Bitdeer Clarington data center site
Announced
United States · 1 project · Last reported
Summary
Bitdeer development site at Clarington, Monroe County, Ohio, with 570 MW of power under contract with an unnamed local utility. In October 2025 Bitdeer planned a bitcoin mining data center whose core infrastructure would be designed for easy conversion to AI, targeting substation energization in the first half of 2027. Through 2026 the site stayed in design and preparation: legal proceedings filed by neighboring company American Heavy Plate Solutions left the timing of power and construction uncertain, and Bitdeer's listed use for the site moved from HPC/AI in February 2026 to colocation and crypto mining by August 2026.
Source record as of 2026-08-10 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 39.77280, -80.87080 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Bitdeer Clarington data center site
Announced last observed as of · Reported status
Location: Clarington, Monroe County, Ohio, US. Bitdeer names only Clarington, Ohio. Coordinates are the village point from its Wikipedia article, which also gives the county; the site itself is not pinpointed. Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Wikipedia
Use: Crypto mining, Colocation, Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 570 MW | Contracted · Campus · Grid connection | 2026-08-10 | Power under contract with an unnamed local utility. In October 2025 Bitdeer said the utility confirmed the full amount would be available by the end of Q3 2026; by 2026 the ready-for-service date was listed as to be updated. | Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Bitdeer Technologies Group | Developer | Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-10-14 | Announced | Actual | Bitdeer reported it had begun design and layout planning for the site; this is the earliest source opened for this record, not necessarily the first disclosure. | Bitdeer Technologies Group via SEC EDGAR |
| 2026-02-10 | Other | Actual | Bitdeer first cited legal proceedings by neighboring American Heavy Plate Solutions as a risk to the timing of power and construction in the sources opened. | Bitdeer Technologies Group via SEC EDGAR |
| 2027-Q2 | First operational | Planned | October 2025 target for completing power and data center infrastructure, after substation energization in the first half of 2027. From February 2026 Bitdeer listed the timing as to be updated. | Bitdeer Technologies Group via SEC EDGAR |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | 570 MW contracted from an unnamed local utility, with a planned substation. | Bitdeer Technologies Group via SEC EDGAR; Bitdeer Technologies Group via SEC EDGAR |
Bitdeer's intended use for the site has shifted: bitcoin mining built for later AI conversion (October 2025), HPC/AI (February 2026), colocation with tenant talks under way (March 2026), and colocation or crypto (August 2026). The workloads list reflects all of these. No 2026 source opened reports construction beyond design and preparation work.
Sources for these details
- Bitdeer announces September 2025 production and operations update (Form 6-K, Exhibit 99.1) — Bitdeer Technologies Group via SEC EDGAR; 2025-10-14
- Bitdeer announces January 2026 production and operations update (Form 6-K, Exhibit 99.1) — Bitdeer Technologies Group via SEC EDGAR; 2026-02-10
- Bitdeer announces February 2026 production and operations update (Form 6-K, Exhibit 99.1) — Bitdeer Technologies Group via SEC EDGAR; 2026-03-16
- Bitdeer reports unaudited financial results for the second quarter of 2026 (Form 6-K, Exhibit 99.1) — Bitdeer Technologies Group via SEC EDGAR; 2026-08-10 · Archived source
- Clarington, Ohio — Wikipedia; publication date not stated
- Companies
Source and location review
- Status source
- Bitdeer reports unaudited financial results for the second quarter of 2026 (Form 6-K, Exhibit 99.1) evidence row
Bitdeer Technologies Group via SEC EDGAR · published 2026-08-10 · Regulatory filing - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 78 days before the data update on 2026-10-27
Location details
- Coordinates
- 39.77280, -80.87080
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Bitdeer names only Clarington, Ohio. Coordinates are the village point from its Wikipedia article, which also gives the county; the site itself is not pinpointed.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- a2bccfaf
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Bitdeer announces February 2026 production and operations update (Form 6-K, Exhibit 99.1) Archived copy | Bitdeer Technologies Group via SEC EDGAR Regulatory filing | Imported: Record, Metric: Power Capacity | source-terms-not-recorded | Bitdeer Technologies Group via SEC EDGAR | 193dc3cb4db6eb873a7ca1d421ed4aabb50aaa55a2f9f786ef2b2843b7382954Factual source record; not the publisher page | ||
| Bitdeer announces January 2026 production and operations update (Form 6-K, Exhibit 99.1) Archived copy | Bitdeer Technologies Group via SEC EDGAR Regulatory filing | Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Developer | source-terms-not-recorded | Bitdeer Technologies Group via SEC EDGAR | 11f9dfa32ef89cf6730c67b8eeca85ca3cacc3bc57157dfe0e207a2912569c2eFactual source record; not the publisher page | ||
| Bitdeer announces September 2025 production and operations update (Form 6-K, Exhibit 99.1) Archived copy | Bitdeer Technologies Group via SEC EDGAR Regulatory filing | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developer | source-terms-not-recorded | Bitdeer Technologies Group via SEC EDGAR | 594b0607aa36d7f9a24ae6585c9cd1d646ab15c37cc352e282930de0803d1d76Factual source record; not the publisher page | ||
| Bitdeer reports unaudited financial results for the second quarter of 2026 (Form 6-K, Exhibit 99.1) Archived copy | Bitdeer Technologies Group via SEC EDGAR Regulatory filing | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Power Source: Grid, Role: Developer | source-terms-not-recorded | Bitdeer Technologies Group via SEC EDGAR | c31770395350de001348390de07d937b25b68d66ab78bc541b894f62a65c8c3fFactual source record; not the publisher page | ||
| Clarington, Ohio Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 7c4c4b92e64401f6300cdab059e083c0135d0ddb54a193b45cc2ee13cb8b735cFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Bitdeer Clarington data center site [site vcc-site-4551992e6d4d1487d1ab]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4551992e6d4d1487d1ab/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction