Aligned Project Phoenix, Shippingport

Announced

United States · 1 project · Last reported

Summary

Operator announces the named three-facility campus and September 10 groundbreaking. Retain announced as the latest exact-day supported lifecycle classification: undated site-operations and planned-blasting text has no exact achieved work observation, and the October 8 legal commencement filing is not such an observation. evidence

Aligned Data Centers · published 2026-09-10

Location

The interactive map needs JavaScript. Display anchor: 40.63207, -80.41455 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Aligned Project Phoenix / PIT-01 Campus Development

Announced last observed as of · Project announcement

Operator names its Shippingport campus PIT-01 at 100 Church Lane, Shippingport, PA 15001. Undated service specifications do not establish operation. evidence

Aligned Data Centers · publication date not stated

Property website identifies Shippingport Industrial Park and directly embeds My Maps document 186x-3dU4x2AdQmqnlojErXVzwPcSooE. Aligned explicitly names this park as the host of Project Phoenix. This is a named-parent-property bridge, not an exact address match or an Aligned building plan. evidence

Shippingport Industrial Park / Frontier Group of Companies · publication date not stated

October 8 Notice of Commencement entry identifies Project Phoenix, Aligned as property owner, Kokosing Industrial as contractor, Steel Curtain Drive address, 20 parcel references, and reported building-permit identifiers. The directory filing date is not an observation of physical works or a recovered permit-grant date. evidence

Pennsylvania Department of General Services; filing by Aligned Data Centers LLC · published 2026-10-08

Undated page describes adjusting site operations and rescheduling blasting to Monday September 28, with planned dates through October 16. This supports construction preparation context but does not prove any scheduled blast occurred or supply an exact observation date for physical works. evidence

Aligned Data Centers · publication date not stated

One-page undated traffic plan marks an 800-foot radius at Gate 17 and future rolling roadblocks. Visually inspected. It is a safety/traffic illustration for planned activity, not a survey or evidence that blasting occurred. evidence

Aligned Data Centers; Google Earth basemap · publication date not stated

Companies
  • Owner: Aligned Data Centers, LLC (current) evidence
  • Operator: Aligned Data Centers (intended) evidence
Source and location review
Status source
Aligned announces Project Phoenix at Shippingport evidence row
Aligned Data Centers · published 2026-09-10 · Company disclosure
Locator
Campus locator · Compiled location reference · property_selected_parent_industrial_property_entrance_marker evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 47 days before the data update on 2026-10-27

Location details
Coordinates
40.63207, -80.41455
Geometry licence
source-specific-terms
Use scope
Campus locator
Scope class
property_selected_parent_industrial_property_entrance_marker
Authority
Compiled location reference
Source entity
Campus
Method
direct_unique_named_point_from_property_embedded_google_mymaps_kml
Derivation
direct_geometry
Precision scope
Main entrance marker for the parent Shippingport Industrial Park property. It does not locate an individual Aligned building, the three-facility campus centroid, construction work limits or a legal parcel boundary.
Horizontal uncertainty
Not reported

Source gives no measured positional accuracy. Offset from the parent entrance to individual proposed DC buildings is unknown; decimal precision is not survey accuracy.

Geometry evidence
005e120e

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Aligned Project Phoenix, Shippingport
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Aligned announces Project Phoenix at Shippingport
Archived copy
Aligned Data Centers
Company disclosure
Project announcement, Operator claimall-rights-reservedAligned Data Centers260e397df39b70ff8ec0f1cea845f7ccaa5e07f19ceb0c3c64a7969e9ef7866f
Retained source material; see source provenance
Aligned Pennsylvania campus and PIT-01 address
Archived copy
Aligned Data Centers
Company disclosure
Site and project identitynot statedall-rights-reservedAligned Data Centers94526a8d62b7ab75a3acd336d7636f355f72580e659ada1e602546e99cb7762a
Retained source material; see source provenance
Aligned Shippingport community construction schedule
Archived copy
Aligned Data Centers
Company disclosure
Site and project identitynot statedall-rights-reservedAligned Data Centers5ea897b8136af44d4ec9bfde98926c9533e9bda24a425404d5fa5fc467e788fe
Retained source material; see source provenance
Pennsylvania construction directory Project Phoenix SCCM00016473
Archived copy
Pennsylvania Department of General Services; filing by Aligned Data Centers LLC
Government record
Site and project identity, Owner claimsource-specific-termsPennsylvania Department of General Services; filing by Aligned Data Centers LLCe773cff22d68008e968e6c36d32c1c60d2b27a8e706e0ecc9a3b5bc16a2b4fce
Retained source material; see source provenance
Project Phoenix Gate 17 planned blasting traffic map
Archived copy
Aligned Data Centers; Google Earth basemap
Company disclosure
Site and project identitynot statedall-rights-reservedAligned Data Centers; Google Earth basemap539dd5708348be203e06f65a07988dc5fab190aab647cc8d187756768060f40f
Retained source material; see source provenance
Property-selected Shippingport Industrial Park map: Main Site Entrance
Archived copy
Shippingport Industrial Park / Frontier Group of Companies via Google My Maps
Map feature
Geometrynot statedsource-specific-termsShippingport Industrial Park / Frontier Group of Companies via Google My Maps82bdec50c85e6ec755eb8e5b02414a8ec025148f0b7270a8f0ccd71a13c92560
Retained source material; see source provenance
Shippingport Industrial Park site-map page
Archived copy
Shippingport Industrial Park / Frontier Group of Companies
Company disclosure
Site and project identitynot statedsource-specific-termsShippingport Industrial Park / Frontier Group of Companiesc6000ace79eab38195cdb959371dfa317767a014703549fb1dde79435e5a8cd9
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Aligned Project Phoenix, Shippingport [site vcc-site-b336a1eb615ea1635dc7]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b336a1eb615ea1635dc7/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction