Abernathy HPC campus (TeraWulf and Fluidstack joint venture)
Under construction
United States · 1 project · Last reported
Summary
AI data center campus in Abernathy, Texas, developed by a joint venture of TeraWulf and Fluidstack announced in October 2025. It is designed for 168 MW of critical IT load (up to 240 MW gross) and is fully pre-leased to a Fluidstack entity for up to 25 years, with Google backstopping about $1.3 billion of the lease obligations; the end user is described only as a global hyperscale AI platform. Project financing was priced in December 2025 and commissioning was targeted for the second half of 2026. In July 2026 TeraWulf agreed to sell its 50.1% stake to a Fluidstack-led investor group, with Fluidstack to keep leading the project.
Source record as of 2026-02-27 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 33.83220, -101.84310 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Abernathy HPC campus (TeraWulf and Fluidstack joint venture)
Under construction last observed as of · Reported status
Location: Abernathy, Texas, US. Town coordinates from Wikipedia; the sources name Abernathy but give no address. The town spans Hale and Lubbock counties, so no county is recorded. TeraWulf; U.S. Securities and Exchange Commission (TeraWulf filing); Wikipedia
Use: Ai unspecified, Hpc
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 168 MW | Contracted · Campus · It load | 2025-10-28 | TeraWulf; TeraWulf; U.S. Securities and Exchange Commission (TeraWulf filing) | |
| Power capacity | up to 240 MW | Planned · Campus · Facility | 2025-12-18 | Gross power capacity. | TeraWulf; TeraWulf |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| TeraWulf | Developer | TeraWulf; U.S. Securities and Exchange Commission (TeraWulf filing) | |
| Fluidstack | Developer | Joint venture partner; expected to continue leading the project after its investor group buys TeraWulf's stake. | TeraWulf; TeraWulf |
| TeraWulf | Owner | Holds a 50.1% interest per the 10-K and July 2026 release (the October 2025 announcement said 51%); agreed in July 2026 to sell it to a Fluidstack-led investor group for about $530 million, with closing not reported by August 2026. | TeraWulf; U.S. Securities and Exchange Commission (TeraWulf filing); TeraWulf; TeraWulf |
| Fluidstack | Owner | Fluidstack CS I holds the other joint venture interest. | U.S. Securities and Exchange Commission (TeraWulf filing); TeraWulf |
| Fluidstack | Tenant | Fluidstack USA III pre-leased the full 168 MW under a 25-year lease that can be shortened to 20 or 15 years; Google backstops about $1.3 billion of the lease obligations. | TeraWulf; U.S. Securities and Exchange Commission (TeraWulf filing) |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-10-28 | Announced | Actual | TeraWulf | |
| 2025-12-18 | Other | Actual | Project-level construction financing priced. | TeraWulf |
| 2026-H2 | First operational | Planned | Targeted commissioning and delivery. | TeraWulf; U.S. Securities and Exchange Commission (TeraWulf filing) |
| 2026-07-06 | Other | Actual | TeraWulf agreed to sell its entire 50.1% interest to a Fluidstack-led investor group; the August 2026 results still described it as an agreement. | TeraWulf; TeraWulf |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Campus is located within the Southwest Power Pool market. | U.S. Securities and Exchange Commission (TeraWulf filing) |
Sources for these details
- TeraWulf Expands Strategic Partnership with Fluidstack Through New 168 MW AI Compute Joint Venture — TeraWulf; 2025-10-28
- TeraWulf and Fluidstack Announce Successful Pricing of Project Financing for 168 MW HPC Compute Joint Venture — TeraWulf; 2025-12-18
- TeraWulf Inc. Form 10-K for the fiscal year ended December 31, 2025 — U.S. Securities and Exchange Commission (TeraWulf filing); 2026-02-27 · Archived source
- TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack — TeraWulf; 2026-07-06
- TeraWulf Reports Second Quarter 2026 Results — TeraWulf; 2026-08-05
- Abernathy, Texas — Wikipedia; publication date not stated
- Companies
- Developer: TeraWulf (unknown scope) evidence
- Developer: TeraWulf (unknown scope) evidence
- Developer: Fluidstack (unknown scope) evidence
- Developer: Fluidstack (unknown scope) evidence
- Owner: TeraWulf (unknown scope) evidence
- Owner: TeraWulf (unknown scope) evidence
- Owner: TeraWulf (unknown scope) evidence
- Owner: TeraWulf (unknown scope) evidence
- Owner: Fluidstack (unknown scope) evidence
- Owner: Fluidstack (unknown scope) evidence
- Tenant: Fluidstack (unknown scope) evidence
- Tenant: Fluidstack (unknown scope) evidence
Source and location review
- Status source
- TeraWulf and Fluidstack Announce Successful Pricing of Project Financing for 168 MW HPC Compute Joint Venture evidence row
TeraWulf · published 2025-12-18 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 242 days before the data update on 2026-10-27
Location details
- Coordinates
- 33.83220, -101.84310
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Town coordinates from Wikipedia; the sources name Abernathy but give no address. The town spans Hale and Lubbock counties, so no county is recorded.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 9160242e
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Abernathy, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 610d2942d8598286bab8dbfbcbada9479edce5d805ab8faae0739ef6d0129c24Factual source record; not the publisher page | |
| TeraWulf and Fluidstack Announce Successful Pricing of Project Financing for 168 MW HPC Compute Joint Venture Archived copy | TeraWulf Company disclosure | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other | source-terms-not-recorded | TeraWulf | d12e5f36682ff1cbf755d6670f6c5562223c18cdcaca17d3872e0f9e5138e91dFactual source record; not the publisher page | ||
| TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack Archived copy | TeraWulf Company disclosure | Imported: Record, Milestone: Other, Role: Developer, Owner claim | source-terms-not-recorded | TeraWulf | 33ab4eff5577a50d4b8b3c03f34e3cc28178abfae0eeab840b7d1aa53ec08089Factual source record; not the publisher page | ||
| TeraWulf Expands Strategic Partnership with Fluidstack Through New 168 MW AI Compute Joint Venture Archived copy | TeraWulf Company disclosure | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Role: Developer, Owner claim, Tenant claim | source-terms-not-recorded | TeraWulf | 8ccac3e9c7a630354629068b95d463625fd9fe60d4cf5d67e37dc21e931bac8aFactual source record; not the publisher page | ||
| TeraWulf Inc. Form 10-K for the fiscal year ended December 31, 2025 Archived copy | U.S. Securities and Exchange Commission (TeraWulf filing) Regulatory filing | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Developer, Owner claim, Tenant claim | source-terms-not-recorded | U.S. Securities and Exchange Commission (TeraWulf filing) | d3e84b1907c41fae5cd053f8ba06ce4f9642a3ecc7f97f30f40568646b3ab8c9Factual source record; not the publisher page | ||
| TeraWulf Reports Second Quarter 2026 Results Archived copy | TeraWulf Company disclosure | Imported: Record, Milestone: Other, Owner claim | source-terms-not-recorded | TeraWulf | e878a42e13bb01062d0272f10dbbc05535e82a8fccdf9e7598afe5d93bb30521Factual source record; not the publisher page |
Cite this site