Stargate Milam County (SB Energy campus)

Under construction

United States · 1 project · Last reported

Summary

A fast-build Stargate AI campus in Milam County, Texas, about 70 miles northeast of Austin, developed by SoftBank in partnership with OpenAI, with SoftBank's SB Energy providing the powered infrastructure. It was announced in September 2025 as one of two SoftBank sites that together could scale to 1.5 GW within about 18 months, and SoftBank said then that it was breaking ground. Analyst Epoch AI projects about 1.2 GW for this site, saw steel framing and roofing on the first building in March 2026 imagery, and cites state filings pointing to delivery of that building by October 2026. SB Energy plans to fund and build new generation and storage for most of the campus power.

Source record as of 2026-04-17 · Details and sources

SB Energy's Milam Data Center site, in its Internet Archive copy of 1 October 2026, says the Milam Data Center is a 1 GW+ AI data center that SB Energy is developing and will own and operate, that 'Phase 1 of the project is in construction', that the project 'is currently employing over 1,000 craft workers' and that OpenAI is the customer. This refreshes the record's under-construction observation of 17 April 2026 with SB Energy's own statement as published on 1 October 2026 (the archive capture day). Only Phase 1 is stated to be in construction; first operations in 2027 are a forecast, and no completion, commissioning, capacity in service or building count is inferred. evidence

SB Energy (Energy Global, LP), Milam Data Center site (Internet Archive copy) · publication date not stated

Location

The interactive map needs JavaScript. Display anchor: 30.76270, -96.99820 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

Stargate Milam County (SB Energy campus)

Under construction last observed as of · Authoritative status update

This record reports under construction as of 2026-04-17. Data Center Knowledge (Bloomberg); Epoch AI

Location: Milam County, Texas, US. Milam County centroid from OpenStreetMap Nominatim. Sources name only the county, which Epoch AI places about 70 miles northeast of Austin; no site address was found. SoftBank Group Corp.; Epoch AI

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 1,200 MWPlanned · Campus · Facility2026-04-17Analyst estimate, not a company disclosure: Epoch AI's projection of total facility power. SoftBank only gave 1.5 GW as the combined scale for this site and Lordstown, Ohio.Epoch AI

Companies and organizations

NameRoleNotesSources
SoftBank GroupDeveloperDevelops the site in partnership with OpenAI. Analyst Epoch AI, not a company disclosure, lists SoftBank as owner of the AI hardware.SoftBank Group Corp.; Data Center Knowledge (Bloomberg)
OpenAIDeveloperNamed with SoftBank as partner for the two SoftBank Stargate sites.SoftBank Group Corp.
SB EnergyDeveloperAnalyst Epoch AI, not a company disclosure, says the SoftBank subsidiary is building and operating the site.Epoch AI
SB EnergyPower supplierProvides the powered infrastructure; Epoch AI (analyst) reports it plans new generation and storage for most of the campus load.SoftBank Group Corp.; Data Center Knowledge (Bloomberg); Epoch AI

Timeline

DateEventActual or plannedNotesSources
2025-09-23AnnouncedActualAnnounced with Lordstown, Ohio as the two SoftBank Stargate sites, together able to scale to 1.5 GW over about 18 months.SoftBank Group Corp.; Data Center Knowledge (Bloomberg)
2025-09Construction startedActualSoftBank said at the announcement that it was breaking ground; analyst Epoch AI separately dates the start to Q3 2025.Data Center Knowledge (Bloomberg); Epoch AI
2026-10OtherPlannedAnalyst Epoch AI, not a company disclosure, cites regulatory filings indicating the first building would be delivered to the tenant by October 2026; delivery is not full operation.Epoch AI
2028-Q4Fully operationalPlannedAnalyst estimate by Epoch AI, not a company date.Epoch AI

Power supply

TypeDescriptionSources
OtherSB Energy provides the powered infrastructure; analyst Epoch AI reports it plans to fund and build new generation and storage to supply most of the campus's power, with the generation type not disclosed.SoftBank Group Corp.; Epoch AI

No 2026 company or local news source on this site was opened in this review; the newest status evidence is analyst Epoch AI's April 2026 imagery review, which is an analyst assessment rather than a company disclosure.

Sources for these details
Companies
  • Developer: SoftBank Group (unknown scope) evidence
  • Developer: SoftBank Group (unknown scope) evidence
  • Developer: OpenAI (unknown scope) evidence
  • Developer: SB Energy (unknown scope) evidence
  • Power Supplier: SB Energy (unknown scope) evidence
  • Power Supplier: SB Energy (unknown scope) evidence
  • Power Supplier: SB Energy (unknown scope) evidence
Source and location review
Status source
Internet Archive copy (1 October 2026) of Milam Data Center: Our Commitment evidence row
SB Energy (Energy Global, LP), Milam Data Center site (Internet Archive copy) · publication date not stated · Company disclosure
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 26 days before the data update on 2026-10-27

Location details
Coordinates
30.76270, -96.99820
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Milam County centroid from OpenStreetMap Nominatim. Sources name only the county, which Epoch AI places about 70 miles northeast of Austin; no site address was found.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
882a168d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Stargate Milam County (SB Energy campus)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Internet Archive copy (1 October 2026) of Milam Data Center: Our Commitment
Archived copy
SB Energy (Energy Global, LP), Milam Data Center site (Internet Archive copy)
Company disclosure
Physical statusnot statedall-rights-reservedSB Energy / Energy Global, LP, milamdc.com; copy held by the Internet Archive6a32aee8ab376c06efb25b9d5d5066b9bb6f355bf4e6295fc923c9cc013007b5
Retained source material; see source provenance
OpenAI Expands Stargate With Five New Data Center Sites Across US
Archived copy
Data Center Knowledge (Bloomberg)
Trade publication
Imported: Record, Imported: Status, Milestone: Announced, Milestone: Construction Started, Role: Developer, Role: Power Suppliersource-terms-not-recordedData Center Knowledge (Bloomberg)ab2e530cb1a954b8a20b2611ad1ccc0e7fc1dd935098751bc2b7952e8fd9db00
Factual source record; not the publisher page
OpenAI Stargate: where the US sites stand
Archived copy
Epoch AI
Analyst report
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Milestone: Fully Operational, Milestone: Other, Power Source: Other, Role: Developer, Role: Power Suppliersource-terms-not-recordedEpoch AI01a95f1bf56aa1c6f8fff408ee272e071e1b97e82a588a0e6a704a068d6299ef
Factual source record; not the publisher page
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites
Archived copy
SoftBank Group Corp.
Company disclosure
Imported: Geometry, Imported: Record, Milestone: Announced, Power Source: Other, Role: Developer, Role: Power Suppliersource-terms-not-recordedSoftBank Group Corp.e89e41d51eecfd494c684f2de44dcdd2126139fbc9cf984dbd553a8850b43d2a
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Stargate Milam County (SB Energy campus) [site vcc-site-00432e4e9c8e2d91ff76]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-00432e4e9c8e2d91ff76/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction