Core Scientific Denton data center (CoreWeave)

Under construction

United States · 1 project · Last reported

Summary

Core Scientific campus at 8171 Jim Christal Road in Denton, Texas, with 394 MW of gross utility power capacity from Denton Municipal Electric, being fitted out as high-density colocation for CoreWeave as Core Scientific converts its facilities from digital asset mining to HPC colocation. A February 2025 expansion added 70 MW of contracted power and raised CoreWeave's critical IT load at the site to about 260 MW, adding $1.2 billion of contracted revenue. The campus covers 78 acres, and Core Scientific says it is expected to host one of North America's largest supercomputers.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 33.21640, -97.12920 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Core Scientific Denton data center (CoreWeave)

Under construction last observed as of · Reported status

Location: Denton, Texas, US. City coordinates from Wikipedia. Core Scientific gives the address 8171 Jim Christal Rd, Denton, TX 76207, but it was not geocoded in this review. U.S. Securities and Exchange Commission (Core Scientific filing); Core Scientific; Wikipedia

Use: Hpc, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity394 MWContracted · Campus · Grid connection2025-12-31Gross utility power capacity from Denton Municipal Electric per the 10-K; the company site lists 394 MW of total power capacity.U.S. Securities and Exchange Commission (Core Scientific filing); Core Scientific
Power capacityabout 260 MWContracted · Campus · It load2025-02-26Critical IT load for CoreWeave after the February 2025 expansion of 70 MW of contracted power.Core Scientific
Land area78 acresReported · Campus2026-10-09From Core Scientific's undated Denton page, as accessed.Core Scientific

Companies and organizations

NameRoleNotesSources
Core ScientificDeveloperCore Scientific; Core Scientific
Core ScientificOperatorU.S. Securities and Exchange Commission (Core Scientific filing); Core Scientific
CoreWeaveTenantColocation customer for about 260 MW of critical IT load at Denton. The release cites 12-year contract terms across Core Scientific's CoreWeave agreements and two five-year renewal options for the added 70 MW.Core Scientific
Denton Municipal ElectricUtilityU.S. Securities and Exchange Commission (Core Scientific filing)

Timeline

DateEventActual or plannedNotesSources
2025-02-26Expansion announcedActualCore Scientific and CoreWeave announced a $1.2 billion contracted-revenue expansion at Denton; Core Scientific funds $104 million of the added capex and CoreWeave the rest.Core Scientific
2027-H1OtherPlannedCompany-wide target to deliver about 590 MW to CoreWeave by early 2027; Denton-specific timing is not stated.Core Scientific

Power supply

TypeDescriptionSources
GridDenton Municipal Electric supplies 394 MW of gross utility power capacity.U.S. Securities and Exchange Commission (Core Scientific filing)

Status date is the access date of Core Scientific's undated Denton page, which still describes the supercomputer as expected. The sources reviewed do not state how much of the Denton conversion is energized. In March 2026 Core Scientific reported about 350 MW energized across its CoreWeave sites, and its 10-K says a portion of the converted facilities was operating at the end of 2025 without naming them, so the site may already be partly operational.

Sources for these details
Companies
  • Developer: Core Scientific (unknown scope) evidence
  • Developer: Core Scientific (unknown scope) evidence
  • Operator: Core Scientific (unknown scope) evidence
  • Operator: Core Scientific (unknown scope) evidence
  • Tenant: CoreWeave (unknown scope) evidence
  • Utility: Denton Municipal Electric (unknown scope) evidence
Source and location review
Status source
Denton, TX Data Center | High-Density at Scale evidence row
Core Scientific · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
33.21640, -97.12920
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
City coordinates from Wikipedia. Core Scientific gives the address 8171 Jim Christal Rd, Denton, TX 76207, but it was not geocoded in this review.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
3877ce56

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Core Scientific Denton data center (CoreWeave)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site
Archived copy
Core Scientific
Company disclosure
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Expansion Announced, Role: Developer, Tenant claimsource-terms-not-recordedCore Scientificf40ea9cddcd0775e9bfdbb73879cccfd8d57449bf1627aea456a7b390939d61b
Factual source record; not the publisher page
Core Scientific Announces Fourth Quarter Fiscal Year 2025 Results
Archived copy
Core Scientific
Company disclosure
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedCore Scientific225df35a6283876d6a2dbbaa01e3ed5917dbf10784ba1473947d39ece969fa4c
Factual source record; not the publisher page
Core Scientific, Inc. Form 10-K for the fiscal year ended December 31, 2025
Archived copy
U.S. Securities and Exchange Commission (Core Scientific filing)
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Power Capacity, Power Source: Grid, Operator claim, Role: Utilitysource-terms-not-recordedU.S. Securities and Exchange Commission (Core Scientific filing)69dad069c47a25cf010398ad150e928e231eebc8847e514a282b9f0c439d04d1
Factual source record; not the publisher page
Denton, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia88d5b6cc72d4e44d4a5ca4c96ad9b26eec527502f216022f38d2d7eaff28bc35
Factual source record; not the publisher page
Denton, TX Data Center | High-Density at Scale
Archived copy
Core Scientific
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Role: Developer, Operator claimnot statedsource-terms-not-recordedCore Scientificebc391f0bc0fa5cdfde118f72c6551956c73eb3b70c11dbf293f096d93bda50c
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Core Scientific Denton data center (CoreWeave) [site vcc-site-dadea001f97aa8058f7a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dadea001f97aa8058f7a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction