PowerHouse Louisville hyperscale campus (Camp Ground Road)

Under construction

United States · 1 project · Last reported

Summary

Hyperscale data center campus on Camp Ground Road in southwest Louisville, Kentucky, developed by a joint venture of PowerHouse Data Centers and Louisville-based Poe Companies and billed as the state's first hyperscale campus. Announced in January 2025 as a 400 MW campus with 335 MW of initial LG&E power secured and the first 130 MW due in October 2026, it sits on about 150 acres with zoning already in place. PowerHouse's campus page now lists up to 525 MW of utility power and up to six buildings. Local reporting in mid-2026 described seven warehouse-sized buildings under construction, with the first phase expected online as soon as October 2026; no tenant has been named.

Source record as of 2026-08-13 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 38.25610, -85.75140 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

PowerHouse Louisville hyperscale campus (Camp Ground Road)

Under construction last observed as of · Reported status

Location: Louisville, Jefferson County, Kentucky, US. Local sources place the campus on Camp Ground Road in southern or southwest Louisville without coordinates. The point is the Louisville city coordinate from its Wikipedia article, not the site. WAVE; WAVE; Louisville Public Media; Wikipedia

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity400 MWPlanned · Campus · Unspecified2025-01-16Campus size given at announcement; scope not stated.PPL Corporation / Louisville Gas and Electric; Data Center Frontier
Power capacity335 MWContracted · Campus · Grid connection2025-01-16Initial utility power capacity secured from LG&E, with near-term expansion to up to 402 MW.PPL Corporation / Louisville Gas and Electric; Data Center Frontier
Power capacity130 MWPlanned · Phase · Grid connection · First power delivery (October 2026)2025-01-16PPL Corporation / Louisville Gas and Electric; Data Center Frontier
Power capacityup to 525 MWPlanned · Campus · Grid connection2026-10-09Maximum utility power shown on PowerHouse's undated campus page, accessed 2026-10-09; higher than the 400 MW announced in 2025.PowerHouse Data Centers
Land area154 acresReported · Campus2026-10-09News reports describe 150 acres (2025) or more than 150 acres (2026).PowerHouse Data Centers
Buildingsup to 6 countPlanned · Campus2026-10-09July 2026 local reporting instead described seven warehouse-sized buildings.PowerHouse Data Centers
Floor areaabout 1,800,000 sq_ftPlanned · Campus2026-10-09Developable floor area listed on the campus page as 1.8M sq ft.PowerHouse Data Centers
Jobs permanentabout 200 countPlanned · Campus2025-01-16Operational jobs; hundreds of construction jobs were also expected.WAVE

Companies and organizations

NameRoleNotesSources
PowerHouse Data CentersDeveloperJoint venture partner; a division of American Real Estate Partners.PPL Corporation / Louisville Gas and Electric; Data Center Frontier; WAVE; PowerHouse Data Centers
Poe CompaniesDeveloperLouisville-based joint venture partner, described in July 2026 coverage as building the campus.PPL Corporation / Louisville Gas and Electric; Data Center Frontier; WAVE; WAVE
Louisville Gas and Electric (LG&E)UtilityAnnounced the campus as its first hyperscale data center customer and is building a new switching station.PPL Corporation / Louisville Gas and Electric; Data Center Frontier; WAVE

Timeline

DateEventActual or plannedNotesSources
2025-01-16AnnouncedActualPPL Corporation / Louisville Gas and Electric; WAVE
2025Construction startedPlannedThe January 2025 announcement scheduled construction to begin in 2025 with zoning already in place. Local reporting in July and August 2026 described the campus as under construction; no exact start date was found.PPL Corporation / Louisville Gas and Electric; Data Center Frontier; WAVE; WAVE; Louisville Public Media
2026-Q4First operationalPlannedFirst building targeted for Q4 2026 and the first 130 MW for October 2026; the company website, as reported in July 2026, said the first phase could come online as soon as October.PPL Corporation / Louisville Gas and Electric; Data Center Frontier; PowerHouse Data Centers; WAVE

Power supply

TypeDescriptionSources
GridLG&E supply through a new utility switching station due for completion in September 2026 and a dedicated on-site substation.PPL Corporation / Louisville Gas and Electric; Data Center Frontier; WAVE
OtherBackup generators on site, per local reporting; their fuel is not stated.WAVE

No investment figure was found. The LG&E release names the joint venture but not the street; WAVE's January 2025 report ties it to 150 acres on Camp Ground Road, and the 2026 local reports, which do not mention PowerHouse (one names Poe as the builder), describe the Camp Ground Road campus as under construction. In January 2025 Poe's president said a large technology company would establish a significant presence there without naming it; WAVE suggested Meta or Microsoft as likely, which is unconfirmed. Louisville Metro Council's six-month data center moratorium of August 2026 applies to new proposals. Whether the October 2026 first-phase target was met was not confirmed by 2026-10-09.

Sources for these details
Companies
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: Poe Companies (unknown scope) evidence
  • Developer: Poe Companies (unknown scope) evidence
  • Developer: Poe Companies (unknown scope) evidence
  • Developer: Poe Companies (unknown scope) evidence
  • Utility: Louisville Gas and Electric (LG&E) (unknown scope) evidence
  • Utility: Louisville Gas and Electric (LG&E) (unknown scope) evidence
  • Utility: Louisville Gas and Electric (LG&E) (unknown scope) evidence
Source and location review
Status source
Louisville data center opponents rally at Metro Hall, push for stronger regulations evidence row
WAVE · published 2026-07-18 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 75 days before the data update on 2026-10-27

Location details
Coordinates
38.25610, -85.75140
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Local sources place the campus on Camp Ground Road in southern or southwest Louisville without coordinates. The point is the Louisville city coordinate from its Wikipedia article, not the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
371c4d8b

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for PowerHouse Louisville hyperscale campus (Camp Ground Road)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Let's Go Build Some Data Centers: PowerHouse Drives Hyperscale and AI Infrastructure Across North America
Archived copy
Data Center Frontier
Trade publication
Imported: Record, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedData Center Frontier812fdfd16ef26943a6adc0c8137de5a0c0d540506b7cac02d5c306cb5ef2e87a
Factual source record; not the publisher page
LG&E announces first major data center electric customer
Archived copy
PPL Corporation / Louisville Gas and Electric
Utility disclosure
Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Milestone: First Operational, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedPPL Corporation / Louisville Gas and Electric9615621d341535196297871902a6d67b7365f7d835764488ebfc476f91506004
Factual source record; not the publisher page
Louisville data center opponents rally at Metro Hall, push for stronger regulations
Archived copy
WAVE
News
Imported: Geometry, Imported: Record, Imported: Status, Milestone: Construction Started, Milestone: First Operational, Power Source: Grid, Power Source: Other, Role: Developersource-terms-not-recordedWAVE107d3e4032c13a543c606152fbe96495cc86f98af9f728e479f558ac3c9a0465
Factual source record; not the publisher page
Louisville Metro Council approves data center moratorium as new proposal sparks controversy
Archived copy
Louisville Public Media
News
Imported: Geometry, Imported: Record, Imported: Status, Milestone: Construction Startedsource-terms-not-recordedLouisville Public Media90cc4952d6c8e76e656bd810dd3318b0b88fe8490beeacef600fefee4eb6e085
Factual source record; not the publisher page
Louisville to welcome Kentucky's first Hyperscale Data Center
Archived copy
WAVE
News
Imported: Geometry, Imported: Record, Metric: Jobs Permanent, Milestone: Announced, Milestone: Construction Started, Role: Developer, Role: Utilitysource-terms-not-recordedWAVE31f0ed519d8e2696eb2edee36b2f44a3a4c53ff2d2d584ad80bed0252425a821
Factual source record; not the publisher page
Louisville, Kentucky
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediad83ca0baba2bbf667db792586d232bf3dba561e3189374a01dfb0a13979548c3
Factual source record; not the publisher page
PowerHouse Louisville
Archived copy
PowerHouse Data Centers
Company disclosure
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Role: Developernot statedsource-terms-not-recordedPowerHouse Data Centers8a68b1a27db61988e93acc271ea746c754d2294cd0e19e80de41f826c0d76673
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). PowerHouse Louisville hyperscale campus (Camp Ground Road) [site vcc-site-f7c2acac6f50afd8adde]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f7c2acac6f50afd8adde/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction