centre (SSD-108835458)AustraliaAnnounced
Massaponax Tech Campus — proposed data center campus of about 6 million sq ft (rezoning R25-0004)United StatesAnnounced
MC Digital Realty KIX10 (Digital Osaka 1) — existing operationsJapanOperational
MC Digital Realty KIX13 (Digital Osaka 4) — existing operationsJapanOperational
MC Digital Realty KIX15 — new data center buildJapanUnder construction
Mega D.C. MDCIL-1 Modi'in Phase B Current BuildIsraelUnder construction
Mega D.C. MDCIL-2 Masmiyya Facility Current BuildIsraelUnder construction
Mega D.C. MDCIL-5 Idan HaNegev Phase A Current BuildIsraelUnder construction
MEGA Fanling — existing commercial data-centre operationsHong KongOperational
MEGA Plus — existing commercial data-centre operationsHong KongOperational
MERLIN Edged Bilbao-Arasur Building 2 Current BuildSpainUnder construction
MERLIN Edged MAD02 Site PreparationSpainSite preparation
MERLIN Lisbon Phase II Two-Building DevelopmentPortugalUnder construction
Merlin Zaragoza-WIND Data Center Campus (144 MW IT single-phase development)SpainAnnounced
Meta Beaver Dam data centerUnited StatesUnder construction
Meta Bowling Green data centerUnited StatesUnder construction
Meta Cheyenne data centerUnited StatesUnder construction
Meta DeKalb Data CenterUnited StatesPartially operational
Meta Eagle Mountain Data Center — 2026 expansion (new buildings)United StatesAnnounced
Meta Eagle Mountain Data Center — operating campusUnited StatesOperational
Meta El Paso Current DevelopmentUnited StatesUnder construction
Meta Fort Worth Data Center — operating campusUnited StatesOperational
Meta Gallatin Data CenterUnited StatesPartially operational
Meta Kansas City data centerUnited StatesOperational
Meta Kuna Data CenterUnited StatesOperational
Meta Lebanon Indiana Current DevelopmentUnited StatesUnder construction
Meta Los Lunas Data Center — existing data-centre operationsUnited StatesOperational
Meta Mesa Data CenterUnited StatesExpansion
Meta Montgomery data centerUnited StatesUnder construction
Meta New Albany data center campus (Prometheus)United StatesPartially operational
Meta Richland Parish Current DevelopmentUnited StatesUnder construction
Meta Richland Parish data center (Hyperion)United StatesUnder construction
Meta Sturgeon County Alberta Current Campus BuildCanadaUnder construction
Meta Talavera de la Reina data center campusSpainAnnounced
Meta Temple Data CenterUnited StatesOperational
Meta Tulsa data centerUnited StatesUnder construction
Microsoft Alviso Phase 2 Greenfield DevelopmentUnited StatesUnder construction
Microsoft Bedburg NRW08/NRW09 — planned two-phase datacenter campusGermanyAnnounced
Microsoft Conover Lyle Creek Current BuildUnited StatesUnder construction
Microsoft Dublin Data Center Campus — existing operations of DB3, DB4 and DB5 (EPA IE licence P1190-01)IrelandOperational
Microsoft Dublin Data Center Campus — existing operations of DUB6, DUB7, DUB8, DUB9, DUB10, DUB12 and DUB13 (EPA IE licence P1191-01)IrelandOperational
Microsoft Dublin Data Center Campus — operating DUB14 and DUB15 installation with the Central Administration Building (EPA IE licence P1187-01; DUB15 build-out not asserted complete)IrelandOperational
Microsoft EKI Campus - proposed data center (IDEM new-source construction and FESOP application F 141-50527-00655)United StatesAnnounced
Microsoft Espoo Second Datacenter BuildingFinlandUnder construction
Microsoft Etobicoke First Building Current BuildCanadaUnder construction
Microsoft Fairwater AI datacenter, Mount PleasantUnited StatesPartially operational
Microsoft Heath Initial Site PreparationUnited StatesSite preparation
Microsoft Hebron Initial Site PreparationUnited StatesSite preparation
Microsoft Huntstown Data Centre Campus — data hall Buildings A and BIrelandUnder construction
Microsoft Kirkkonummi First Datacenter BuildingFinlandUnder construction
Microsoft Kirkkonummi Second Datacenter BuildingFinlandUnder construction
Microsoft La Muela datacenter campus (Aragón)SpainAnnounced
Microsoft La Porte First Phase Current BuildUnited StatesUnder construction
Microsoft Lévis Charny Development ProjectCanadaUnder construction
Microsoft L’Ancienne-Lorette Development ProjectCanadaUnder construction
Microsoft Middenmeer Campus West expansion (Agriport Plot B)NetherlandsAnnounced
Microsoft Mount Pleasant Durand Avenue datacenter campusUnited StatesUnder construction
Microsoft Mount Pleasant International Drive datacenter campusUnited StatesAnnounced
Microsoft Mount Pleasant Second Datacenter FacilityUnited StatesUnder construction
Microsoft New Albany Initial Site PreparationUnited StatesSite preparation
Microsoft Pecos datacenter campusUnited StatesAnnounced
Microsoft Petit-Landau datacenter (three units, about 36 ha)FranceAnnounced
Microsoft San Bovio Initial DevelopmentItalySite preparation
Microsoft Silver Springs Datacenter — current campus buildUnited StatesSite preparation
Microsoft Skelton Grange datacentre campus, LeedsUnited KingdomAnnounced
Microsoft Union City data center campus (EdgeConneX)United StatesUnder construction
Microsoft Vaughan YTO11 — first building constructionCanadaCompleted
Microsoft Vaughan — second phase (second datacentre building)CanadaAnnounced
Microsoft Villamayor de Gállego datacenter campus (Aragón)SpainAnnounced
Microsoft Wellington Datacenter Site (Gainesville) — proposed campusUnited StatesAnnounced
Microsoft Zaragoza (Puerto Venecia) datacenter campusSpainAnnounced
Midas Compute Big Spring Facility — proposed AI computing facility with on-site natural-gas generation (TCEQ air permit 185376 pending)United StatesAnnounced
Mihta Askiy Data CentreCanadaProposed
MIL05 — planned 60 MW IT two-building data-centre campus (MIL05A and MIL05B; VIA decree DM 411/2026, ID_VIP 13497)ItalyAnnounced
MIL06 — second datacenter building (north building) with emergency generators (VIA decree DM 633/2026, ID_VIP 10891)ItalyAnnounced
MIL07 — proposed 12 MW IT data centre replacing an existing industrial building (Data Center Stack Campus Siziano VIA, ID_VIP 14473)ItalyAnnounced
MIL08A — planned 20 MW IT data-centre building on the MIL08 campus (Data Center Stack Campus Siziano VIA, ID_VIP 14473)ItalyAnnounced
Mirai Ogaki Data Center Campus Existing OperationsJapanOperational
Mitsui Fudosan (仮称)日野市日野台3丁目計画 — planned three-building data-centre development, HinoJapanAnnounced
ML10x (formerly ML10 and ML11) — proposed single-building data centre with 32 standby generators (VIA ID_VIP 14381)ItalyAnnounced
Monarch Point Pleasant Current Site PreparationUnited StatesUnder construction
Monticello Tech — proposed ~3 million sq ft data center technology campus (DCPUD rezoning, CUP and preliminary plat, PC File 2026.34)United StatesAnnounced
Morris Technology ParkUnited StatesAnnounced
Nabiax Alcalá Data Center 3 (ADC3)SpainAnnounced
Nabiax Alcalá Data Center ADC1 and ADC2 — existing data-centre operationsSpainOperational
Nabiax Julián Camarillo 8 Campus — existing data-centre operations (modules 1-3)SpainOperational
Nanjing University of Information Science and Technology — Changwang Building Data CentreChinaOperational
National AI Computing Center, Solaseado (Haenam)Korea, Republic ofUnder construction
NAVER GAK Sejong AI Factory (NVIDIA DSX, NAVER/Brookfield/NVIDIA)Korea, Republic ofAnnounced
NDC Noyal (Rennes) — existing 3 MW IT proximity data centre operationsFranceOperational
NDC Paris 1 — 7 MW IT data centre (permit PC 078 640 24 V1008)FranceUnder construction
Nebius Birmingham AI factory (Lakeshore Parkway)United StatesAnnounced
Nebius Independence AI factoryUnited StatesUnder construction
Nebius Pajarila First Phase Current BuildFinlandUnder construction
Nebius Vineland AI factoryUnited StatesUnder construction
New Hill Digital CampusUnited StatesCancelled
NEXTDC GE1 Incremental In-Progress Fit-OutAustraliaUnder construction
NEXTDC KL1 Remaining In-Progress Fit-OutMalaysiaMEP / electrical
NEXTDC M2 Incremental In-Progress Fit-OutAustraliaMEP / electrical
NEXTDC M3 Incremental In-Progress Fit-OutAustraliaMEP / electrical
NEXTDC M4 Initial Early WorksAustraliaSite preparation
NEXTDC M4 MelbourneAustraliaAnnounced
NEXTDC S3 Incremental In-Progress Fit-OutAustraliaMEP / electrical
NEXTDC S4 Initial DevelopmentAustraliaUnder construction
NEXTDC S7 SydneyAustraliaAnnounced
Niger National Data Center PK5 Current BuildNigerUnder construction
Nishitetsu Fukuoka Data Center Existing OperationsJapanOperational
noris network FRA1 Schwalbach Current BuildGermanyUnder construction
noris network München Ost (MUC5) — existing data-centre operationsGermanyOperational
noris network NBG6 BA3 Modular ExpansionGermanyUnder construction
NorthC Biel (Bern) — existing data-centre operationsSwitzerlandOperational
NorthC Frankfurt1 (FRA01) Current Facility BuildGermanySite preparation
NorthC Genf — planned 4.5 MW high-performance data centre in The Hive technology parkSwitzerlandAnnounced
NorthC Münchenstein (Basel) 3 — planned AI data centre on the uptownBasel campusSwitzerlandAnnounced
Northeast Creek Technology Campus 2 — proposed campus phase (major site plan SP20-2026, tax parcel 58-30)United StatesAnnounced
Novva Colorado Springs — existing data-centre operationsUnited StatesOperational
Novva Las Vegas — existing data-centre operationsUnited StatesOperational
Novva Mesa — planned 300 MW, five-data-hall data-centre campus in two phasesUnited StatesAnnounced
Novva Utah flagship campus — existing data-centre operationsUnited StatesOperational
Nscale Glomfjord AI Data Center — operating facilityNorwayOperational
Nscale Kvandal AI data center (Narvik)NorwayUnder construction
Nscale Kvandal Initial 25 MW EPC Current BuildNorwayUnder construction
NTT Chicago CH3 - new 270,000 sq ft data center building under constructionUnited StatesUnder construction
NTT Dallas TX4 Data CenterUnited StatesUnder construction
NTT DATA Keihanna OSK11 Data Center — existing operationsJapanOperational
NTT Frankfurt 1 7.3MW ExpansionGermanyUnder construction
NTT Global Data Centers Tokyo TKY12 campus, ShiroiJapanAnnounced
NTT Munich 2 Operating CampusGermanyOperational
NTT Phoenix (Mesa) PH5 — Building 3, two-storey 225,606 sq ft data center under construction (Mesa permit PMT24-17530)United StatesUnder construction
NV LAS NAP 17 & 18 site — single-storey closed-loop water-cooled data center (Clark County permit BD24-61043)United StatesUnder construction
NV LAS NAP 17 — single-storey closed-loop water-cooled data center with office (Clark County permit BD25-00549)United StatesUnder construction
NXDATA-3 / NX-3 / BUH3RomaniaUnder construction
Nxera DC Tuas — operating 58 MW multi-tenanted data centreSingaporeOperational
Nxtra Eko Atlantic Lagos Current Facility BuildNigeriaUnder construction
ODATA DC BG01 — existing data-centre operationsColombiaOperational
ODATA DC QR01 — existing data-centre operationsMexicoOperational
ODATA DC QR02 — existing data-centre operationsMexicoOperational
ODATA DC QR03 — existing campus data-centre operationsMexicoOperational
ODATA DC RJ01 — existing data centre operationsBrazilOperational
ODATA DC SP01 — existing data centre operationsBrazilOperational
ODATA DC SP02 — existing data centre operationsBrazilOperational
ODATA DC SP03 — existing dedicated data centre operationsBrazilOperational
ODATA DC SP04 Phase 2 ExpansionBrazilUnder construction
ODATA DC SP04 — existing data-centre operations (excluding the Phase 2 expansion)BrazilOperational
ODATA DC ST01 — existing data-centre operationsChileOperational
ODATA DC ST02 — existing data-centre operationsChileOperational
OKC2 — GPU computing data center with on-site gas-engine power (proposed new facility)United StatesAnnounced
Old Ocean Data Center (Nightpeak Energy)United StatesProposed
OME Data Center04 Shinmachi9-A BuildingJapanUnder construction
OME Data Center07 / DC5 Building BJapanPermitted
Omnia Data Center PecémBrazilAnnounced
OMNIA Pecém Initial Data Center ConstructionBrazilUnder construction
OpenAI Project Camellia — planned AI data-centre campusUnited StatesAnnounced
Oracle Project Jupiter Doña Ana County Current Campus BuildUnited StatesUnder construction
Page, Arizona data center site (Huntley LLC)United StatesProposed
PAR03 — planned 72 MW IT data centre (SNC DATA SERRES, Goodman France) replacing the former MDS logistics siteFranceAnnounced
Paratera Inner Mongolia New Computing Base — existing compute-base operationsChinaOperational
Paris Digital Park — PAR8, PAR9, PAR10 and PAR11 data-centre operationsFranceOperational
Pazhou Suangu Xinyue Intelligent Computing Center — Building 2 fit-outChinaAnnounced
PBOC Shanghai Same-City Data Centre — Jindianyun RetrofitChinaAnnounced
Pemberton Data Center — approved by-right data center campus site plan (tax parcel 37-25, Centreport Parkway)United StatesAnnounced
Pennsylvania Digital I (PAX-1), Middlesex TownshipUnited StatesAnnounced
PIPA-DC1 hyperscale data centre (DC1 and DC2, 130 MW IT)FranceAnnounced
PN2 DC5 — planned 30 MW IT data centre replacing a 1981 logistics warehouse (SCI Prologis France CLIV)FranceAnnounced
Polaris Forge 1 Current ExpansionUnited StatesUnder construction
Polaris Forge 2 Current ConstructionUnited StatesUnder construction
Polarise Amberg (Unterallgäu) AI Factory — conversion of the former Wertachtal transmitter buildingGermanyAnnounced
Portus IPHH4 — two data-centre buildings (Baugenehmigung M-BP-2262-2025)GermanyPermitted
Portus MUC2GermanyUnder construction
Potomac Church Data Center — Building 1 (complete and occupied)United StatesCompleted
PowerHouse 95 data center campusUnited StatesAnnounced
PowerHouse Grand Prairie campus (PowerHouse and Provident)United StatesAnnounced
PowerHouse Louisville hyperscale campus (Camp Ground Road)United StatesUnder construction
Pozitrons Phase 1 Current BuildLatviaUnder construction
Princeton Digital Group JC3 Greater JakartaIndonesiaUnder construction
Princeton Digital Group JC4 Greater JakartaIndonesiaUnder construction
Procergs Porto Alegre New Substation 6033-00BrazilMEP / electrical
Project Apollo Data Centre Macquarie Park — approved 135 MW data centreAustraliaPermitted
Project Bedrock — 54,070 sq ft data center building (Major Site Plan, Resolution 2026-209, 5890 Carmen Avenue)United StatesPermitted
Project BlueUnited StatesUnder construction
Project Cannoli — proposed Google data center campus (Buildings 1-3, network service building and office)United StatesAnnounced
Project Celtics — Building 5 core and shell (42630 Patriot Park Dr)United StatesPermitted
Project Cinco — hyperscale data center campus under construction (first development phase)United StatesUnder construction
Project Delta — proposed data center campus (conditional rezoning R-A to M-2-CZ, about 1,848.74 acres)United StatesAnnounced
Project Flex — proposed data center campus (final site plan under review)United StatesAnnounced
Project Loch / Watkins Centre — approved future Google data center site (rezoning 25SN1040)United StatesAnnounced
Project Longhorn Building OneUnited StatesAnnounced
Project Pirate — proposed data center campus on about 280 acres (announced September 2026)United StatesAnnounced
Project Pluto Data Centre — approved 100 MW data centreAustraliaPermitted
Project Sail (Prologis data center campus, Coweta County)United StatesAnnounced
Project Skye / Upper Magnolia Green — approved future Google data center site (rezoning 25SN1038, Tract A)United StatesAnnounced
Project Thunderbird West Campus — proposed data center on the western tract (rezoning A to I-3)United StatesAnnounced
Prologis Trenton Project Mila Campus ConstructionUnited StatesUnder construction
Prometheus Hyperscale Evanston campusUnited StatesAnnounced
Pulsant Birmingham WM-1 - existing data centre operationsUnited KingdomOperational
Pure DC / SEGRO Park Royal LON02 Data CentreUnited KingdomPermitted
Pure DC AMS01 Data Hall DevelopmentNetherlandsUnder construction
Pure DC Brent Cross LON01 B1 — existing data-centre operations (Building 1, 20 MW, four data halls)United KingdomOperational
Pure DC Brent Cross LON01 B2 Composite BuildUnited KingdomUnder construction
Pure DC SJK01 Phase 1 — three data-centre buildings (Seinäjoki permit 3024006057, Flinkinsuora 3)FinlandUnder construction
PW Digital GatewayUnited StatesCancelled
QScale Q01 Building BCanadaUnder construction
QScale Q01 campus (Lévis)CanadaPartially operational
QTS and Lancium Hall County data center campusUnited StatesSite preparation
QTS Ashburn 1 DC2 — data centre under construction (22280 Randolph Drive)United StatesUnder construction
QTS Aurora DEN1 DC2 Current Fit-OutUnited StatesUnder construction
QTS Bessemer data center campus (Project Marvel) - site preparationUnited StatesSite preparation
QTS Calatorao data center campusSpainAnnounced
QTS Cambois 2026 EarthworksUnited KingdomCivil works
QTS Cambois Data Centre CampusUnited KingdomUnder construction
QTS Cambois Phase 2 - two data centre buildings (Northumberland reserved matters 26/03028/REM)United KingdomAnnounced
QTS Cedar Rapids Current Campus DevelopmentUnited StatesUnder construction
QTS DFW1-DC1 data hall 1.2 fit-out (Project Atlas)United StatesAnnounced
QTS DFW2 DC7United StatesAnnounced
QTS Eagle Mountain SLC1 Building 2United StatesUnder construction
QTS Eemshaven data center campusNetherlandsPartially operational
QTS Fayetteville campusUnited StatesPartially operational
QTS Suwanee campus — existing data-centre campus operations (DC1 and DC2)United StatesOperational
QTS Vimercate data center campusItalyAnnounced
QTS York County Initial-Phase Building 1United StatesShell
Quantum Frederick data center parkUnited StatesUnder construction
R44 Vision DC data centre — proposed development with 111.8 MW emergency-power plantGermanyAnnounced
Racks Central RCJM1 Phase AMalaysiaUnder construction
Raiden Infotech Turbhe MIDC Data Centre EC 531703 Current BuildIndiaUnder construction
Range Hong Kong Sandy Ridge Campus Current Infrastructure BuildHong KongUnder construction
Raxio AO1 Cacuaco — operating facilityAngolaOperational
Raxio DRC1 Kinshasa — operating facilityDemocratic Republic of the CongoOperational
Raxio MZ1 Beluluane — operating facilityMozambiqueOperational
Raxio UG1 Namanve — operating facilityUgandaOperational
Rechenzentrum Alteno — planned hyperscale data centre (B-Plan Nr. 04.1.02, Industriegebiet Alteno)GermanyAnnounced
Rechenzentrum Hofheim-Marxheim — new three-phase data centreGermanyAnnounced
Red Admiral data centre campus, RochfortbridgeIrelandProposed
Red Oak PD-66R8 Data Center Complex — proposed development plan (zoning case ZC26-15, Ordinance No. 26-032)United StatesAnnounced
Redheughs Avenue Green Data Centre (Edinburgh 25/04239/PPP, appeal PPA-230-2794)United KingdomAnnounced
Related Digital Cheyenne Phase 1United StatesUnder construction
Reliance Jamnagar AI-enabled data centre for MetaIndiaAnnounced
RIKEN Fugaku NEXT New Computer BuildingJapanAnnounced
Rio AI City (Elea Data Centers)BrazilPartially operational
Riot Platforms Corsicana facilityUnited StatesPartially operational
Riot Platforms Rockdale data center campusUnited StatesPartially operational
Riot Rockdale AMD Expansion Phases 3 and 4United StatesUnder construction
Road 1 Data Centre — approved 49 MW data centre (SSD-80814238)AustraliaPermitted
Rovaltain Sesterce Campus — proposed 40 MW AI supercomputer campus (permit PC 026 004 25 00020, implementation suspended)FranceAnnounced
Rowan Project TempleUnited StatesUnder construction
Sabey Indianapolis Decatur Township Data Center Campus — proposed campusUnited StatesAnnounced
Sabey SDC Austin Building B Current BuildUnited StatesShell
Sabey SDC Umatilla Data Center Campus — current campus buildUnited StatesUnder construction
Sakura Ishikari Data Center Existing OperationsJapanOperational
Scala AI City (Eldorado do Sul)BrazilAnnounced
Scala Data Centers Tamboré CampusBrazilPartially operational
Scala SFORPF01BrazilUnder construction
SCSK netXDC Chiba Center (SI1) and Chiba No.2 Center (SI2) Existing OperationsJapanOperational
SCSK netXDC Chiba No.3 (SI3)JapanOperational
SDC-EN Meath I — four two-storey data storage buildings DC1-DC4 (An Bord Pleanála ABP-307546-20 / Meath RA191593; EPA IE licence application P1239-01)IrelandAnnounced
Sembcorp Wilton International Data Centre - data centre campus (Redcar and Cleveland R/2026/0337/FFM)United KingdomAnnounced
SenseTime Lingang AIDC — Phase 2ChinaPermitted
Servpac MTP Data Center Building 1 — existing Tier IV colocation operationsUnited StatesOperational
Shaanxi Xueqian Normal University — Chang’an Data Centre Room RenovationChinaCompleted
Shandong University Longshan — Phase 1 Data Centre and Research PlatformChinaUnder construction
Shantou Undersea Data Center Phase 1 (7 MW data-capsule platform)ChinaAnnounced
Shenandoah Computing LLC — proposed five-building data-processing facility (MoDNR air construction permit application 2025-08-034)United StatesAnnounced
Shenzhen Guangming Phase 2 LineShine Existing OperationsChinaOperational
Sien Real Piaseczno Data Center — four-building campusPolandSite preparation
Sify Chennai 02 data center campus, SiruseriIndiaPartially operational
Sify Noida 02 data center campusIndiaPartially operational
Sify Rabale data center campus (Mumbai 03), Navi MumbaiIndiaPartially operational
Silverdale Road data centre, Hayes - new data centre building with emergency generator (Hillingdon 49261/APP/2024/2904)United KingdomPermitted
Site Layer 1 Data Center Project — proposed data centre of about 800 MW with 300 MW on-site gas-engine generationUnited StatesAnnounced
SK AI Data Center UlsanKorea, Republic ofUnder construction
Skybox Hutto Building 4 — core and shellUnited StatesAnnounced
Skygard OSL1 Phase 2NorwayUnder construction
SNC PARAY DC — planned 55 MW IT data centre (12 data halls, Hines) on the former Air France training siteFranceAnnounced
SoftBank Hokkaido Tomakomai AI Data CenterJapanUnder construction
SoftBank Osaka Sakai AI data centerJapanUnder construction
SoftBank-Sesterce Bosquel AI data centerFranceAnnounced
Soluna Project Kati 1 — 83 MW hosting data centerUnited StatesOperational
Soluna Project Kati 2 AI data center (MFE-A-Kati2 Building 1)United StatesAnnounced
Spruce Lake AI Data Centre — proposed campus and on-site generationCanadaAnnounced
STACK Bossier Highway 3 Technology Park Current Campus BuildUnited StatesUnder construction
STACK DFW02BUnited StatesAnnounced
STACK Infrastructure Berry Hill campus, Pittsylvania CountyUnited StatesAnnounced
STACK POR03 — existing data-centre operations (72 MW operational critical capacity)United StatesOperational
STACK SYD01 Erskine Park — proposed two-building 450 MW data centreAustraliaAnnounced
Stack — new 332,089 sq ft data building (7340 Souder Road)United StatesAnnounced
Stafford Technology Campus (STC) — data center campus in county site-plan review (rezoning RC23154931, proffer amendment RC25156486)United StatesAnnounced
Stargate Abilene (Crusoe campus on Lancium land)United StatesPartially operational
Stargate Milam County (SB Energy campus)United StatesUnder construction
Stargate UAE / UAE-US AI CampusUnited Arab EmiratesUnder construction
Start Campus SIN02 Current Facility BuildPortugalUnder construction
Start Campus SINES data center campusPortugalPartially operational
Statesboro Burkhalter Road proposed data center (4AM Development, RZ 26-07-05)United StatesAnnounced
Sterling Technology Park — proposed data center building with mechanical yards and guard booth (site plan EPLAN-2025-0027)United StatesAnnounced
STT Fairview data center campusPhilippinesUnder construction
STT Jaipur 1IndiaOperational
STT Jakarta 3IndonesiaShell
STT Jakarta 5IndonesiaUnder construction
STT Jakarta 6IndonesiaUnder construction
STT Navi Mumbai — proposed further data-centre expansion (SEAC-2 statement 593234)IndiaAnnounced
STT Tokyo 1 Existing OperationsJapanOperational
SUNeVision MEGA Gateway — operating data centreHong KongOperational
SUNeVision MEGA IDC — Phase One (Tower A) operationsHong KongOperational
SUNeVision MEGA Two — operating data centreHong KongOperational
SUNeVision MEGA-i — operating carrier-neutral connectivity-hub data centreHong KongOperational
Switch The Keep 2 Campus (Keep 2.0) — data-center campus under constructionUnited StatesUnder construction
Synapse Data Center (Olds)CanadaProposed
TADG ATL02 / Ellenwood — proposed data center (EPD proposed air permit, application 30104)United StatesAnnounced
Taylor Technology Campus (Big Watt Digital and PowerHouse)United StatesProposed
TBC Partners Cambois data centre campusUnited KingdomProposed
TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)IndiaAnnounced
Techno Digital Chennai Phase 1IndiaOperational
Telecom Egypt Regional Data Hub 2EgyptCommissioning
Telehouse 151 Front Street West — existing carrier-hotel data-centre operationsCanadaOperational
Telehouse 250 Front Street West — existing data-centre operationsCanadaOperational
Telehouse 905 King Street West — existing data-centre operationsCanadaOperational
Telehouse Docklands Existing Operations (North, North Two, East, West and South)United KingdomOperational
Telehouse Frankfurt Building N — new 3.6 MW IT data centreGermanyOperational
Telehouse TH3 Paris Magny — campus data-centre operations (23 MW available after the new 3 MW AI module)FranceOperational
Telehouse TH3 Paris Magny — new P34 data-centre building (extension under environmental-authorisation and building-permit review, PC 078 356 26 E0004)FranceAnnounced
Telehouse West 2 (TW2) Data CentreUnited KingdomPermitted
Telia New Vilnius Data CenterLithuaniaUnder construction
Ten Brinke Spata Data Center Active ConstructionGreeceUnder construction
Tencent Huailai Ruibei Cloud Data Center (腾讯怀来瑞北云数据中心) — existing data-centre buildings 1#-8# and 9# complex buildingChinaCompleted
Teraco CT1 Rondebosch ExpansionSouth AfricaUnder construction
Teraco CT1 Rondebosch — existing data-centre operationsSouth AfricaOperational
Teraco CT2 Brackenfell — existing data-centre operationsSouth AfricaOperational
Teraco DB1 Durban — existing data-centre operationsSouth AfricaOperational
Teraco Isando Campus — JB1 East and West, JB3 and JB5 data-centre operationsSouth AfricaOperational
Teraco JB2 Bredell — existing data-centre operationsSouth AfricaOperational
Teraco JB4 Bredell — existing data-centre operations (2022 build and 2025 expansion)South AfricaOperational
TeraWulf Chesapeake Data Campus (Morgantown)United StatesProposed
TeraWulf Justified Data campus (Hawesville)United StatesAnnounced
TeraWulf Lake Hawkeye data campusUnited StatesAnnounced
TeraWulf Lake Mariner data campusUnited StatesPartially operational
TeraWulf Muskie Data CampusUnited StatesAnnounced
Terranova Campinas data centre campusBrazilAnnounced
Terranova Praia Grande data center campus (proposed)BrazilProposed
Teton Digital Black Bear power and data centre campus (Swan Hills)CanadaProposed
Texas Critical Data Centers (TCDC) Phase 1 — planned AI data-centre phase of about 200 MW (20-year Vistra PPA)United StatesAnnounced
The Barn Stargate Current Data Center BuildUnited StatesUnder construction
The HIVE Hybrid Data Center — operating data centrePhilippinesOperational
Thistle Landing Data Center — data-centre campus with Buildings 1, 2 and 5 (City of Phoenix project 23-1632)United StatesAnnounced
TierPoint Allentown - TekPark (TEK) — existing data-centre and colocation operations (Building 4)United StatesOperational
TierPoint Bethlehem (BET) — existing data-centre and colocation operations (Suite 130)United StatesOperational
TierPoint Charlotte - Center Park (CL4) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Charlotte - North Myers (CL2) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Chicago (Polk St.) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Lehigh Valley (LVQ) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Little Rock (LIT) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Milwaukee (MKE) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Nashville (NSH) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Oklahoma City (OK2) — existing data-centre and colocation operations (4114 Perimeter Center Place)United StatesOperational
TierPoint Oklahoma City (OKC) — existing data-centre and colocation operations (4121 Perimeter Center Place)United StatesOperational
TierPoint Omaha - Bellevue (BEL) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Omaha - Midlands (MID) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Philadelphia (PHI) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Raleigh (RAL) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Raleigh - RTP — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Sioux Falls - East (SFE) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint St. Louis - Locust (SLL) — new data centre under development in the existing building at 2300 Locust StreetUnited StatesAnnounced
TierPoint St. Louis - Millpark (SLM) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint St. Louis - Olive (SLO) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Tulsa - Archer (TUL) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Tulsa - State Farm (TL2) — existing data-centre and colocation operationsUnited StatesOperational
TierPoint Valley Forge — existing data-centre and colocation operationsUnited StatesOperational
Tillion Aragón data center campus (Azora), Villamayor de GállegoSpainAnnounced
Tongji University Siping East Campus — A-building Data-Centre Fit-outChinaAnnounced
Tract Buckeye data center parkUnited StatesAnnounced
Trebbin Data Center — planned two-building developmentGermanyAnnounced
TRG HOU2United StatesUnder construction
Tritax Manor Farm Data Centre, Slough - 107 MW Phase 1 (appeal APP/J0350/W/25/3366043)United KingdomAnnounced
Truman Brewery Block A Data Centre, 47 Grey Eagle StreetUnited KingdomPermitted
TSUBAME4 G4-A Data Center Existing OperationsJapanOperational
Ubitus Maizuru AI Data Center DevelopmentJapanAnnounced
University of Science and Technology of China — Gaoxin Campus Data CentreChinaOperational
Vantage - Stacks Rd — one-building data center with power substation (land cleared)United StatesClearing
Vantage Data Centers Cyberjaya II campus (KUL2)MalaysiaUnder construction
Vantage Data Centers Johor campus (JHB1), Sedenak Tech ParkMalaysiaPartially operational
Vantage Data Centers Villanueva de Gállego campusSpainAnnounced
Vantage Frontier campus (Stargate Shackelford County)United StatesUnder construction
Vantage LHR11/12 (London I) - two-building data centre campus under construction (EA permit EPR/YP3329SB)United KingdomUnder construction
Vantage LHR21 (London II) - six-storey data centre under construction and commissioning (EA permit EPR/VP3225SC)United KingdomUnder construction
Vantage Lighthouse Port Washington Current Campus BuildUnited StatesUnder construction
Vantage ZRH12SwitzerlandUnder construction
Verne Mäntsälä Current Campus DevelopmentFinlandUnder construction
VIRTUS Saunderton Campus - LONDON15 to LONDON18 (four data centres, 78 MW IT planned)United KingdomAnnounced
VIRTUS Wustermark campusGermanyUnder construction
VNET Ulanqab Zero-Carbon Computing Center — building A1 mechanical, electrical and fit-out worksChinaMEP / electrical
VNET Ulanqab Zero-Carbon Computing Center — Phase 1 A2ChinaUnder construction
Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A — 10-1 data-centre machine-room buildingChinaCompleted
Volcano Engine Ningxia Zhongwei Xuanhe Compute Centre — Phase 1 (C1/C2 Super-Core Buildings)ChinaPermitted
WBS Power Baltic Data Center Campus, LublewoPolandAnnounced
WhiteFiber NC-1 — initial 40 MW colocation phase (phased delivery and commissioning)United StatesCommissioning
Wingu Africa Mbezi Data Centre — operating facilityTanzaniaOperational
Wonder Valley AI data centre park (Alberta)CanadaAnnounced
xAI Colossus 1 (Memphis)United StatesOperational
xAI Colossus 2 (Memphis)United StatesPartially operational
xAI MACROHARDRR data center (Southaven)United StatesOperational
XTX Markets Kajaani Second Data CenterFinlandUnder construction
Yondr Bristow Campus — Building 3United StatesCompleted
Yondr Hornbaker Road Campus — proposed 72 MW campusUnited StatesAnnounced
Yondr NOV2A — Allegro North Campus Building 2A core/shell and phase 1 (42455 Allegro Ln)United StatesPermitted
Yondr Slough Buildings A and B Existing OperationsUnited KingdomOperational
YTL Green Data Center Park, KulaiMalaysiaPartially operational
Zhonglian Zero-Carbon Intelligent Computing (Xuanhe) Industrial Park — Park Development (A-Zone and B-Zone, Data-Centre Buildings 1#–8#)ChinaUnder construction