Lancium Clean Campus Abilene AI Data Center

Partially operational Under construction

United States · 2 projects · Last reported

Summary

Lancium Clean Campus Abilene Remaining Six-Building Expansion

Oracle publishes aerial photographs of Abilene data halls and the turbine plant, captioned 15 July 2026. Oracle says 75% of the campus's total capacity had been delivered as of September 2026, with the remainder delivering in later quarters. The expansion is kept at the general construction stage; the percentage is campus-level, month-precision context and does not establish completion or operation of any of the six expansion buildings. evidence

Oracle · publication date not stated

Stargate Abilene (Crusoe campus on Lancium land)

Crusoe-developed eight-building AI campus in Abilene, Texas, planned at about 1.2 GW and leased to Oracle, which runs it for OpenAI as the flagship Stargate site. Construction began in mid-2024; the first buildings came online in September 2025 and the last building was topped out in November 2025. The build is funded through a Crusoe, Blue Owl and Primary Digital joint venture on Lancium-owned land. A potential 600 MW expansion nearby was floated in 2025, but reports in March 2026 said it had been dropped, which Oracle disputed. In late September 2026 trade press reported six buildings delivered to OpenAI, and analyst Epoch AI projected all eight running by November 2026.

Source record as of 2026-10-05 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.50955, -99.77479 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Lancium Clean Campus Abilene Remaining Six-Building Expansion

Under construction last observed as of · Authoritative status update

The city's Q2 2025 significant-project table identifies new Lancium Buildings 5, 6, 7, and 8 at 617 FM 2404 with a reported $4 billion valuation. evidence

City of Abilene Planning and Development Services · publication date not stated

Source and location review
Status source
Oracle AI data-center locations page: dated construction media captions (captured 16 October 2026) evidence row
Oracle · publication date not stated · Company disclosure
Locator
Campus locator · Official source · official_census_address_locator_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 104 days before the data update on 2026-10-27

Stargate Abilene (Crusoe campus on Lancium land)

Partially operational last observed as of · Reported status

Location: Abilene, Texas, US. Abilene city centroid from an OpenStreetMap Nominatim lookup. Cited sources name the city but give no street address or parcel, so the campus itself is not pinpointed. Crusoe; W.Media; Epoch AI

Use: Ai training, Ai inference

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 1,200 MWPlanned · Campus · Unspecified2025-05-21Full eight-building campus. Sources do not say whether this is IT or facility power.Crusoe; W.Media
Power capacitymore than 200 MWOperational · Phase · It load · Phase 1 (buildings 1-2)2025-11-18The first two buildings, reported operational since September 2025, provide more than 200 MW of IT capacity.W.Media
Power capacityabout 421 MWOperational · Campus · It load2026-07-28Analyst estimate, not a company disclosure: Epoch AI's estimate of operating IT power with four buildings running, built from satellite imagery, filings and cooling models. Epoch projects about 843 MW of IT power by Q4 2026.Epoch AI
Power capacityabout 360 MWPermitted · Campus · Onsite generation2026-04Analyst report, not a company disclosure: Cleanview gives this initial combined gas turbine capacity from permit documents and estimates from satellite imagery that the plant was finished in January 2026.Cleanview
Power capacity600 MWPlanned · Phase · Unspecified · Potential expansion near Abilene (reported dropped in 2026)2025-09-24Announced in September 2025 as a potential expansion near the flagship site. In March 2026 Industrial Info relayed a Bloomberg report that the expansion was off; OpenAI said it put the capacity elsewhere and Oracle called the reports false.SoftBank Group Corp.
Investmentabout 15,000,000,000 USDAnnounced · Campus2025-05-21Size of the Crusoe, Blue Owl and Primary Digital joint venture funding the campus.Crusoe
Buildings8 countPlanned · Campus2025-05-21Crusoe; W.Media
Floor areaabout 980,000 sq_ftOperational · Phase · Phase 1 (buildings 1-2)2025-11-18W.Media
Floor areaabout 4,000,000 sq_ftPlanned · Campus2025-11-18W.Media
Jobs constructionabout 7,000 countReported · Campus2025-11-18Workers Crusoe said come to Abilene every day to build the campus, cited at the final topping out. In May 2025 the joint venture reported about 3,000 daily workers, expected to approach 5,000.Crusoe; W.Media

Companies and organizations

NameRoleNotesSources
CrusoeDeveloperCrusoe develops, builds and operates the campus and leases it to Oracle for OpenAI.Crusoe; W.Media; Crusoe
Blue Owl CapitalInvestorCo-sponsor of the $15 billion joint venture, investing through funds managed by its Real Assets platform.Crusoe
Primary Digital InfrastructureInvestorCo-sponsor of the joint venture funding construction.Crusoe
LanciumOwnerCrusoe describes the Abilene campus land as Lancium-owned.Crusoe
OracleTenantLeases the buildings and runs Oracle Cloud Infrastructure capacity there for OpenAI. Analyst Epoch AI, not a company disclosure, lists Oracle as owner of the AI chips.SoftBank Group Corp.; W.Media; Epoch AI
OpenAITenantEnd user of the compute, served through Oracle Cloud Infrastructure.SoftBank Group Corp.; W.Media; Epoch AI

Timeline

DateEventActual or plannedNotesSources
2024-06Construction startedActualCrusoe dates the start of phase 1 to June 2024; one trade article gives July 2024.Crusoe; W.Media; Crusoe
2025-03OtherActualConstruction of phase 2 (six more buildings) began.Crusoe
2025-09First operationalActualCrusoe announced the first phase live in September 2025. Analyst Epoch AI judges only building 1 fully operational then and building 2 by December 2025.W.Media; Cleanview; Epoch AI
2025-09-23Expansion announcedActualA potential 600 MW expansion near Abilene was announced alongside five new Stargate sites.SoftBank Group Corp.
2025-11OtherActualEighth and final building topped out.W.Media
2026-03OtherActualBloomberg reported, as relayed by Industrial Info, that plans to expand the campus were dropped; Oracle called the reports false. Analyst Epoch AI also describes OpenAI as having reversed a plan to expand the site.Industrial Info Resources; Epoch AI
2026Fully operationalPlannedCrusoe targeted energizing phase 2 by mid-2026. Analyst Epoch AI, not a company source, projects buildings 5 to 8 operational around November 2026.Crusoe; Epoch AI

Power supply

TypeDescriptionSources
GridConnected to the ERCOT grid, per analyst Cleanview. Analyst Epoch AI reports a 200 MW substation serving the first buildings and a larger 1 GW substation that looked complete in July 2026 imagery.Cleanview; Epoch AI
Natural gas onsiteOn-site gas turbines, including GE Vernova LM2500XPRESS and Solar Titan 350 units, per permit records summarized by analyst Cleanview; analyst Epoch AI saw the on-site plant looking complete by March 2026.Cleanview; Epoch AI
WindCrusoe cited the region's low-cost wind power as a major factor in choosing the site; analyst Epoch AI notes the grid supply includes local wind.Crusoe; Epoch AI

Estimates of how much of the campus is live differ: an Oracle post in April 2026 said 200 MW was operating, analyst Epoch AI estimated about 0.3 GW of facility power then and about 421 MW of IT load by mid-2026, and The Tech Capital reported six buildings delivered to OpenAI in late September 2026. Epoch figures are analyst estimates, not company disclosures. Crusoe is separately building a 900 MW data center on adjacent Lancium-owned land, which Epoch links to Microsoft; it is a different project.

Related projects: crusoe abilene microsoft

Sources for these details
Companies
  • Developer: Crusoe (unknown scope) evidence
  • Developer: Crusoe (unknown scope) evidence
  • Developer: Crusoe (unknown scope) evidence
  • Investor: Blue Owl Capital (unknown scope) evidence
  • Investor: Primary Digital Infrastructure (unknown scope) evidence
  • Owner: Lancium (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: OpenAI (unknown scope) evidence
  • Tenant: OpenAI (unknown scope) evidence
  • Tenant: OpenAI (unknown scope) evidence
Source and location review
Status source
OpenAI Stargate Abilene (AI data center directory) evidence row
Epoch AI · published 2026-10-05 · Analyst report
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 22 days before the data update on 2026-10-27

Location details
Coordinates
32.50955, -99.77479
Geometry licence
public-domain-us-government
Use scope
Campus locator
Scope class
official_census_address_locator_point
Authority
Official source
Source entity
Campus
Method
census_public_ar_current_street_range_interpolation
Derivation
official_address_geocode
Precision scope
Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position. The municipal address binds Buildings 5 through 8 and the remaining campus development; the point is not any one of the six remaining building locations.
Horizontal uncertainty
Not reported

The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.

Geometry evidence
6600dddb

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Lancium Clean Campus Abilene AI Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
AI Data Centers: Investing in Communities, Powering the Future
Archived copy
Oracle
Company disclosure
Physical statusnot statedall-rights-reservedOracle3222773fcc16f4415692dd48c2254c15b00ea3bd5c5e4a1d4988a7a977b05e91
Retained source material; see source provenance
An Abilene update: What's happening at the first Stargate data centre?
Archived copy
The Tech Capital
Trade publication
Imported: Record, Imported: Statussource-terms-not-recordedThe Tech Capital1b56faedf5d16cd981d6fb4dc08bfeef08888929c6d9f7620965b1929312a3f8
Factual source record; not the publisher page
Behind-the-meter data centers: Stargate Abilene
Archived copy
Cleanview
Analyst report
Imported: Record, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Power Source: Natural Gas Onsitenot statedsource-terms-not-recordedCleanview585c88e69c5cf0ec241bc3d5a4c0fc495030687d5f95c88f4d710dafad889020
Factual source record; not the publisher page
City of Abilene Planning and Development Services 2025 Second Quarter Report
Archived copy
City of Abilene Planning and Development Services
Government record
Campus address contextnot statedpublic-government-recordCity of Abilene Planning and Development Services181c419ff99ec07a93801da2fc43f0174040dd770ac2c02ba9f933a64db50bff
Retained source material; see source provenance
Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas
Archived copy
Crusoe
Company disclosure
Imported: Record, Milestone: Construction Started, Role: Developer, Owner claimsource-terms-not-recordedCrusoefa8c1eb521b71850ddf6cbd3120a42b8fac5eb4e4a5412d740d54e09224f3e73
Factual source record; not the publisher page
Crusoe tops off final AI data center in Abilene, Texas
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Role: Developer, Tenant claimsource-terms-not-recordedW.Media7f6d941eee79b6a7ddd1cb6e4488448b9495a42b9f65f4741a507fb4670a5007
Factual source record; not the publisher page
Crusoe, Blue Owl Capital and Primary Digital Infrastructure Enter Second Phase of $15 Billion Joint Venture
Archived copy
Crusoe
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Metric: Jobs Construction, Metric: Power Capacity, Milestone: Construction Started, Milestone: Fully Operational, Milestone: Other, Power Source: Wind, Role: Developer, Role: Investorsource-terms-not-recordedCrusoe8c251fe134b7418f25079e2217cb13a273f19d5a6f1966cdcc22352a2a0e483b
Factual source record; not the publisher page
Flagship Stargate Data Center Campus Expansion in Texas is Questioned
Archived copy
Industrial Info Resources
Trade publication
Imported: Record, Milestone: Othersource-terms-not-recordedIndustrial Info Resourcesa008f9e7e31e2ab242d689d216c9e7fbb7f4d3df45b038cc87ee4f9abe7d8e4b
Factual source record; not the publisher page
OpenAI Stargate Abilene (AI data center directory)
Archived copy
Epoch AI
Analyst report
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Fully Operational, Power Source: Grid, Power Source: Natural Gas Onsite, Tenant claimsource-terms-not-recordedEpoch AI6387ccc6c6ce321a0975c73503fb0fb920c74824019d6419e48905afb7a030c4
Factual source record; not the publisher page
OpenAI Stargate: where the US sites stand
Archived copy
Epoch AI
Analyst report
Imported: Record, Milestone: Other, Power Source: Windsource-terms-not-recordedEpoch AI1d7f94716c08389e4419997f927952fbdf1a3fecb3b0d5b39c4c01ca2fdda8bc
Factual source record; not the publisher page
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites
Archived copy
SoftBank Group Corp.
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Expansion Announced, Tenant claimsource-terms-not-recordedSoftBank Group Corp.1db81e59661bc05d9f79c62a41966f02f34a6101a6d3b1187c332d51f04b3646
Factual source record; not the publisher page
Oracle AI data-center locations page: dated construction media captions (captured 16 October 2026)
Archived copy
Oracle
Company disclosure
Physical statusnot statedall-rights-reservedOracle35da74fdde71efad4d88d252b0d91ffd7fb4f72e89dc3699afdbae1cec5e6eb7
Retained source material; see source provenance
United States Census Geocoder Public_AR_Current exact-address matches for the v0.12 locator batch
Archived copy
United States Census Bureau
Government record
Geometrynot statedpublic-domain-us-governmentUnited States Census Bureaudb625d4738dc9a0eed46bd54216090509b1882f16c8b57578f43ac0fa76b0905
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Lancium Clean Campus Abilene AI Data Center [site vcc-site-85b3549bb55293336132]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction