Summary

Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany.

Source record as of 2026-07-01 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 40.10380, -82.75352 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Microsoft New Albany Initial Site Preparation

Site preparation last observed as of · Authoritative status update

This record reports under construction as of 2026-07-01. WSYX ABC 6; Microsoft Local; Microsoft Local

Location: Licking County, Ohio, US. County centroid from Nominatim, because the record covers a three-site program in different municipalities (New Albany, Heath and Hebron). Microsoft's pages place the Heath construction entrance on Thornwood Drive and a temporary Hebron construction entrance on Canyon Road. POWER Magazine; Engineering News-Record; Microsoft Local; Microsoft Local

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment1,000,000,000 USDAnnounced · Campus2024-10-28Initial investment announced for the three campuses together; no per-site split was given, and POWER does not say whether the New Albany USD 420 million is part of it.POWER Magazine; Engineering News-Record; Associated Press (via News4JAX)
Investment420,000,000 USDAnnounced · Phase · New Albany datacenter2024-10New Albany's city council approved a 15-year, 100 percent property tax abatement for this building.POWER Magazine; Engineering News-Record
Floor area245,000 sq_ftPlanned · Phase · New Albany datacenter2025-04-10Engineering News-Record
Land area197 acresReported · Phase · New Albany datacenter2025-04-10Engineering News-Record

Companies and organizations

NameRoleNotesSources
MicrosoftDeveloperPOWER Magazine; Engineering News-Record
MicrosoftOwnerENR and Fox 28 report that Microsoft owns the Licking County sites and will keep the land.Engineering News-Record; WSYX/WTTE (Fox 28 Columbus)
Ames ConstructionBuilderContractor clearing the New Albany site before the 2025 pause (ENR) and main contractor for the Heath and Hebron site work in 2026 (Microsoft).Engineering News-Record; Microsoft Local; Microsoft Local

Timeline

DateEventActual or plannedNotesSources
2024-10-28AnnouncedActualPOWER Magazine
2025-04-07PausedActualMicrosoft said it would not move forward at that time, would keep evaluating the sites, would make land at two sites farmable (Heath and Hebron, per ENR), and would still fund road and utility upgrades under its development agreements.Engineering News-Record; WSYX/WTTE (Fox 28 Columbus); Associated Press (via News4JAX)
2026-02-24Construction startedActualCeremonial groundbreaking at the Heath site off Thornwood Drive; Microsoft's Heath and Hebron pages report mass grading from February 2026 and tree clearing in March 2026.WSYX ABC 6; Microsoft Local; Microsoft Local
2026-11OtherPlannedTarget finish of mass grading at Heath and Hebron; Microsoft says early site preparation should be largely done by year-end and has not set a vertical construction timeline.Microsoft Local; Microsoft Local

This record groups three sites because the cited sources present them as one program under a single USD 1 billion announcement; split into per-site records if site-level power or investment figures are found. Status reflects site preparation at Heath and Hebron; the New Albany building was on hold as of April 2025 and no later update was found. status_as_of uses the first day of July 2026, the month of the latest entries on Microsoft's month-dated update pages.

Sources for these details
Source and location review
Status source
New Albany datacenter construction update evidence row
Microsoft · published 2023-04-05T17:56:46+00:00 · Company disclosure
Locator
Campus locator · Official source · official_census_address_locator_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 118 days before the data update on 2026-10-27

Location details
Coordinates
40.10380, -82.75352
Geometry licence
public-domain-us-government
Use scope
Campus locator
Scope class
official_census_address_locator_point
Authority
Official source
Source entity
Campus
Method
census_public_ar_current_street_range_interpolation
Derivation
official_address_geocode
Precision scope
Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position.
Horizontal uncertainty
Not reported

The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.

Geometry evidence
35c41e3e

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Microsoft New Albany Datacenter
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Census Public_AR_Current match for 3287 Beech Road
Archived copy
United States Census Bureau
Government record
Geometrynot statedpublic-domain-us-governmentUnited States Census Bureau639b956e41113b6ebc44c5c7e9da794248c1222203fd287c250cbdbbbc99c025
Retained source material; see source provenance
Heath breaks ground on Microsoft data center expected to bring hundreds of jobs
Archived copy
WSYX ABC 6
News
Context: Multi Site Program, Imported: Record, Imported: Status, Milestone: Construction Startedsource-terms-not-recordedWSYX ABC 6077c88fcb3903a412c0e8ae2f77cbeb068ef685651e433f50beab093f1c8b57d
Factual source record; not the publisher page
Heath datacenter construction updates
Archived copy
Microsoft Local
Company disclosure
Context: Multi Site Program, Imported: Geometry, Imported: Record, Imported: Status, Milestone: Construction Started, Milestone: Other, Role: Buildersource-terms-not-recordedMicrosoft Local90700aaca72b6d70bd4e349dcf60124e1923cfb1437c2b93dc8771e2a2d9afaa
Factual source record; not the publisher page
Hebron datacenter construction update
Archived copy
Microsoft Local
Company disclosure
Context: Multi Site Program, Imported: Geometry, Imported: Record, Imported: Status, Milestone: Construction Started, Milestone: Other, Role: Buildersource-terms-not-recordedMicrosoft Local4e6a6eec4e909e9fe7e17d508996fef66e946105d91b5899ea58d3cf9f707e43
Factual source record; not the publisher page
Licking County parcel owner and situs-address facts for three Microsoft campuses
Archived copy
Licking County, Ohio
Government record
Geometry identity contextnot statedrights-status-uncertain-fact-extraction-onlyLicking County, Ohio7074823e9d79249fef18aba0774be26a8dc34a49a5a9d281c13973ce020cd6c5
Retained source material; see source provenance
Microsoft 'not moving forward' with $1B Licking County data center plans right now
Archived copy
WSYX/WTTE (Fox 28 Columbus)
News
Context: Multi Site Program, Imported: Record, Milestone: Paused, Owner claimsource-terms-not-recordedWSYX/WTTE (Fox 28 Columbus)85ce634cb2c5bf5e6e14543aefc3ebc37c9616ad3638d4288a38f0627b43d29b
Factual source record; not the publisher page
Microsoft Announces $1 Billion Investment in Ohio Data Centers as Officials Ponder Power Demands
Archived copy
POWER Magazine
Trade publication
Context: Multi Site Program, Imported: Geometry, Imported: Record, Metric: Investment, Milestone: Announced, Role: Developersource-terms-not-recordedPOWER Magazine6391ae9fafb4bb377be33de42036539c42ae3647b15218a70bdf7bdf14cbacec
Factual source record; not the publisher page
Microsoft Hits Pause Button on $1B in Data Centers in Ohio
Archived copy
Engineering News-Record
Trade publication
Context: Multi Site Program, Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Paused, Role: Builder, Role: Developer, Owner claimsource-terms-not-recordedEngineering News-Recordf2935b45398d6e2da10846e47bae4d560dad4d40e39592f313a08c14bcdd22c0
Factual source record; not the publisher page
Microsoft says it's 'slowing or pausing' some AI data center projects, including $1B plan for Ohio
Archived copy
Associated Press (via News4JAX)
News
Context: Multi Site Program, Imported: Record, Metric: Investment, Milestone: Pausedsource-terms-not-recordedAssociated Press (via News4JAX)bd5ad10438e64d76223c9b4ce2909cdfe34a4810307023ff31655e907d78779c
Factual source record; not the publisher page
New Albany datacenter construction update
Archived copy
Microsoft
Company disclosure
Source location context, Physical statusall-rights-reservedMicrosoft Local8dd20a8d7323ca08508cf4c2515f36fcb0d81577e8e75a73cb22485afbf286d6
Retained source material; see source provenance