Bitdeer Clarington data center site

Announced

United States · 1 project · Last reported

Summary

Bitdeer development site at Clarington, Monroe County, Ohio, with 570 MW of power under contract with an unnamed local utility. In October 2025 Bitdeer planned a bitcoin mining data center whose core infrastructure would be designed for easy conversion to AI, targeting substation energization in the first half of 2027. Through 2026 the site stayed in design and preparation: legal proceedings filed by neighboring company American Heavy Plate Solutions left the timing of power and construction uncertain, and Bitdeer's listed use for the site moved from HPC/AI in February 2026 to colocation and crypto mining by August 2026.

Source record as of 2026-08-10 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 39.77280, -80.87080 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Bitdeer Clarington data center site

Announced last observed as of · Reported status

Location: Clarington, Monroe County, Ohio, US. Bitdeer names only Clarington, Ohio. Coordinates are the village point from its Wikipedia article, which also gives the county; the site itself is not pinpointed. Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Wikipedia

Use: Crypto mining, Colocation, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity570 MWContracted · Campus · Grid connection2026-08-10Power under contract with an unnamed local utility. In October 2025 Bitdeer said the utility confirmed the full amount would be available by the end of Q3 2026; by 2026 the ready-for-service date was listed as to be updated.Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR

Companies and organizations

Timeline

DateEventActual or plannedNotesSources
2025-10-14AnnouncedActualBitdeer reported it had begun design and layout planning for the site; this is the earliest source opened for this record, not necessarily the first disclosure.Bitdeer Technologies Group via SEC EDGAR
2026-02-10OtherActualBitdeer first cited legal proceedings by neighboring American Heavy Plate Solutions as a risk to the timing of power and construction in the sources opened.Bitdeer Technologies Group via SEC EDGAR
2027-Q2First operationalPlannedOctober 2025 target for completing power and data center infrastructure, after substation energization in the first half of 2027. From February 2026 Bitdeer listed the timing as to be updated.Bitdeer Technologies Group via SEC EDGAR

Power supply

TypeDescriptionSources
Grid570 MW contracted from an unnamed local utility, with a planned substation.Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR

Bitdeer's intended use for the site has shifted: bitcoin mining built for later AI conversion (October 2025), HPC/AI (February 2026), colocation with tenant talks under way (March 2026), and colocation or crypto (August 2026). The workloads list reflects all of these. No 2026 source opened reports construction beyond design and preparation work.

Sources for these details
Companies
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
Source and location review
Status source
Bitdeer reports unaudited financial results for the second quarter of 2026 (Form 6-K, Exhibit 99.1) evidence row
Bitdeer Technologies Group via SEC EDGAR · published 2026-08-10 · Regulatory filing
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 78 days before the data update on 2026-10-27

Location details
Coordinates
39.77280, -80.87080
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Bitdeer names only Clarington, Ohio. Coordinates are the village point from its Wikipedia article, which also gives the county; the site itself is not pinpointed.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
a2bccfaf

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Bitdeer Clarington data center site
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Bitdeer announces February 2026 production and operations update (Form 6-K, Exhibit 99.1)
Archived copy
Bitdeer Technologies Group via SEC EDGAR
Regulatory filing
Imported: Record, Metric: Power Capacitysource-terms-not-recordedBitdeer Technologies Group via SEC EDGAR193dc3cb4db6eb873a7ca1d421ed4aabb50aaa55a2f9f786ef2b2843b7382954
Factual source record; not the publisher page
Bitdeer announces January 2026 production and operations update (Form 6-K, Exhibit 99.1)
Archived copy
Bitdeer Technologies Group via SEC EDGAR
Regulatory filing
Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Developersource-terms-not-recordedBitdeer Technologies Group via SEC EDGAR11f9dfa32ef89cf6730c67b8eeca85ca3cacc3bc57157dfe0e207a2912569c2e
Factual source record; not the publisher page
Bitdeer announces September 2025 production and operations update (Form 6-K, Exhibit 99.1)
Archived copy
Bitdeer Technologies Group via SEC EDGAR
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developersource-terms-not-recordedBitdeer Technologies Group via SEC EDGAR594b0607aa36d7f9a24ae6585c9cd1d646ab15c37cc352e282930de0803d1d76
Factual source record; not the publisher page
Bitdeer reports unaudited financial results for the second quarter of 2026 (Form 6-K, Exhibit 99.1)
Archived copy
Bitdeer Technologies Group via SEC EDGAR
Regulatory filing
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Power Source: Grid, Role: Developersource-terms-not-recordedBitdeer Technologies Group via SEC EDGARc31770395350de001348390de07d937b25b68d66ab78bc541b894f62a65c8c3f
Factual source record; not the publisher page
Clarington, Ohio
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia7c4c4b92e64401f6300cdab059e083c0135d0ddb54a193b45cc2ee13cb8b735c
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Bitdeer Clarington data center site [site vcc-site-4551992e6d4d1487d1ab]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4551992e6d4d1487d1ab/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction