TeraWulf Justified Data campus (Hawesville)

Announced

United States · 1 project · Last reported

Summary

TeraWulf is redeveloping the former Century Aluminum facility at Hawesville, Kentucky, acquired in early 2026, into an AI data center campus with more than 250 buildable acres, an energized on-site substation and about 480 MW of available power. In July 2026 Anthropic signed a 20-year lease for about 401 MW of critical IT load, expected to bring about $19 billion of rent over the initial term. Kentucky regulators approved a retail electric service agreement of up to 482 MW in August 2026. TeraWulf targets initial capacity in the second half of 2027 and the full 401 MW by early 2028.

Source record as of 2026-08-24 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 37.90110, -86.74940 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

TeraWulf Justified Data campus (Hawesville)

Announced last observed as of · Reported status

Location: Hawesville, Hancock County, Kentucky, US. City coordinates from Wikipedia. TeraWulf places the campus at the former Century Aluminum Hawesville facility in Hancock County, whose exact position is not given in the sources. TeraWulf; TeraWulf; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 401 MWContracted · Campus · It load2026-07-06TeraWulf; TeraWulf
Power capacityup to 482 MWContracted · Campus · Grid connection2026-08-21Electric service under the agreement approved by the Kentucky PSC; TeraWulf earlier described about 480 MW of existing power availability at the site.TeraWulf
Investment4,000,000,000–4,500,000,000 USDAnnounced · Phase · Site development and initial data halls2026-08-24TeraWulf estimate based on $10 million to $12 million per MW of critical IT load; excludes customer investment in computing equipment.TeraWulf
Land areamore than 250 acresAcquired · Campus2026-02-02Buildable acres.TeraWulf; TeraWulf

Companies and organizations

NameRoleNotesSources
TeraWulfDeveloperTeraWulf; TeraWulf; TeraWulf
TeraWulfOwnerAnnounced on February 2, 2026 that it had acquired the site.TeraWulf
AnthropicTenant20-year lease for about 401 MW of critical IT load signed in July 2026.TeraWulf; TeraWulf
Big Rivers Electric CorporationUtilityThe Kentucky PSC authorized Big Rivers and Kenergy to implement the retail electric service agreement for the campus.TeraWulf
Kenergy Corp.UtilityThe Kentucky PSC authorized Kenergy and Big Rivers to implement the retail electric service agreement for the campus.TeraWulf
Kentucky Public Service CommissionGovernmentApproved the retail electric service agreement in an order dated August 21, 2026.TeraWulf

Timeline

DateEventActual or plannedNotesSources
2026-02Site acquiredActualTeraWulf announced on February 2, 2026 that it had acquired the Hawesville site.TeraWulf
2026-07-06OtherActualAnthropic lease announced.TeraWulf
2026-08-21OtherActualKentucky PSC approved the up-to-482 MW retail electric service agreement.TeraWulf
2027-H2First operationalPlannedInitial capacity expected in service.TeraWulf; TeraWulf
2028-H1Fully operationalPlannedTeraWulf expects the full 401 MW by early 2028.TeraWulf; TeraWulf

Power supply

TypeDescriptionSources
GridUp to 482 MW of retail electric service under a PSC-approved agreement implemented by Kenergy and Big Rivers, using the site's energized on-site substation and existing high-voltage transmission lines.TeraWulf; TeraWulf
Sources for these details
Companies
  • Developer: TeraWulf (unknown scope) evidence
  • Developer: TeraWulf (unknown scope) evidence
  • Developer: TeraWulf (unknown scope) evidence
  • Owner: TeraWulf (unknown scope) evidence
  • Tenant: Anthropic (unknown scope) evidence
  • Tenant: Anthropic (unknown scope) evidence
  • Utility: Big Rivers Electric Corporation (unknown scope) evidence
  • Utility: Kenergy Corp. (unknown scope) evidence
  • Government: Kentucky Public Service Commission (unknown scope) evidence
Source and location review
Status source
Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus evidence row
TeraWulf · published 2026-08-24 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 64 days before the data update on 2026-10-27

Location details
Coordinates
37.90110, -86.74940
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
City coordinates from Wikipedia. TeraWulf places the campus at the former Century Aluminum Hawesville facility in Hancock County, whose exact position is not given in the sources.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
30a8faac

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for TeraWulf Justified Data campus (Hawesville)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Hawesville, Kentucky
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia26df9ae29d5224ff67ab5797dda14fca284708b1746aeadf8feafa84e147d82b
Factual source record; not the publisher page
Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus
Archived copy
TeraWulf
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedTeraWulf3d07d65f0b1f48a1dd73eec327d3c1a80aabf310eca034d6425f9f7621978db5
Factual source record; not the publisher page
TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack
Archived copy
TeraWulf
Company disclosure
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Fully Operational, Milestone: Other, Role: Developer, Tenant claimsource-terms-not-recordedTeraWulf8f3ba7efba6877c06ba9debd32310b140fbcc2d62d7867f65acc057410237bb1
Factual source record; not the publisher page
TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland
Archived copy
TeraWulf
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Milestone: Site Acquired, Power Source: Grid, Role: Developer, Owner claimsource-terms-not-recordedTeraWulf794aa7ac7eee14a2147b480adfd8d58d37b6c2820061b4b72a658a708fa7064d
Factual source record; not the publisher page
TeraWulf Reports Second Quarter 2026 Results
Archived copy
TeraWulf
Company disclosure
Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Fully Operational, Tenant claimsource-terms-not-recordedTeraWulf0c3004f18a62bca4ae621d7f5be9526fb5c45eaab01faa0a89bc27ac68917046
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). TeraWulf Justified Data campus (Hawesville) [site vcc-site-dbe568d910290db51ead]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dbe568d910290db51ead/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction