| 1623 Farnam Carrier Hotel Data Center, 1623 Farnam Street, Omaha | United States | Operational | | 1 | Point | 1623 Farnam, LLC |
| 1G Servers LaSalle Data Center (3719 E La Salle St, Phoenix) | United States | Completed | | 1 | Point | City of Phoenix, Arizona (Planning and Development Department) |
| 400 South LaSalle Data Center (Chicago) | United States | Permitted | | 1 | Point | City of Chicago, Department of Buildings |
| 934 Central Data Center (10th Street and Central, downtown Kansas City, Missouri) | United States | Announced | | 1 | Point | City of Kansas City, Missouri (City Clerk, Legistar legislative system) |
| Abernathy HPC campus (TeraWulf and Fluidstack joint venture) | United States | Under construction | | 1 | Point | TeraWulf |
| Accokeek Center Data Center Campus (Richmond Highway, Stafford County) | United States | Announced | | 1 | Point | Stafford County, Virginia (Planning Commission; meeting records on the county CivicClerk portal) |
| Alamo Mission Data Center Complex (Red Oak, Ellis County) | United States | Announced | | 1 | Point | City of Red Oak, Texas |
| Aligned Conesville CMH-02 Data Center Campus | United States | Site preparation | | 1 | Point | CCU Coal & Construction |
| Aligned Pataskala Data Center Campus | United States | Announced | | 1 | Point | Aligned Data Centers |
| Aligned Phoenix Data Center Campus (2500 W Union Hills Dr) | United States | Completed | | 1 | Point | City of Phoenix, Arizona (Planning and Development Department) |
| Aligned Project Phoenix, Shippingport | United States | Announced | | 1 | Point | Aligned Data Centers |
| Amazon and STACK campus at Resilient Technology Park, Shreveport | United States | Announced | | 1 | Point | Louisiana Economic Development |
| Amazon Falls Township Innovation Campus | United States | Under construction | | 1 | Polygon | Amazon Innovation Campuses in Pennsylvania |
| Amazon Salem Township Innovation Campus | United States | Partially operational Under construction | | 2 | Polygon | Amazon Innovation Campuses in Pennsylvania; Amazon Innovation in PA (project website) |
| Amazon Web Services Hobart data center campus | United States | Announced | | 1 | Point | FOX 32 Chicago |
| Amazon Web Services King George County campus (Birchwood site) | United States | Proposed | | 1 | Point | Baxtel |
| Apple Prineville Data Center Campus | United States | Announced Operational | | 2 | Point | City of Prineville, Oregon |
| Applied Digital Delta Forge 1 Campus | United States | Under construction | | 1 | Point | Applied Digital Corporation |
| Applied Digital Delta Forge 2 | United States | Under construction | | 1 | Point | Applied Digital via SEC EDGAR |
| Applied Digital Jamestown Data Center Hosting Facility (2671 and 2683 Highway 20 SE, Jamestown, North Dakota) | United States | Operational | | 1 | Point | Applied Digital Corporation |
| Applied Digital Polaris Forge 1 Campus | United States | Operational Partially operational Under construction | | 3 | Point | Applied Digital; Applied Digital Corporation |
| Applied Digital Polaris Forge 2 Campus | United States | Under construction | | 2 | Polygon | Applied Digital; Applied Digital Corporation |
| Applied Digital Polaris Forge 3 | United States | Under construction | | 1 | Point | Applied Digital |
| AVAIO Digital Leo Data Center Campus (Project Leo, East 145th Street, Pulaski County) | United States | Announced | | 1 | Point | AVAIO Digital Partners |
| AVAIO Digital Project Hercules Data Center Campus (Appomattox Center for Business and Commerce) | United States | Announced | | 1 | Point | Appomattox County, Virginia (Board of Supervisors; agenda and minutes portal) |
| AVAIO Digital Taurus Data Center Campus | United States | Under construction | | 1 | Point | AVAIO Digital Partners |
| AWS ALE061 San Antonio Data Center Campus (Bitter Blue, 12807 Donop Road) | United States | Permitted | | 1 | Point | City of San Antonio, Development Services Department (Open Data SA) |
| AWS Clinton data center (former Delphi plant) | United States | Operational | | 1 | Point | Amazon |
| AWS Fayette County data center site | United States | Announced | | 1 | Point | Amazon |
| AWS Lake Anna Technology Campus | United States | Under construction | | 1 | Point | County of Louisa, Virginia (Board of Supervisors) |
| AWS New Carlisle data center campus (Project Rainier) | United States | Partially operational | | 1 | Point | WNDU |
| AWS Northeast Creek Technology Campus (North Creek Technology Campus, Louisa County) | United States | Announced | | 1 | Point | County of Louisa, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal) |
| AWS PHX065 Data Center Campus (10464 E Pecos Rd, Mesa, Arizona) | United States | Under construction | | 1 | Point | City of Mesa, Arizona (Development Services) |
| AWS Richmond County data center campus | United States | Under construction | | 1 | Point | Amazon |
| AWS Vicksburg data center campus | United States | Announced | | 1 | Point | Office of Governor Tate Reeves |
| Balico gas-powered data center campus, Pittsylvania County | United States | Cancelled | | 1 | Point | Cardinal News |
| Bitdeer and Geis Shalersville AI data center campus | United States | Proposed | | 1 | Point | The Portager |
| Bitdeer Clarington data center site | United States | Announced | | 1 | Point | Bitdeer Technologies Group via SEC EDGAR |
| Bitdeer Massillon Ohio Campus | United States | Under construction | | 1 | Point | Bitdeer Technologies Group |
| Bitdeer Weathersfield (Niles) development site | United States | Announced | | 1 | Point | Bitdeer Technologies Group via SEC EDGAR |
| Bitdeer Wenatchee Washington Campus | United States | Site preparation | | 1 | Point | Bitdeer Technologies Group |
| Bogle Drive Data Center Facility (Chantilly, Fairfax County) | United States | Permitted | | 1 | Point | Fairfax County, Virginia (Land Development Services / Department of Information Technology GIS) |
| Borden Data Center, 11484 US Highway 180, Gail (Borden County) | United States | Announced | | 1 | Point | Texas Commission on Environmental Quality (via data.texas.gov) |
| Carbon Node East Data Center Campus (Nesquehoning) | United States | Announced | | 1 | Point | Pennsylvania Department of Environmental Protection |
| Chirisa Chesterfield Campus | United States | Under construction | | 1 | Point | Chesterfield County |
| Cipher Barber Lake data center | United States | Under construction | | 1 | Point | Cipher Digital |
| Cipher Digital Black Pearl Wink Data Center Campus | United States | Partially operational Under construction | | 2 | Point | Cipher Digital Inc.; Cipher Digital Inc. via SEC EDGAR |
| Cipher Digital Stingray Andrews Data Center Campus | United States | Under construction | | 1 | Point | Cipher Digital Inc. |
| Cologix Ashburn Data Centers (ASH1 and ASH2, Beaumeade Circle) | United States | Under construction | | 1 | Point | Cologix, Inc. |
| Cologix JAX1 Data Center (421 West Church Street, Jacksonville) | United States | Operational | | 1 | Point | Cologix, Inc. |
| Cologix JAX2 Data Center (4800 Spring Park Road, Jacksonville) | United States | Operational | | 1 | Point | Cologix, Inc. |
| Colovore Alliance Data Center (Fort Worth) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| Colovore Hutto Data Center | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| Colovore RNO01 Data Center Campus | United States | Operational Under construction | | 2 | Point | Colovore |
| Colovore Santa Clara Campus (SJC01, 1101 Space Park Drive, and SJC02, 3060 Raymond Street) | United States | Operational | | 1 | Point | Colovore |
| Compass Datacenters CLT I Campus, 255 Stamey Farm Road, Statesville | United States | Announced | | 1 | Point | North Carolina Department of Environmental Quality, Division of Air Quality |
| Compass Datacenters DFW III Campus (Red Oak) | United States | Announced | | 3 | Point | Texas Department of Licensing and Regulation |
| Compass Datacenters Hoffman Estates campus | United States | Under construction | | 1 | Point | Village of Hoffman Estates, Illinois |
| Compass Datacenters Meridian campus | United States | Under construction | | 1 | Point | Compass Datacenters |
| Compass Datacenters PHX2 El Mirage Campus (12500 W Joe R Ramirez Rd, El Mirage, Arizona) | United States | Under construction | | 1 | Point | Compass Datacenters |
| Core Scientific Denton data center (CoreWeave) | United States | Under construction | | 1 | Point | Core Scientific |
| Core Scientific Hunt County data center site | United States | Announced | | 1 | Point | Core Scientific, Inc. via SEC EDGAR |
| Core Scientific Muskogee data center campus | United States | Partially operational | | 1 | Point | Core Scientific |
| Core Scientific Pecos Cottonwood Campus | United States | Announced Under construction | | 2 | Point | Adam Sullivan, Core Scientific CEO, on LinkedIn; Core Scientific |
| CoreSite DA1 Irving | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| CoreSite DE3 Race Street Campus | United States | Under construction | | 1 | Polygon official boundary | CoreSite |
| CoreWeave Kenilworth NEST 11 AI data center | United States | Under construction | | 1 | Point | CoreWeave |
| CoreWeave/Chirisa Lancaster Greenfield Road Campus | United States | Under construction | | 1 | Point | Chirisa Technology Parks |
| Cross Mill Center Data Center Site (Sycolin Road, south of Leesburg, Loudoun County) | United States | Announced | | 1 | Point | Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information) |
| Crossroads Technology Campus (Mills Drive / Eagle Drive, Spotsylvania County) | United States | Announced | | 1 | Point | Spotsylvania County, Virginia (Planning Commission and Board of Supervisors meeting records on the county CivicClerk portal) |
| Crusoe Abilene AI factory campus for Microsoft | United States | Under construction | | 1 | Point | Crusoe |
| Crusoe and Lancium Childress AI data center campus | United States | Announced | | 1 | Point | Crusoe |
| Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade) | United States | Permitted | | 1 | Point | Laramie County, Wyoming (Board of County Commissioners) |
| CyrusOne Aurora Diehl Road Campus | United States | Completed | | 1 | Point | CyrusOne |
| CyrusOne Bosque County data center campus (Thad Hill) | United States | Under construction | | 1 | Point | Calpine |
| CyrusOne Fort Worth Campus (DFW7 and DFW8, Asphalt Drive) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| CyrusOne Freestone County data center campus | United States | Announced | | 1 | Point | CyrusOne |
| CyrusOne Mesa PHX20 Data Center Campus (3255 S 96th St, Mesa, Arizona) | United States | Under construction | | 1 | Point | City of Mesa, Arizona (Development Services) |
| CyrusOne Yorkville Technology Campus | United States | Site preparation | | 1 | Point | CyrusOne |
| DataBank Ashburn Campus (IAD1, IAD3 and IAD4, Red Rum Drive) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank ATL1 Midtown Atlanta (Coda, 760 West Peachtree Street) | United States | Operational | | 1 | Point | DataBank, Ltd. |
| DataBank Atlanta West End Complex (ATL2 and ATL3, White Street SW) | United States | Operational | | 1 | Point | DataBank, Ltd. |
| DataBank Centennial Campus (Centennial, Colorado) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank DEN1 Englewood Data Center (393 Inverness Parkway) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank DEN3 Downtown Denver Data Center (1500 Champa Street) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank DEN4 Westminster Data Center (7579 W. 103rd Avenue) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank Granite Point Campus (Bluffdale, Utah) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank LAS1 Las Vegas Data Center (7185 Pollock Drive) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank Lithia Springs Campus (ATL5 and ATL6, 4764 Bakers Ferry Rd SW, South Fulton) | United States | Under construction | | 1 | Point | DataBank, Ltd. |
| DataBank MSP2 East Twin Cities Data Center (3255 Neil Armstrong Blvd, Eagan, Minnesota) | United States | Operational | | 1 | Point | DataBank |
| DataBank Orangeburg Campus (LGA3 and LGA4, 2000 Corporate Drive, Orangetown) | United States | Announced Operational | | 2 | Point | DataBank Holdings, Ltd. |
| DataBank Plano Campus (Plano, Texas) | United States | Operational | | 1 | Point | DataBank, Ltd. |
| DataBank Red Oak Campus | United States | Under construction | | 1 | Point | DataBank |
| DataBank SFO1 Silicon Valley Data Center (5101 Lafayette Street, Santa Clara) | United States | Operational | | 1 | Point | DataBank Holdings, Ltd. |
| DataBank SLC1 Downtown Salt Lake City Data Center (179 E Social Hall Ave) | United States | Operational | | 1 | Point | DataBank, Ltd. |
| DataBank Summit Park Campus (PIT2, 35 Summit Park Dr, North Fayette Township, Pennsylvania) | United States | Operational | | 1 | Point | DataBank, Ltd. |
| DataOne Vineland Two-Phase AI Data Center Facility | United States | Under construction | | 2 | Polygon | City of Vineland Planning Board; Nebius |
| DC BLOX Huntsville Data Center (333 Diamond Drive NW) | United States | Operational | | 1 | Point | DC BLOX, Inc. |
| DC BLOX Palm Coast Cable Landing Station and Colocation Campus | United States | Under construction | | 1 | Point | City of Palm Coast |
| Digi Power X Columbiana AI Data Center Campus | United States | Under construction | | 1 | Point | Digi Power X Inc. (distributed by ACCESS Newswire) |
| Digital Realty 330 E. Cermak Site | United States | Under construction | | 1 | Polygon | Digital Realty |
| Digital Realty Astra North Campus (Astra Enterprise Park, De Soto, Kansas) | United States | Announced | | 1 | Point | City of De Soto, Kansas |
| Digital Realty ATL13 (56 Marietta Street, Atlanta) | United States | Operational | | 1 | Point | Digital Realty |
| Digital Realty ATL14 (250 Williams Street, Atlanta) | United States | Operational | | 1 | Point | Digital Realty |
| Digital Realty Digital Dulles Campus | United States | Under construction | | 1 | Point | Digital Realty |
| Digital Realty Garland Campus | United States | Announced | | 2 | Point | Texas Department of Licensing and Regulation |
| Digital Realty Lewisville Campus (Digital Convergence: DFW26 and DFW44) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| Dulles Electric Data Centers Site (Shaw Road and South Sterling Boulevard, Sterling, Loudoun County) | United States | Announced | | 1 | Point | Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information) |
| EdgeConneX Bastrop Campus (AUS01, FM 535, Cedar Creek) | United States | Announced | | 2 | Point | Texas Department of Licensing and Regulation |
| EdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona) | United States | Under construction | | 2 | Point | City of Mesa, Arizona (Development Services) |
| EdgeCore AS02 Sterling Site | United States | Under construction | | 1 | Polygon | Loudoun County, Virginia (Department of Building and Development; county GIS) |
| EdgeCore Louisa County campus | United States | Announced | | 1 | Point | EdgeCore Digital Infrastructure |
| EdgeCore Mesa data center campus | United States | Partially operational | | 1 | Point | EdgeCore Digital Infrastructure |
| Edged Chicago Aurora Data Center Campus | United States | Shell | | 1 | Point | Edged US |
| Edged Council Bluffs Data Center Campus | United States | Shell | | 1 | Point | Edged US |
| Edged Fort Worth Project Outpost Campus | United States | Announced Permitted | | 2 | Point | City of Fort Worth (Development Services); Texas Department of Licensing and Regulation |
| Edged Kansas City Data Center (3420 N Arlington Ave, Kansas City, Missouri) | United States | Completed | | 1 | Point | City of Kansas City, Missouri |
| Equinix CH5 Data Center, 2001 Lunt Ave, Elk Grove Village | United States | Permitted | | 1 | Point | Cook County Assessor's Office |
| Equinix Great Oaks South Data Center Campus (SV12, SV18 and SV19), 123-131 Great Oaks Blvd, San Jose | United States | Operational Permitted | | 2 | Point | City of San Jose, Planning, Building and Code Enforcement (San Jose CA Open Data Portal); Equinix, Inc. (Equinix Community, community.equinix.com) |
| Equinix HO1 Houston (1515 Aldine Meadows Road) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| Farmington Technology Park (Tract data-center campus, Farmington, Minnesota) | United States | Announced | | 1 | Point | City of Farmington, Minnesota |
| Fermi America Project Matador campus | United States | Under construction | | 1 | Point | U.S. Securities and Exchange Commission (Fermi Inc. filing) |
| Flexential Douglasville North River Campus | United States | Under construction | | 1 | Point | Flexential, distributed by PR Newswire |
| Flexential Hillsboro Starr Campus | United States | Under construction | | 1 | Point | Flexential, distributed by PR Newswire |
| Flexential Parker Compark Campus | United States | Under construction | | 1 | Point | Flexential, distributed by PR Newswire |
| Galaxy Helios Data Center Campus | United States | Foundations Partially operational | | 2 | Point | Galaxy; Galaxy Digital |
| Gardner Property Data Center Campus (McGraws Corner Drive and Nolan Road, Gainesville, Prince William County) | United States | Announced | | 1 | Point | Prince William County, Virginia (Planning Office GIS, CountyMapper Land Development service) |
| Goodman LAX01 Los Angeles Program Anchor | United States | Under construction | | 1 | Point | Goodman Group |
| Google / Beale Tulsa County Project Clydesdale Campus | United States | Under construction | | 1 | Point | Beale Infrastructure; joint Google and Beale announcement |
| Google Armstrong County data center campus (Crusoe Goodnight) | United States | Under construction | | 1 | Point | Crusoe |
| Google Bermuda Hundred Data Center Campus | United States | Under construction | | 1 | Point | Chesterfield County |
| Google Cedar Rapids data center campus (Big Cedar Industrial Center) | United States | Under construction | | 1 | Point | Epoch AI |
| Google Columbia County Data Center Campus (GreenPoint) | United States | Announced | | 1 | Point | Columbia County, Georgia |
| Google Columbus Data Center Campus (225 Rathmell Road / 5076 South High Street) | United States | Completed | | 1 | Point | City of Columbus, Ohio (Department of Building and Zoning Services) |
| Google Fort Wayne data center | United States | Operational | | 1 | Point | Google |
| Google Franklin Township data center proposal (Project Flo) | United States | Cancelled | | 1 | Point | Inside INdiana Business (Indianapolis Business Journal) |
| Google Journey data center campus (Haskell County) | United States | Under construction | | 1 | Point | Texas Department of Licensing and Regulation |
| Google Kansas City data center campus (Hunt Midwest Business Center) | United States | Under construction | | 1 | Point | Google |
| Google Mayes County Data Center Campus (Pryor, MidAmerica Industrial Park) | United States | Operational | | 1 | Point | Google LLC |
| Google Meitner Energy Center data center (Gray and Roberts counties) | United States | Under construction | | 1 | Point | Google |
| Google Mesa Red Hawk Data Center Campus | United States | Completed Under construction | | 2 | Point | City of Mesa, Arizona (Development Services) |
| Google Muskogee County Data Center Campus (Acacia House, near Council Hill) | United States | Announced | | 1 | Point | Google LLC |
| Google New Albany Data Center Campus (1101 Beech Rd SW and 5266 Babbitt Rd) | United States | Operational | | 1 | Point | City of New Albany, Ohio |
| Google Project Cannoli Data Center Campus (Van Buren Township) | United States | Announced | | 1 | Point | Wayne County, Michigan (County Commission) |
| Google Project Skyway data center campus (Pine Island Industrial PUD, Pine Island, Minnesota) | United States | Announced | | 1 | Point | Minnesota Public Utilities Commission |
| Google Stillwater data center campus | United States | Announced | | 1 | Point | Baxtel |
| Google West Memphis data center campus | United States | Under construction | | 1 | Point | Action News 5 (WMC) |
| HJS Data Building Site (2565 Harrison Road, New Albany) | United States | Announced | | 1 | Point | City of New Albany, Ohio |
| Homer City Energy Campus | United States | Under construction | | 1 | Point | Homer City Generation, L.P. |
| Horizon 1 Kearney Data Center Campus (Tech One, Kearney, Nebraska) | United States | Permitted | | 1 | Point | City of Kearney, Nebraska (City Clerk) |
| Hut 8 Beacon Point AI Data Center Campus | United States | Under construction | | 2 | Point | Hut 8 Corp.; Hut 8 Corp. via SEC EDGAR |
| Hut 8 River Bend AI Data Center Campus | United States | Under construction | | 2 | Point | Hut 8 Corp.; WAFB |
| IREN Childress data center campus | United States | Partially operational | | 1 | Point | U.S. Securities and Exchange Commission (IREN filing) |
| IREN Kiowa data center campus | United States | Proposed | | 1 | Point | News On 6 |
| IREN Sweetwater 2 campus, FM 540, Fisher County (near Hamlin) | United States | Announced | | 1 | Point | Texas Commission on Environmental Quality (via data.texas.gov) |
| Iron Mountain MIA-1 Miami Data Center | United States | Under construction | | 1 | Point | Iron Mountain Incorporated |
| Iron Mountain NJE-1 New Jersey Data Center | United States | Under construction | | 1 | Point | Iron Mountain Incorporated |
| Iron Mountain VA-9 Northern Virginia Data Center | United States | Under construction | | 1 | Point | Iron Mountain Incorporated |
| J5 LLC Piqua Data Center Campus (Washington Road) | United States | Announced | | 1 | Point | City of Piqua, Ohio (City Commission, via CivicClerk) |
| Jefferson Lab Newport News Campus | United States | Under construction | | 1 | Point | Thomas Jefferson National Accelerator Facility |
| Joliet Technology Center | United States | Announced | | 1 | Point | Bisnow |
| Keel Moses Lake Data Campus (Grant County, Washington) | United States | Under construction | | 1 | Point | Keel Infrastructure Corp. (formerly Bitfarms Ltd.) |
| La Osa Energy Center (Vermaland), Pinal County | United States | Cancelled | | 1 | Point | KJZZ |
| Lambda Kansas City AI factory | United States | Announced | | 1 | Point | Lambda |
| Lancium Clean Campus Abilene AI Data Center | United States | Partially operational Under construction | | 2 | Point | Epoch AI; Oracle |
| Lunavi Cheyenne Data Center (340 Progress Circle) | United States | Operational | | 1 | Point | Lunavi, Inc. |
| Madera Farm Data Center Campus (Nokesville Road and Farmview Road, Nokesville, Prince William County) | United States | Announced | | 1 | Point | Prince William County, Virginia (Planning Office GIS, CountyMapper Land Development service) |
| Manekin Plaza Data Center Site (Manekin Plaza, Loudoun Tech Center, Sterling, Loudoun County) | United States | Announced | | 1 | Point | Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information) |
| Massaponax Tech Campus (Massaponax Church Road, Summit Crossing Road and Mills Drive, Spotsylvania County) | United States | Announced | | 1 | Point | Spotsylvania County, Virginia (Planning Commission and Board of Supervisors meeting records on the county CivicClerk portal) |
| Meta Beaver Dam data center | United States | Under construction | | 1 | Point | Meta Platforms |
| Meta Bowling Green data center | United States | Under construction | | 1 | Point | Meta Platforms |
| Meta Cheyenne data center | United States | Under construction | | 1 | Point | Meta Platforms |
| Meta DeKalb Data Center | United States | Partially operational | | 1 | Point | City of DeKalb, Illinois |
| Meta Eagle Mountain Data Center | United States | Announced Operational | | 2 | Point | Meta |
| Meta El Paso Data Center | United States | Under construction | | 1 | Point | Meta |
| Meta Fort Worth Data Center | United States | Operational | | 1 | Point | Meta Platforms, Inc. (Meta Data Centers) |
| Meta Gallatin Data Center | United States | Partially operational | | 1 | Point | Nashville Business Journal (via Gallatin Economic Development Agency) |
| Meta Kansas City data center | United States | Operational | | 1 | Point | Meta Platforms |
| Meta Kuna Data Center | United States | Operational | | 1 | Point | KBOI 2 (CBS2 Idaho News) |
| Meta Lebanon Indiana Data Center Campus | United States | Under construction | | 1 | Point | City of Lebanon Board of Zoning Appeals |
| Meta Los Lunas Data Center (4250 Messenger Loop NW, Huning Ranch Business Park) | United States | Operational | | 1 | Point | Meta Platforms, Inc. |
| Meta Mesa Data Center | United States | Expansion | | 1 | Point | City of Mesa, Arizona (Development Services) |
| Meta Montgomery data center | United States | Under construction | | 1 | Point | Meta Platforms |
| Meta New Albany data center campus (Prometheus) | United States | Partially operational | | 1 | Point | City of New Albany, Ohio |
| Meta Richland Parish Data Center | United States | Under construction | | 2 | Point | Louisiana Economic Development; Turner Construction Company |
| Meta Temple Data Center | United States | Operational | | 1 | Point | KWTX |
| Meta Tulsa data center | United States | Under construction | | 1 | Point | Meta Platforms |
| Microsoft Alviso San Jose Datacenter Campus | United States | Under construction | | 1 | Point | HITT Contracting |
| Microsoft Conover Lyle Creek Data Center | United States | Under construction | | 1 | Point | Microsoft |
| Microsoft EKI Campus, 12501 Cleveland Road, Granger (St. Joseph County, Indiana) | United States | Announced | | 1 | Point | Indiana Department of Environmental Management (IDEM), Office of Air Quality |
| Microsoft Heath Datacenter | United States | Site preparation | | 1 | Point | Microsoft |
| Microsoft Hebron Datacenter | United States | Site preparation | | 1 | Point | Microsoft |
| Microsoft La Porte Indiana Campus | United States | Under construction | | 1 | Polygon | Microsoft |
| Microsoft Mount Pleasant Datacenter Campus | United States | Partially operational Under construction | | 2 | Polygon | Microsoft; Village of Mount Pleasant, Wisconsin |
| Microsoft Mount Pleasant Durand Avenue datacenter campus | United States | Under construction | | 1 | Point | Microsoft Local |
| Microsoft Mount Pleasant International Drive datacenter campus | United States | Announced | | 1 | Point | Spectrum News 1 |
| Microsoft New Albany Datacenter | United States | Site preparation | | 1 | Point | Microsoft |
| Microsoft Pecos datacenter campus | United States | Announced | | 1 | Point | Microsoft |
| Microsoft Silver Springs Datacenter | United States | Site preparation | | 1 | Point | Microsoft |
| Microsoft Union City data center campus (EdgeConneX) | United States | Under construction | | 1 | Point | The Atlanta Journal-Constitution |
| Microsoft Wellington Datacenter Site (Gainesville) | United States | Announced | | 1 | Point | Microsoft |
| Midas Compute Big Spring Facility, 1202 N FM 700, Big Spring (Howard County) | United States | Announced | | 1 | Point | Texas Commission on Environmental Quality (via data.texas.gov) |
| Monarch Compute Campus Point Pleasant | United States | Under construction | | 1 | Point | Nscale Limited |
| Monticello Tech Technology Campus (Edmonson Business Center, Monticello, Minnesota) | United States | Announced | | 1 | Point | City of Monticello, Minnesota (Community Development) |
| Morris Technology Park | United States | Announced | | 1 | Point | Bisnow |
| Nebius Birmingham AI factory (Lakeshore Parkway) | United States | Announced | | 1 | Point | Nebius Group N.V. |
| Nebius Independence AI factory | United States | Under construction | | 1 | Point | Nebius |
| New Hill Digital Campus | United States | Cancelled | | 1 | Point | Bisnow |
| Novva Colorado Springs Data Center Campus (650 Sybilla Lane) | United States | Operational | | 1 | Point | Novva Data Centers |
| Novva Las Vegas Data Center (6115 Nicco Way, North Las Vegas) | United States | Operational | | 1 | Point | Novva Data Centers |
| Novva Mesa Data Center Campus (Ellsworth Rd and Warner Rd, Mesa, Arizona) | United States | Announced | | 1 | Point | Novva Data Centers |
| Novva Utah Data Center Campus (West Jordan, Utah) | United States | Operational | | 1 | Point | Novva Data Centers |
| NTT Dallas Data Center Campus | United States | Under construction | | 1 | Point | NTT Global Data Centers |
| NTT Global Data Centers Chicago Campus, Hamilton Lakes, Pierce Road, Itasca (DuPage County) | United States | Under construction | | 1 | Point | Village of Itasca, Illinois |
| NTT Global Data Centers Phoenix (Mesa) Campus (10256 E Elliot Rd, Mesa, Arizona) | United States | Under construction | | 1 | Point | City of Mesa, Arizona (Development Services) |
| OKC2 (6000 N Shartel Ave, Oklahoma City) | United States | Announced | | 1 | Point | Oklahoma Department of Environmental Quality, Air Quality Division |
| Old Ocean Data Center (Nightpeak Energy) | United States | Proposed | | 1 | Point | Public Citizen |
| OpenAI Project Camellia (Effingham County, Georgia) | United States | Announced | | 1 | Point | OpenAI |
| Oracle Project Jupiter Doña Ana County AI Data Center Campus | United States | Under construction | | 1 | Polygon | Oracle Corporation |
| Page, Arizona data center site (Huntley LLC) | United States | Proposed | | 1 | Point | City of Page |
| Pemberton Data Center Campus (Centreport Gateway Pemberton Tech Center, Centreport Parkway, Stafford County) | United States | Announced | | 1 | Point | Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal) |
| Pennsylvania Digital I (PAX-1), Middlesex Township | United States | Announced | | 1 | Point | Construction Review Online |
| Potomac Church Tech Center Data Center Campus (125 Old Potomac Church Road, Stafford County) | United States | Completed | | 1 | Point | Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal) |
| PowerHouse 95 data center campus | United States | Announced | | 1 | Point | PowerHouse Data Centers |
| PowerHouse Grand Prairie campus (PowerHouse and Provident) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| PowerHouse Louisville hyperscale campus (Camp Ground Road) | United States | Under construction | | 1 | Point | WAVE |
| Project Bedrock Data Center (Carmen Avenue, Inver Grove Heights) | United States | Permitted | | 1 | Point | City of Inver Grove Heights, Minnesota |
| Project Blue | United States | Under construction | | 1 | Point | KOLD News 13 |
| Project Celtics Data Center Campus (Loudoun County) | United States | Permitted | | 1 | Point | Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information) |
| Project Delta Data Center Site (Walnut Cove, Stokes County) | United States | Announced | | 1 | Point | Stokes County Board of Commissioners, North Carolina |
| Project Flex Data Center Campus (Lyon Township, Ambassador Parkway West and Milford Road) | United States | Announced | | 1 | Point | Charter Township of Lyon, Oakland County, Michigan (archived by the Internet Archive) |
| Project Loch Data Center Site (Watkins Centre, 750 Watkins Centre Parkway, Chesterfield County) | United States | Announced | | 1 | Point | Chesterfield County, Virginia (Board of Supervisors meeting records on the county CivicClerk portal) |
| Project Longhorn Data Center Campus (Cedar Creek) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| Project Sail (Prologis data center campus, Coweta County) | United States | Announced | | 1 | Point | Propmodo |
| Project Skye Data Center Site (Upper Magnolia Green, 4201 Moseley Road, Chesterfield County) | United States | Announced | | 1 | Point | Chesterfield County, Virginia (Board of Supervisors meeting records on the county CivicClerk portal) |
| Project Thunderbird West Campus (Enid, Oklahoma) | United States | Announced | | 1 | Point | City of Enid, Oklahoma (application filed by Plainsmen Holdings, LLC) |
| Prologis Trenton Project Mila Campus | United States | Under construction | | 1 | Point | Trenton Data Center Campus LLC; hosted by Supreme Court of Ohio |
| Prometheus Hyperscale Evanston campus | United States | Announced | | 1 | Point | TownLift |
| PW Digital Gateway | United States | Cancelled | | 1 | Point | Bisnow |
| QTS and Lancium Hall County data center campus | United States | Site preparation | | 1 | Point | Lancium Inc. |
| QTS Ashburn 1 Data Center Campus (Broderick Drive and Randolph Drive, Sterling) | United States | Under construction | | 1 | Point | QTS Realty Trust, LLC (QTS Data Centers) |
| QTS Aurora DEN1 Data Center Campus | United States | Under construction | | 1 | Point | City of Aurora, Colorado |
| QTS Bessemer Data Center Campus (Project Marvel) | United States | Site preparation | | 1 | Point | QTS Realty Trust, LLC (QTS Data Centers) |
| QTS Cedar Rapids Data Center Campus | United States | Under construction | | 1 | Point | QTS Data Centers |
| QTS Eagle Mountain SLC1 Data Center Campus | United States | Under construction | | 1 | Point | QTS Data Centers |
| QTS Fayetteville campus | United States | Partially operational | | 1 | Point | The Citizen (Fayette County) |
| QTS Irving Data Center Campus (Irving 1, DFW1) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| QTS South Dallas Campus (DFW2, Wilmer/Lancaster) | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| QTS Suwanee Data Center Campus (120 and 300 Satellite Boulevard) | United States | Operational | | 1 | Point | QTS Realty Trust, LLC |
| QTS York County Data Center Campus | United States | Shell | | 1 | Point | Gilbane Building Company |
| Quantum Frederick data center park | United States | Under construction | | 1 | Point | Baxtel |
| Related Digital Cheyenne Campus | United States | Under construction | | 1 | Point | Related Digital |
| Riot Platforms Corsicana facility | United States | Partially operational | | 1 | Point | Riot Platforms, Inc. via SEC EDGAR |
| Riot Rockdale Campus | United States | Partially operational Under construction | | 2 | Point | Riot Platforms, Inc.; Riot Platforms, Inc. via SEC EDGAR |
| Rowan Cinco Data Center Campus (Rowan Cinco Subdivision, CR 683, between Lytle and Natalia, Medina County) | United States | Under construction | | 1 | Point | Rowan Digital Infrastructure LLC (Internet Archive copy) |
| Rowan Project Pirate Data Center Campus (CR 683, Lytle, Medina County) | United States | Announced | | 1 | Point | Rowan Digital Infrastructure LLC (Rowan in Medina County project site) |
| Rowan Project Temple | United States | Under construction | | 1 | Point | Rowan Digital Infrastructure |
| Sabey Indianapolis Decatur Township Data Center Campus | United States | Announced | | 1 | Point | Sabey Data Centers |
| Sabey SDC Austin Round Rock Campus | United States | Shell | | 1 | Point | Sabey Data Centers |
| Sabey SDC Umatilla Data Center Campus | United States | Under construction | | 1 | Point | Sabey Data Centers |
| Servpac MTP Data Center (200 Kahelu Ave, Mililani Technology Park, Oahu) | United States | Operational | | 1 | Point | Servpac Inc. |
| Shenandoah Computing Data Center Site (MO-92 and N Winan Avenue, Kansas City, Missouri) | United States | Announced | | 1 | Point | Missouri Department of Natural Resources, Air Pollution Control Program |
| Site Layer 1 Data Center Project (near Playas, Grant County, New Mexico) | United States | Announced | | 1 | Point | Site Layer 1, LLC (applicant), prepared by SWCA Environmental Consultants; published by the New Mexico Environment Department |
| Skybox Hutto Data Center Campus | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| Soluna Project Kati Campus (Willacy County) | United States | Announced Operational | | 2 | Point | Soluna Holdings; Texas Department of Licensing and Regulation |
| STACK Bossier Highway 3 Technology Park Campus | United States | Under construction | | 1 | Point | STACK Infrastructure |
| STACK DFW02 Lancaster Campus | United States | Announced | | 1 | Point | Texas Department of Licensing and Regulation |
| STACK Infrastructure Berry Hill campus, Pittsylvania County | United States | Announced | | 1 | Point | WSET |
| STACK New Albany Campus (7300 and 7340 Souder Road) | United States | Announced | | 1 | Point | City of New Albany, Ohio |
| STACK POR03 Hillsboro Campus (4735 NE Starr Blvd) | United States | Operational | | 1 | Point | STACK Infrastructure |
| STACK Stafford Technology Campus (Eskimo Hill Road and Richmond Highway, Stafford County) | United States | Announced | | 1 | Point | Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal) |
| Stargate Milam County (SB Energy campus) | United States | Under construction | | 1 | Point | SB Energy (Energy Global, LP), Milam Data Center site (Internet Archive copy) |
| Statesboro Burkhalter Road Data Center Site | United States | Announced | | 1 | Point | City of Statesboro, Georgia |
| Sterling Technology Park Data Center Site (22400 Shaw Road, Sterling, Loudoun County) | United States | Announced | | 1 | Point | Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information) |
| Switch Las Vegas NV LAS NAP 17 & 18 Data Center Site (6240 W Maule Ave) | United States | Under construction | | 2 | Point | Clark County, Nevada (Department of Building and Fire Prevention GIS) |
| Switch The Keep 2 Campus (Bates Road, Cartersville) | United States | Under construction | | 1 | Point | Bartow County, Georgia, Office of the County Administrator |
| TADG ATL02 Ellenwood Data Center Site (4350 E Tanners Church Rd, Clayton County) | United States | Announced | | 1 | Point | Georgia Environmental Protection Division, Air Protection Branch |
| Taylor Technology Campus (Big Watt Digital and PowerHouse) | United States | Proposed | | 1 | Point | KUT News |
| TeraWulf Chesapeake Data Campus (Morgantown) | United States | Proposed | | 1 | Point | TeraWulf |
| TeraWulf Justified Data campus (Hawesville) | United States | Announced | | 1 | Point | TeraWulf |
| TeraWulf Lake Hawkeye data campus | United States | Announced | | 1 | Point | TeraWulf |
| TeraWulf Lake Mariner Data Campus | United States | Partially operational Under construction | | 2 | Point | TeraWulf; TeraWulf Inc. |
| TeraWulf Muskie Data Campus | United States | Announced | | 1 | Point | TeraWulf |
| Texas Critical Data Centers (TCDC) campus, Ector County (Odessa) | United States | Announced | | 1 | Point | New Era Energy & Digital, Inc. |
| The Barn Stargate Data Center Campus | United States | Under construction | | 1 | Polygon | Oracle |
| Thistle Landing Data Center (4801 E Thistle Landing Dr, Phoenix, Arizona) | United States | Announced | | 1 | Point | City of Phoenix, Arizona (Planning and Development Department) |
| TierPoint Bethlehem (BET) Data Center (3864 Courtney Street, Suite 130, Hanover Township, Northampton County, Pennsylvania) | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Charlotte - Center Park (CL4) Data Center, 1805 Center Park Drive, Charlotte | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Charlotte - North Myers (CL2) Data Center, 125 North Myers Street, Charlotte | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Chicago - Polk St. Data Center, 601 W Polk St | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Lehigh Valley (LVQ) Data Center (3949 Schelden Circle, Hanover Township, Northampton County, Pennsylvania) | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Little Rock (LIT) Data Center, 15707 Chenal Parkway | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Milwaukee (MKE) Data Center, 3701 W. Burnham Street | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Nashville (NSH) Data Center, 311 Eddy Lane, Franklin | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Oklahoma City (OK2) Data Center, 4114 Perimeter Center Place, Oklahoma City | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Oklahoma City (OKC) Data Center, 4121 Perimeter Center Place, Oklahoma City | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Omaha - Bellevue (BEL) Data Center, 1001 North Fort Crook Road, Bellevue | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Omaha - Midlands (MID) Data Center, 11425 South 84th Street, Papillion | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Philadelphia (PHI) Data Center (4775 League Island Boulevard, Philadelphia Navy Yard, Pennsylvania) | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Raleigh (RAL) Data Center, 5301 Departure Drive, Raleigh | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Raleigh - RTP Data Center, 99 TW Alexander Drive, Durham | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Sioux Falls - East (SFE) Data Center, 700 East 54th Street North | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint St. Louis - Locust (SLL) Data Center, 2300 Locust Street, St. Louis | United States | Announced | | 1 | Point | TierPoint, LLC |
| TierPoint St. Louis - Millpark (SLM) Data Center, 2315 Millpark Drive, Maryland Heights | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint St. Louis - Olive (SLO) Data Center, 1111 Olive Street | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint TekPark Data Center Campus (9999 Hamilton Blvd, Breinigsville, Upper Macungie Township, Pennsylvania) | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Tulsa - Archer (TUL) Data Center, 322 E. Archer Street | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Tulsa - State Farm (TL2) Data Center, 12151 E. State Farm Boulevard | United States | Operational | | 1 | Point | TierPoint, LLC |
| TierPoint Valley Forge Data Center (1000 Adams Avenue, Lower Providence Township, Pennsylvania) | United States | Operational | | 1 | Point | TierPoint, LLC |
| Tract Buckeye data center park | United States | Announced | | 1 | Point | Construction Review Online |
| TRG Spring Cypress Campus | United States | Under construction | | 1 | Point | TRG Datacenters |
| Vantage Data Centers Stacks Road Site (4380 Stacks Rd, City of South Fulton) | United States | Clearing | | 1 | Point | City of South Fulton, Georgia (GIS, ArcGIS Online organisation cosfga) |
| Vantage Frontier campus (Stargate Shackelford County) | United States | Under construction | | 1 | Point | Oracle |
| Vantage Lighthouse Port Washington Data Center Campus | United States | Under construction | | 1 | Point | Vantage Data Centers (Vantage Lighthouse Campus website) |
| WhiteFiber NC-1 AI Data Center Campus (Madison, North Carolina) | United States | Commissioning | | 1 | Point | WhiteFiber, Inc. |
| xAI Colossus 1 (Memphis) | United States | Operational | | 1 | Point | Anthropic |
| xAI Colossus 2 (Memphis) | United States | Partially operational | | 1 | Point | Epoch AI |
| xAI MACROHARDRR data center (Southaven) | United States | Operational | | 1 | Point | WMC Action News 5 |
| Yondr Bristow Campus | United States | Completed | | 1 | Point | Prince William County, Virginia (Planning Office and Department of Development Services GIS) |
| Yondr Hornbaker Road Campus (Manassas) | United States | Announced | | 1 | Point | Yondr Group |
| Yondr Project Allegro Data Center Campus (Aldie, Loudoun County) | United States | Permitted | | 1 | Point | Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information) |