Aligned Project Phoenix, Shippingport
Announced
United States · 1 project · Last reported
Summary
Operator announces the named three-facility campus and September 10 groundbreaking. Retain announced as the latest exact-day supported lifecycle classification: undated site-operations and planned-blasting text has no exact achieved work observation, and the October 8 legal commencement filing is not such an observation. evidence
Aligned Data Centers · published 2026-09-10
Location
The interactive map needs JavaScript. Display anchor: 40.63207, -80.41455 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Aligned Project Phoenix / PIT-01 Campus Development
Announced last observed as of · Project announcement
Operator names its Shippingport campus PIT-01 at 100 Church Lane, Shippingport, PA 15001. Undated service specifications do not establish operation. evidence
Aligned Data Centers · publication date not stated
Property website identifies Shippingport Industrial Park and directly embeds My Maps document 186x-3dU4x2AdQmqnlojErXVzwPcSooE. Aligned explicitly names this park as the host of Project Phoenix. This is a named-parent-property bridge, not an exact address match or an Aligned building plan. evidence
Shippingport Industrial Park / Frontier Group of Companies · publication date not stated
October 8 Notice of Commencement entry identifies Project Phoenix, Aligned as property owner, Kokosing Industrial as contractor, Steel Curtain Drive address, 20 parcel references, and reported building-permit identifiers. The directory filing date is not an observation of physical works or a recovered permit-grant date. evidence
Pennsylvania Department of General Services; filing by Aligned Data Centers LLC · published 2026-10-08
Undated page describes adjusting site operations and rescheduling blasting to Monday September 28, with planned dates through October 16. This supports construction preparation context but does not prove any scheduled blast occurred or supply an exact observation date for physical works. evidence
Aligned Data Centers · publication date not stated
One-page undated traffic plan marks an 800-foot radius at Gate 17 and future rolling roadblocks. Visually inspected. It is a safety/traffic illustration for planned activity, not a survey or evidence that blasting occurred. evidence
Aligned Data Centers; Google Earth basemap · publication date not stated
- Companies
Source and location review
- Status source
- Aligned announces Project Phoenix at Shippingport evidence row
Aligned Data Centers · published 2026-09-10 · Company disclosure - Locator
- Campus locator · Compiled location reference · property_selected_parent_industrial_property_entrance_marker evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 47 days before the data update on 2026-10-27
Location details
- Coordinates
- 40.63207, -80.41455
- Geometry licence
- source-specific-terms
- Use scope
- Campus locator
- Scope class
- property_selected_parent_industrial_property_entrance_marker
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- direct_unique_named_point_from_property_embedded_google_mymaps_kml
- Derivation
- direct_geometry
- Precision scope
- Main entrance marker for the parent Shippingport Industrial Park property. It does not locate an individual Aligned building, the three-facility campus centroid, construction work limits or a legal parcel boundary.
- Horizontal uncertainty
Not reported
Source gives no measured positional accuracy. Offset from the parent entrance to individual proposed DC buildings is unknown; decimal precision is not survey accuracy.
- Geometry evidence
- 005e120e
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Aligned announces Project Phoenix at Shippingport Archived copy | Aligned Data Centers Company disclosure | Project announcement, Operator claim | all-rights-reserved | Aligned Data Centers | 260e397df39b70ff8ec0f1cea845f7ccaa5e07f19ceb0c3c64a7969e9ef7866fRetained source material; see source provenance | ||
| Aligned Pennsylvania campus and PIT-01 address Archived copy | Aligned Data Centers Company disclosure | Site and project identity | not stated | all-rights-reserved | Aligned Data Centers | 94526a8d62b7ab75a3acd336d7636f355f72580e659ada1e602546e99cb7762aRetained source material; see source provenance | |
| Aligned Shippingport community construction schedule Archived copy | Aligned Data Centers Company disclosure | Site and project identity | not stated | all-rights-reserved | Aligned Data Centers | 5ea897b8136af44d4ec9bfde98926c9533e9bda24a425404d5fa5fc467e788feRetained source material; see source provenance | |
| Pennsylvania construction directory Project Phoenix SCCM00016473 Archived copy | Pennsylvania Department of General Services; filing by Aligned Data Centers LLC Government record | Site and project identity, Owner claim | source-specific-terms | Pennsylvania Department of General Services; filing by Aligned Data Centers LLC | e773cff22d68008e968e6c36d32c1c60d2b27a8e706e0ecc9a3b5bc16a2b4fceRetained source material; see source provenance | ||
| Project Phoenix Gate 17 planned blasting traffic map Archived copy | Aligned Data Centers; Google Earth basemap Company disclosure | Site and project identity | not stated | all-rights-reserved | Aligned Data Centers; Google Earth basemap | 539dd5708348be203e06f65a07988dc5fab190aab647cc8d187756768060f40fRetained source material; see source provenance | |
| Property-selected Shippingport Industrial Park map: Main Site Entrance Archived copy | Shippingport Industrial Park / Frontier Group of Companies via Google My Maps Map feature | Geometry | not stated | source-specific-terms | Shippingport Industrial Park / Frontier Group of Companies via Google My Maps | 82bdec50c85e6ec755eb8e5b02414a8ec025148f0b7270a8f0ccd71a13c92560Retained source material; see source provenance | |
| Shippingport Industrial Park site-map page Archived copy | Shippingport Industrial Park / Frontier Group of Companies Company disclosure | Site and project identity | not stated | source-specific-terms | Shippingport Industrial Park / Frontier Group of Companies | c6000ace79eab38195cdb959371dfa317767a014703549fb1dde79435e5a8cd9Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). Aligned Project Phoenix, Shippingport [site vcc-site-b336a1eb615ea1635dc7]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b336a1eb615ea1635dc7/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction